Event Notification Report for July 1, 2003
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 06/30/2003 - 07/01/2003 ** EVENT NUMBERS ** 39958 39965 39966 39967 39968 39969 39970 +------------------------------------------------------------------------------+ |General Information or Other |Event Number: 39958 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: NC DIV OF RADIATION PROTECTION |NOTIFICATION DATE: 06/25/2003| |LICENSEE: BARNHILL CONTRACTING COMPANY |NOTIFICATION TIME: 10:45[EDT]| | CITY: CHAPEL HILL REGION: 2 |EVENT DATE: 06/25/2003| | COUNTY: STATE: NC |EVENT TIME: 10:20[EDT]| |LICENSE#: AGREEMENT: Y |LAST UPDATE DATE: 06/26/2003| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |CHARLES R. OGLE R2 | | |DOUG BROADDUS NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: SHARN JEFFRIES | | | HQ OPS OFFICER: STEVE SANDIN | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |NAGR AGREEMENT STATE | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | DAMAGED TROXLER DENSITY GAUGE | | | | At 1020 EDT on 6/25/03, the NC Radiation Protection Section was notified | | that a portable nuclear gauge being used was run over by a passenger van at | | the intersection of Faivon and Bucchaneer Roads (near Hwy 40 and the 55 | | interchange). The Authorized User is on site and has the gauge cordoned off | | as per emergency procedures require. The van involved in the collision is | | being detained.. Both the RSO and Alt RSO are enroute to perform surveys (1 | | hour). | | | | NC Radiation Protection Section personnel are responding to the scene to | | perform surveys (30 mins). | | | | The device is described as a Troxler Gauge containing 8 millicuries Cs-137. | | NC Incident Report No.: 03-27. | | | | * * * UPDATE 0952 EDT ON 6/26/03 FROM NC RAD PROTECTION VIA FAX * * * | | | | The following additional information was provided by NC: | | | | Incident Location: Chapel Hill, NC . Intersection of Faison and Buckner | | Roads. Take 40 West from Raleigh to the NC54 exit towards Chapel Hill. Take | | a right onto Meadowmont, then a left onto Sprunt. Follow Sprunt to Weaver | | Lane and take a right onto Weaver Lane. Take a right on Faison off of Weaver | | lane, go downhill to the intersection of Faison and Buckner. | | | | Brief Description of Incident: Paving contractor in a commercial van was not | | watching where he was driving and ran over the instrument panel part of a | | Troxler model 4640B thin lift density gauge. The licensee was performing a | | standardization count on the gauge at the time of the accident so the source | | was in the shielded position when it was run over. The gauge was pushed off | | the standardization plate and dragged about 3 feet. The gauge then rolled | | onto it's side and the source handle was shoved into the asphalt. The | | licensee stopped the van and detained it and the driver until the gauge | | could be surveyed and it was determined that there were no loose source or | | contamination concerns. The area was cordoned off with pink surveyors' tape | | and controlled until the gauge and accident area was surveyed and the gauge | | returned to the Troxler shipping container. Survey results of the gauge done | | by both the licensee and the NCDENR RAM Branch were consistent with an | | undamaged gauge. The licensee placed the gauge into the Troxler | | transportation case for delivery to Troxler for leak testing and servicing. | | The damage appears to be cosmetic with some damage to be expected to the | | electronics. | | | | Radiological Information: Isotope(s): Cesium-137, Activity: 8 millicuries, | | Device: Troxler Gauge, model 4640B | | | | Notified R2DO (C. Ogle) and NMSS (Broaddus). | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39965 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: COLUMBIA GENERATING STATIREGION: 4 |NOTIFICATION DATE: 06/30/2003| | UNIT: [2] [] [] STATE: WA |NOTIFICATION TIME: 14:39[EDT]| | RXTYPE: [2] GE-5 |EVENT DATE: 06/30/2003| +------------------------------------------------+EVENT TIME: 09:18[PDT]| | NRC NOTIFIED BY: SCOTT BURTON |LAST UPDATE DATE: 06/30/2003| | HQ OPS OFFICER: HOWIE CROUCH +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |CHARLES MARSCHALL R4 | |10 CFR SECTION: | | |ARPS 50.72(b)(2)(iv)(B) RPS ACTUATION - CRITICA| | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |2 A/R Y 79 Power Operation |0 Hot Shutdown | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | VALID REACTOR PROTECTION SYSTEM ACTUATION | | | | The following information was obtained from the