The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for April 9, 2003








                    U.S. Nuclear Regulatory Commission

                              Operations Center



                              Event Reports For

                           04/08/2003 - 04/09/2003



                              ** EVENT NUMBERS **



39226  39723  39729  39741  39742  39743  



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   39226       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: PALO VERDE               REGION:  4  |NOTIFICATION DATE: 09/27/2002|

|    UNIT:  [1] [2] [3]               STATE:  AZ |NOTIFICATION TIME: 18:52[EDT]|

|   RXTYPE: [1] CE,[2] CE,[3] CE                 |EVENT DATE:        09/27/2002|

+------------------------------------------------+EVENT TIME:        15:00[MST]|

| NRC NOTIFIED BY:  STROUD                       |LAST UPDATE DATE:  04/08/2003|

|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          NON EMERGENCY         |JOHN PELLET          R4      |

|10 CFR SECTION:                                 |                             |

|APRE 50.72(b)(2)(xi)     OFFSITE NOTIFICATION   |                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|1     N          Y       99       Power Operation  |99       Power Operation  |

|2     N          Y       99       Power Operation  |99       Power Operation  |

|3     N          Y       99       Power Operation  |99       Power Operation  |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| OFF-SITE NOTIFICATION                                                        |

|                                                                              |

| On September 27, 2002 at approximately 15:00 Mountain Standard Time, Palo    |

| Verde Nuclear Generating Station                                             |

| (PVNGS) notified the Environmental Protection Agency (EPA) that a INITIAL    |

| NOTIFICATION OF CONTINUOUS RELEASE was being reported.                       |

|                                                                              |

| The following information was provided to the National Response Center and   |

| State of Arizona:                                                            |

|                                                                              |

| "Palo Verde Nuclear Generating Station is calling to make an initial         |

| notification of a continuous release in accordance                           |

| with CERCLA Section 103(f)(2). 40CFR 302.8 (d).  This is not an accidental   |

| or episodic release.                                                         |

|                                                                              |

| Palo Verde Nuclear Generating Station will be performing a scheduled steam   |

| generator cleaning activity as part of its routine refueling outage for Unit |

| 1.  The steam generator cleaning activity will begin on Saturday, September  |

| 28 at approximately 18:00. During this activity, Palo Verde Nuclear          |

| Generating Station will exceed the Reportable Quantities for the release of  |

| ammonia and hydrazine.  The same activity is scheduled to occur during the   |

| Unit 3 refueling outage, spring of 2003.  The activity occurs approximately  |

| once per every five to seven years on each unit.  The hazardous substances   |

| released are ammonia (CAS #7684-41-7) and hydrazine (CAS #302-01-2).  PVNGS  |

| expects no adverse effects to health and welfare of the general public, nor  |

| to the environment.                                                          |

|                                                                              |

| The NRC Resident Inspector was notified along with the State.                |

|                                                                              |

| * * * UPDATE ON 4/8/03 FROM DAN MARKS TO HOWIE CROUCH * * *                  |

|                                                                              |

| The following information was received from the Licensee via facsimile:      |

|                                                                              |

| "The following event description is a follow-up notification to ENS 39226,   |

| placed at 15:12 Mountain Standard Time (MST) (18:52 ET) on 09/27/2002.       |

|                                                                              |

| "ENS 39226 informed the NRC of a government notification to the National     |

| Response Center (EPA), the State of Arizona and Maricopa County related to a |

| continuous release in accordance with CERCLA [Comprehensive Environmental    |

| Response, Compensation, and Liability Act] Section 103(f)(2), 40 CFR         |

| 302.8(d). This was not an accidental or episodic release. The planned        |

| release was the result of steam generator cleaning activities and would      |

| result in exceeding the Reportable Quantities for the release of ammonia     |

| (CAS #7664-41-7) and hydrazine (CAS #302-01-2).                              |

|                                                                              |

| "Included in the notification was the schedule to occur in Palo Verde Unit 3 |

| during its refueling outage in the spring of 2003.                           |

|                                                                              |

| "Since that original notification, Palo Verde has implemented a condensation |

| unit that captures a large amount of the effluent prior to release.          |

| Although the Reportable Quantities will still be exceeded, the notification  |

| to the National Response Center (EPA), [Maricopa County] and the State of    |

| Arizona will identify the lower levels.                                      |

|                                                                              |

| "The contact name for information concerning this notification is [DELETED], |

| Environmental Section Leader, at telephone number [DELTED].                  |

|                                                                              |

| "As during the previous notification, PVNGS [Palo Verde Nuclear Generating   |

| Station] expects no adverse effects to the health and safety of the public,  |

| nor to the environment."                                                     |

|                                                                              |

| The Licensee has notified the NRC Resident Inspector.                        |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|General Information or Other                     |Event Number:   39723       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| REP ORG:  TEXAS DEPARTMENT OF HEALTH           |NOTIFICATION DATE: 04/03/2003|

|LICENSEE:  TEXAS DEPT OF TRANSPORTATION         |NOTIFICATION TIME: 12:21[EST]|

|    CITY:  ABILENE                  REGION:  4  |EVENT DATE:        03/31/2003|

|  COUNTY:                            STATE:  TX |EVENT TIME:        22:00[CST]|

|LICENSE#:  L00197                AGREEMENT:  Y  |LAST UPDATE DATE:  04/03/2003|

|  DOCKET:                                       |+----------------------------+

|                                                |PERSON          ORGANIZATION |

|                                                |ANTHONY GODY         R4      |

|                                                |                             |

+------------------------------------------------+                             |

| NRC NOTIFIED BY:  JAMES H. OGDEN, JR           |                             |

|  HQ OPS OFFICER:  ERIC THOMAS                  |                             |

+------------------------------------------------+                             |

|EMERGENCY CLASS:          NON EMERGENCY         |                             |

|10 CFR SECTION:                                 |                             |

|NAGR                     AGREEMENT STATE        |                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+------------------------------------------------------------------------------+



                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| ATTEMPTED THEFT OF A TROXLER GAUGE                                           |

|                                                                              |

| The Texas Department of Health reported the attempted theft of a Troxler     |

| Model 3430, (serial # unknown), on the night of 3/31/03 from a secure        |

| storage trailer at a Texas Department of Transportation construction site in |

| Abilene, TX.  Site personnel discovered the gauge in an open case on the     |

| floor of a construction trailer with its lock cut.  The trailer and its      |

| storage closet had been broken into.  The sealed source contains 8           |

| millicuries of Cs-137 and 40 millicuries of Am-241/Be.  Gauge is currently   |

| secured in a different area awaiting results of leak and serviceability      |

| tests.  An investigation is in process to determine whether other items were |

| stolen, or whether this gauge was the only target of the attempted theft.    |

|                                                                              |

| This event is technically not reportable, but was entered as an attempted    |

| theft due to three other similar incidents that did result in stolen gauges  |

| in the Dallas-Fort Worth area under similar circumstances.  The Texas        |

| Department of Transportation notified all other licensee's possessing        |

| portable nuclear gauges in the Abiline and Dallas-Fort Worth regions, along  |

| with local police and the Dallas FBI office.                                 |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   39729       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: GINNA                    REGION:  1  |NOTIFICATION DATE: 04/04/2003|

|    UNIT:  [1] [] []                 STATE:  NY |NOTIFICATION TIME: 09:43[EST]|

|   RXTYPE: [1] W-2-LP                           |EVENT DATE:        04/04/2003|

+------------------------------------------------+EVENT TIME:        07:16[EST]|

| NRC NOTIFIED BY:  MCLAUGHLIN                   |LAST UPDATE DATE:  04/08/2003|

|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          NON EMERGENCY         |RONALD BELLAMY       R1      |

|10 CFR SECTION:                                 |                             |

|ACOM 50.72(b)(3)(xiii)   LOSS COMM/ASMT/RESPONSE|                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|1     N          Y       100      Power Operation  |100      Power Operation  |

|                                                   |                          |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| LOSS OF MORE THAN 50% OF THE EMERGENCY SIRENS                                |