licensee via facsimile: | | | | "This event notification is being made to report the valid actuation of the | | reactor protection system when the reactor was critical, and subsequent | | reactor scram. On June 30, 2003, [at 0918 PDT], the plant was in Mode 1 at | | 79% power, when a turbine trip occurred, followed by a reactor scram. The | | cause of the turbine trip is unknown at this time. All plant systems | | functioned properly in response to the scram. Operators are proceeding to | | bring the plant to Mode 4, Cold Shutdown, while investigation into the cause | | of the transient is completed." | | | | During the scram, all rods inserted into the core. There were no lifts of | | power-operated or manual relief valves during the transient. The electrical | | grid is stable and powering all safety equipment. There were no other | | specified system actuations. Decay heat is being removed via the bypass | | valves to the main condenser. | | | | The licensee has informed the NRC Resident Inspector. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39966 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: PERRY REGION: 3 |NOTIFICATION DATE: 06/30/2003| | UNIT: [1] [] [] STATE: OH |NOTIFICATION TIME: 15:54[EDT]| | RXTYPE: [1] GE-6 |EVENT DATE: 06/30/2003| +------------------------------------------------+EVENT TIME: 15:41[EDT]| | NRC NOTIFIED BY: DAVE BLOUNT |LAST UPDATE DATE: 06/30/2003| | HQ OPS OFFICER: HOWIE CROUCH +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |BRENT CLAYTON R3 | |10 CFR SECTION: |TIM MCGINTY IRO | |AAEC 50.72(a) (1) (i) EMERGENCY DECLARED |BOB DENNIG NRR | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | UNUSUAL EVENT DECLARED DUE TO SEISMIC EVENT IN THE AREA | | | | At 1541 EDT on 6/30/03, Perry Nuclear Plant declared an Unusual Event due | | to a seismic event. No immediate issues were noticed. The operating-basis | | earthquake/safe-shutdown annunciator did not alarm, however the plant did | | receive a seismic panel alarm. The set point for the alarm is 0.005g. | | There were no unplanned radioactive releases. No protective action | | recommendations are advised by the licensee. State and local counties | | (Lake, Geauga and Ashtabula) have been informed. | | | | The National Earthquake Information Center has preliminary indications that | | the earthquake measured 3.4 on the Richter scale at 41.7 N latitude and 81.2 | | W longitude near Painesville, OH. | | | | The licensee has notified the NRC Resident Inspector | | | | * * * UPDATE AT 2242 ON 06/30/03 CARMAN TO GOTT * * * | | | | Licensee terminated from unusual event. Action needed to terminate from the | | unusual event was a plant walk down. The licensee completed same with no | | plant damage identified, no unplanned radiological release, and no planned | | corrective actions. | | | | The licensee notified the NRC Resident and Senior Resident Inspectors. | | | | Notified NRR EO (Ruland), DIRO Manager (McGinty), DHS (Murray), FEMA | | (Stiendurf), and R3DO (Clayton) | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39967 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: SEABROOK REGION: 1 |NOTIFICATION DATE: 06/30/2003| | UNIT: [1] [] [] STATE: NH |NOTIFICATION TIME: 17:20[EDT]| | RXTYPE: [1] W-4-LP |EVENT DATE: 06/30/2003| +------------------------------------------------+EVENT TIME: 14:59[EDT]| | NRC NOTIFIED BY: RON STRICKLAND |LAST UPDATE DATE: 06/30/2003| | HQ OPS OFFICER: BILL GOTT +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |RICHARD BARKLEY R1 | |10 CFR SECTION: |DIANE SCRENCI R1PA | |APRE 50.72(b)(2)(xi) OFFSITE NOTIFICATION |WILLIAM BEECHER PAO | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | OFFSITE NOTIFICATION DUE TO FIRE | | | | "At 1459 EDT 06/30/03 a fire was reported on Unit II containment. The fire | | was on wooden staging, and was about the size of a normal campfire. The | | fire was a result of the disassembly of the Unit II containment dome. Per | | procedure, the Seabrook Fire Department was called and responded. The fire | | was extinguished by the Unit II disassembly crew (the onsite fire brigade | | did not respond because the fire was outside of the Unit I protected area). | | The Seabrook Fire Department was not used to extinguish the fire. Corporate | | Communications Group have been in contact with Channel 9 and with the | | Associated Press. The fire was extinguished at 1535 using prestaged hoses. | | The fire water was provided by Hydrant #15 of Seabrook Station's Fire | | Protection System." | | | | The NRC Resident Inspector was notified. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39968 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: BRUNSWICK REGION: 2 |NOTIFICATION DATE: 06/30/2003| | UNIT: [1] [] [] STATE: NC |NOTIFICATION TIME: 17:30[EDT]| | RXTYPE: [1] GE-4,[2] GE-4 |EVENT DATE: 06/30/2003| +------------------------------------------------+EVENT TIME: 17:10[EDT]| | NRC NOTIFIED BY: D. W. BAIN |LAST UPDATE DATE: 06/30/2003| | HQ OPS OFFICER: ERIC THOMAS +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |CHARLES R. OGLE R2 | |10 CFR SECTION: | | |ASHU 50.72(b)(2)(i) PLANT S/D REQD BY TS | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 93 Power Operation |92 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | TECH SPEC REQUIRED SHUTDOWN | | | | On June 30, 2003, at 1710 EDT, Unit 1 reactor power was decreased, | | initiating a reactor shutdown required by | | Technical Specification (TS) Limiting Condition for Operation (LCO) 3.4.4 | | due to Reactor Coolant System (RCS) | | operational leakage exceeding a TS LCO limit. At 0615 hours, TS LCO 3.4.4 | | was entered due to an increase in | | unidentified leakage of greater than 2 gpm (gallons per minute) within the | | previous 24 hour period. Leakage increased from 0.63 gpm on June 29, 2003 | | at 2000 EDT, to 2.69 gpm on June 30, 2003 at 0615 EDT. Required Actions | | from LCO 3.4.4 are to reduce leakage to within TS limits within 8 hours or | | be in Mode 3 (Hot Shutdown) in 12 hours and Mode 4 (Cold Shutdown) in 36 | | hours. As of 1700 EDT, leakage could not be reduced to exit the TS LCO | | Condition. | | | | The licensee notified the NRC Resident Inspector. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Research Reactor |Event Number: 39969 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: MASSACHUSETTS INSTITUTE OF TECH |NOTIFICATION DATE: 06/30/2003| | RXTYPE: 5000 KW TANK RESEARCH HW |NOTIFICATION TIME: 17:44[EDT]| | COMMENTS: |EVENT DATE: 06/30/2003| | |EVENT TIME: 06:45[EDT]| | |LAST UPDATE DATE: 06/30/2003| | CITY: CAMBRIDGE REGION: 1 +-----------------------------+ | COUNTY: MIDDLESEX STATE: MA |PERSON ORGANIZATION | |LICENSE#: R-37 AGREEMENT: N |RICHARD BARKLEY R1 | | DOCKET: 05000020 |ALEXANDER ADAMS NRR | +------------------------------------------------+ | | NRC NOTIFIED BY: JOHN BERNARD | | | HQ OPS OFFICER: BILL GOTT | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |NINF INFORMATION ONLY | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | OPERATOR ASLEEP AT REACTOR CONTROLS | | | | The following was emailed from the licensee to the NRC Project Manager: | | | | "The licensee Facility Director called the NRC project manager to report | | that on 6/29/03 between 0605 EDT and 0645, the operator at the control | | console fell asleep for approximately 25 minutes. The operator had logged | | console operations at 0605 and 0645. Other licensee personnel had tried to | | contact the console operator during this time period without success. The | | licensee is investigating the event and will review this situation with all | | reactor operators." | | | | This is in violation of 10 CFR 50.54 (k). | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39970 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: MONTICELLO REGION: 3 |NOTIFICATION DATE: 07/01/2003| | UNIT: [1] [] [] STATE: MN |NOTIFICATION TIME: 00:04[EDT]| | RXTYPE: [1] GE-3 |EVENT DATE: 06/30/2003| +------------------------------------------------+EVENT TIME: 15:45[CDT]| | NRC NOTIFIED BY: DAVID BARNETT |LAST UPDATE DATE: 07/01/2003| | HQ OPS OFFICER: MIKE RIPLEY +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |BRENT CLAYTON R3 | |10 CFR SECTION: | | |AINA 50.72(b)(3)(v)(A) POT UNABLE TO SAFE SD | | |AINB 50.72(b)(3)(v)(B) POT RHR INOP | | |AINC 50.72(b)(3)(v)(C) POT UNCNTRL RAD REL | | |AIND 50.72(b)(3)(v)(D) ACCIDENT MITIGATION | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | HIGH ENERGY LINE BREAK (HELB) DOOR NOT LATCHED | | | | "On June 30, 2003 at approximately 1545 [CDT] it was identified that a High | | Energy Line Break (HELB) door separating Divisional Motor Control Centers | | was not latched as required. It was determined that this condition existed | | for a maximum of 15 minutes. This condition is being reported as an event | | or condition that could have prevented the fulfillment of a safety function | | in accordance with 10 CFR 50.72(b)(3)(v)." | | | | The licensee notified the NRC Resident Inspector and the State Emergency | | Management Agency. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021