|                                                                              |

| The plant has 59 of the 96 offsite notification system sirens out of service |

| due to loss of power caused by ice storms damage to the electrical power     |

| supplies.   They do not know how soon the sirens will be returned to         |

| service.                                                                     |

|                                                                              |

| The NRC Resident Inspector and local government were notified and the state  |

| will be informed.                                                            |

|                                                                              |

| * * * UPDATE AT 1436 EDT ON 4/8/03 FROM DOUG PETERSON TO ERIC THOMAS * * *   |

|                                                                              |

| 82 of the 96 offsite notification system sirens are back in service.  13.5%  |

| of the sirens remain inoperable.                                             |

|                                                                              |

| The NRC Resident Inspector has been notified.                                |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   39741       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: CALVERT CLIFFS           REGION:  1  |NOTIFICATION DATE: 04/07/2003|

|    UNIT:  [] [2] []                 STATE:  MD |NOTIFICATION TIME: 22:36[EDT]|

|   RXTYPE: [1] CE,[2] CE                        |EVENT DATE:        04/07/2003|

+------------------------------------------------+EVENT TIME:        22:19[EDT]|

| NRC NOTIFIED BY:  DAVE LYNCH                   |LAST UPDATE DATE:  04/08/2003|

|  HQ OPS OFFICER:  ERIC THOMAS                  +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          UNUSUAL EVENT         |JAMES TRAPP          R1      |

|10 CFR SECTION:                                 |BRUCE BOGER          NRR     |

|AAEC 50.72(a) (1) (i)    EMERGENCY DECLARED     |RICHARD WESSMAN      IRO     |

|                                                |WILLIAM KANE         ET      |

|                                                |HUBERT MILLER        RA      |

|                                                |FEMA                         |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|                                                   |                          |

|2     N          N       0        Refueling        |0        Refueling        |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| UNUSUAL EVENT                                                                |

|                                                                              |

| At 2201, a fire started in the pressurizer doghouse.  Welding operations     |

| were ongoing in the upper part of the space, and a slag catchment device     |

| lower in the space caught fire.  The fire brigade responded to the scene.    |

| At 2219, the licensee declared an Unusual Event because of an ongoing fire   |

| in the vital area for greater than 15 minutes.  At 2234, the fire was put    |

| out by pouring water down onto the fire from above, and a reflash watch was  |

| set.  There was no damage noted to plant equipment, and no injuries to       |

| personnel.                                                                   |

|                                                                              |

| The licensee notified the NRC Resident Inspector and the surrounding         |

| counties.                                                                    |

|                                                                              |

| * * * UPDATE AT 2309 ON 4/7/03 FROM DAVE SEPANICH TO ERIC THOMAS * * *       |

|                                                                              |

| At 2300, the licensee secured from the Unusual Event.  There was no damage   |

| noted to plant components, and scaffolding will be erected to conduct        |

| further inspections.                                                         |

|                                                                              |

| The licensee notified the NRC Resident Inspector and the surrounding         |

| counties.                                                                    |

|                                                                              |

| * * * UPDATE AT 0008 ON 4/8/03 FROM MIKE KORSNICK TO ERIC THOMAS * * *       |

|                                                                              |

| The cause of the fire was slag from welding operations that fell through     |

| some fire blankets and ignited the herculite underneath.  A fire brigade     |

| member will be sent back into the space this morning to conduct further      |

| damage assessment.                                                           |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   39742       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: CALLAWAY                 REGION:  4  |NOTIFICATION DATE: 04/08/2003|

|    UNIT:  [1] [] []                 STATE:  MO |NOTIFICATION TIME: 15:10[EDT]|

|   RXTYPE: [1] W-4-LP                           |EVENT DATE:        04/07/2003|

+------------------------------------------------+EVENT TIME:        14:10[CDT]|

| NRC NOTIFIED BY:  JAMES CUNNINGHAM             |LAST UPDATE DATE:  04/08/2003|

|  HQ OPS OFFICER:  ERIC THOMAS                  +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          NON EMERGENCY         |DAVE LOVELESS        R4      |

|10 CFR SECTION:                                 |                             |

|NINF                     INFORMATION ONLY       |                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|1     N          Y       100      Power Operation  |100      Power Operation  |

|                                                   |                          |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| INFORMATION CALL                                                             |

|                                                                              |

| "Unfounded Suspicious Call concerning demonstrations at the Callaway Nuclear |

| Plant.                                                                       |

|                                                                              |

| "On 04/07/03 at approximately 1400 hours, the Assistant Superintendent of    |

| Security at the Callaway Plant received a call from Callaway County Sheriff. |

| The sheriff stated that on 04/04/03 at 2036 hours the county dispatcher      |

| received an anonymous call stating that a demonstration would take place at  |

| the Callaway Plant on Wednesday April 9, 2003. The caller did not offer any  |

| additional information even when questioned other than he would get hurt if  |

| he stated anything else.                                                     |

|                                                                              |

| "[Neither] Ameren Corporate Security, Callaway Plant Security, Callaway      |

| County Sheriff's Department nor [DELETED] with the FBI office in Jefferson   |

| City have received or come in contact with any information concerning any    |

| type of possible demonstration.                                              |

|                                                                              |

| "The Callaway Plant EDO, Protective Services Superintendent and Vice         |

| President were notified of this call. The Sheriff's Department plans on      |

| conducting extra patrols of the area on 04/09/03 as well as an increased     |

| awareness by Security."                                                      |

|                                                                              |

| Notified IAT (J. Davidson)                                                   |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   39743       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: DIABLO CANYON            REGION:  4  |NOTIFICATION DATE: 04/08/2003|

|    UNIT:  [] [2] []                 STATE:  CA |NOTIFICATION TIME: 19:36[EDT]|

|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        04/08/2003|

+------------------------------------------------+EVENT TIME:        14:53[PDT]|

| NRC NOTIFIED BY:  TONY CHITWOOD                |LAST UPDATE DATE:  04/08/2003|

|  HQ OPS OFFICER:  HOWIE CROUCH                 +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          NON EMERGENCY         |DAVE LOVELESS        R4      |

|10 CFR SECTION:                                 |                             |

|AESF 50.72(b)(3)(iv)(A)  VALID SPECIF SYS ACTUAT|                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|                                                   |                          |

|2     N          N       0        Cold Shutdown    |0        Cold Shutdown    |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

|  AUXILIARY FEEDWATER ACTUATION DUE TO LOW STEAM GENERATOR WATER LEVEL        |

|                                                                              |

| The following information was received from the Licensee via facsimile:      |

|                                                                              |

| "On April 8, 2003 with Unit 2 in Mode 5 (Cold Shutdown), the auxiliary       |

| feedwater (AFW) system automatically actuated on a valid signal when the     |

| solid state protection system (SSPS) was placed in service while the steam   |

| generator level was below the AFW actuation set point. The actuation was     |

| unplanned.                                                                   |

|                                                                              |

| "S/G [Steam Generator] 2-1 level had been lowered to below the feed ring for |

| work on an AFW system check valve. Operations was performing testing on the  |

| AFW system using AFW Pump 2-2, and was going to restore S/G level to normal  |

| (approximately 33% narrow range level) during the test. In conjunction with  |

| the AFW system testing, SSPS was being placed in service in preparation for  |

| an expected Mode 4 transition later in the watch after the AFW system        |

| testing was complete. When SSPS was placed in service, the low level in S/G  |

| 2-1 made up the coincidence for starting the motor driven AFW pumps. AFW     |

| Pump 2-2 was in operation, but AFW Pump 2-3 started in response to the low   |

| S/G level. AFW Pump 2-3 was aligned for recirculation flow, and did not feed |

| forward on the automatic start. Operations then restored S/G 2-1 level above |

| the low level trip point and secured AFW Pump 2-3.                           |

|                                                                              |

| "The start of AFW Pump 2-3 on a valid low level signal from S/G 2-1 is       |

| reportable as an 8  [hr.] non-emergency                                      |

| report."                                                                     |

|                                                                              |

| In addition to the AFW actuation, the Licensees did receive a S/G blowdown   |

| isolation signal but S/G blowdown was not in service at the time.            |

|                                                                              |

| The Licensee has informed the NRC Resident Inspector.                        |

+------------------------------------------------------------------------------+





                    

Page Last Reviewed/Updated Thursday, March 25, 2021