Event Notification Report for March 26, 2003
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 03/25/2003 - 03/26/2003 ** EVENT NUMBERS ** 39684 39685 39689 39696 39697 39698 39699 39700 39701 39702 +------------------------------------------------------------------------------+ |General Information or Other |Event Number: 39684 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: ILLINOIS DEPT OF NUCLEAR SAFETY |NOTIFICATION DATE: 03/20/2003| |LICENSEE: CONAM INSPECTION INC |NOTIFICATION TIME: 17:37[EST]| | CITY: GLENDALE HEIGHTS REGION: 3 |EVENT DATE: 03/20/2003| | COUNTY: STATE: IL |EVENT TIME: 16:37[CST]| |LICENSE#: IL-01225-22 AGREEMENT: Y |LAST UPDATE DATE: 03/20/2003| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |JAMES CREED R3 | | |LARRY CAMPER NMSS | +------------------------------------------------+BRUCE MALLETT R2 | | NRC NOTIFIED BY: JOE KLINGER |GARY SHEAR R3 | | HQ OPS OFFICER: ARLON COSTA |JOHN DAVIDSON TAS | +------------------------------------------------+DOE, EPA, USDA (FAX) | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |NAGR AGREEMENT STATE | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | MISSING RADIOGRAPHY CAMERA CONTAINING AN IRIDIUM-192 RADIOACTIVE SOURCE | | | | "A Department inspector in the W. Chicago Regional Office, took a call ago | | from the RSO of Conam Inspection Inc. (lL-01225-22) in Glendale Heights, | | IL. The RSO reported that a radiography camera [Model 660-B, S/N B2872] | | containing 86 Ci [Curies] of Ir-192 [Iridium-192], as of March 20, 2003, | | destined for the Sequoyah Power Plant in Soddy Daisy, Tennessee had failed | | to arrive as of the expected delivery date 3/17/2003. He further stated | | that the carrier has been contacted daily since 3/18/03 for information as | | to the package's whereabouts with no success. As of 1515 hrs. on 3/20/03, | | the carrier indicated to him that the package may have been misrouted and | | can only confirm the package leaving a sorting facility in Lisle, Illinois | | with potential stops in South Bend, Indiana and the carrier's hazmat center | | in Wilmington, Ohio. The RSO was advised that a thorough search was being | | conducted by the carrier's personnel. | | | | "The RSO is sensitive to the current security issues and wanted to ensure | | the situation was promptly reported and to indicate some extent of | | frustration with the carrier although he hoped that the carrier would indeed | | locate the package. The package is in a black AEA Technology [Model 424-9, | | Sealed Source] overpack box marked with S/N 853 and labeled as a 'Yellow | | II.' The RSO provided a copy of the shipping paper that included the | | specific information concerning the radiography camera, the package | | tracking number, and a contact number at the carrier. The department used | | this information and made direct contact with the carrier. Carrier | | confirmed the above information and is continuing their search. In fact, | | the carrier reported this event to the NRC Operations Center as did NRC | | Region II." | | | | | | * * * UPDATE ON 3/21/03 AT 1544 EST VIA EMAIL FROM JOE KLINGER TO ARLON | | COSTA * * * | | | | "A Department inspector in the W. Chicago Regional Office, took a call ago | | from the RSO of Conam Inspection Inc. (IL-01225-22) in Glendale Heights, | | IL. The RSO reported that a radiography camera containing 86 Ci of Ir-192, | | as of March 20, 2003, destined for the Sequoya Power Plant in Soddy Daisy, | | Tennessee, had failed to arrive as of the expected delivery date 3/17/2003. | | He further stated that the carrier has been contacted daily since 3/18/03 | | for information as to the package's whereabouts with no success. As of | | 1515 hrs. on 3/20/03, the carrier indicated to him that the package may | | have been misrouted and can only confirm the package leaving a sorting | | facility in Lisle, Illinois with potential stops in South Bend, Indiana and | | the carrier's hazmat center in Wilmington, Ohio. The RSO was advised that | | a thorough search was being conducted by the carrier's personnel. | | | | "The RSO is sensitive to the current security issues and wanted to ensure | | the situation was promptly reported and to indicate some extent of | | frustration with the carrier although he hoped that the carrier would indeed | | locate the package. The package is in a black AEA Technology overpack box | | marked with S/N 853 and labeled as a 'Yellow II'. The RSO has been asked for | | a copy of the shipping paper that includes the specific information of the | | radiography camera, the package tracking number, and a contact number at the | | carrier so that the Department may make direct inquiries with the company. | | | | "On 21 March departmental inspectors proceeded to the Lisle, Illinois | | Airborne Express distribution facility to survey the area to try and locate | | the device. At approximately 0930 on 21 March [DELETED], Conam, notified | | the department that the camera was located by Airborne Express at one of | | their facilities in Springdale, South Carolina. The camera will be | | transported to its original destination at Soddy Daisy, TN. Upon learning | | this information, the departmental inspectors immediately terminated their | | survey of the Lisle Airborne Express facility. The problem appeared to be a | | failure to follow the appropriate procedure by Airborne Express for their | | hazmat packages. The Airborne Express procedures are adequate and are | | routinely used effectively but for this package they made an error that | | resulted in the hazmat package being sent to their standard package | | processing facility in Atlanta and subsequently inadvertently sent to | | Springdale, SC. Airborne Express is reviewing possible actions to prevent | | recurrence. NRC was notified by phone and email that the camera had been | | located. The event was assigned event number 39684." | | | | Notified NMSS EO (Camper), R3DO (Creed), R2DO (Julian) and via fax DOE, EPA, | | USDA, HHS, FEMA and DHS. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |General Information or Other |Event Number: 39685 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: TEXAS DEPARTMENT OF HEALTH |NOTIFICATION DATE: 03/21/2003| |LICENSEE: LAW ENGINEERING & ENVIRONMENTAL SERVI|NOTIFICATION TIME: 11:58[EST]| | CITY: FORT WORTH REGION: 4 |EVENT DATE: 03/21/2003| | COUNTY: STATE: TX |EVENT TIME: 03:40[CST]| |LICENSE#: L05490-000 AGREEMENT: Y |LAST UPDATE DATE: 03/21/2003| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |CLAUDE JOHNSON R4 | | |LARRY CAMPER NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: JAMES H. OGDEN, JR. | | | HQ OPS OFFICER: ARLON COSTA | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |NAGR AGREEMENT STATE | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | AGREEMENT STATE REPORT: STOLEN TROXLER MOISTURE DENSITY GAUGE | | | | "Gauge operator was working the swing shift supporting operations of | | construction of the Dallas Area Rapid Transit (DART) in Dallas, Texas. | | Enroute to company office, he stopped by his residence from 3:00 a.m. to | | 3:40 a.m. for breakfast. Before departing for the storage location, 2200 | | Gravel Drive, Fort Worth, he noted that the gauge and chain were missing | | from his company [Law Engineering & Environmental Services, Inc.] truck | | (Black Ford, F-150). The stolen gauge is a Troxler 3411 B, Serial No. | | 10732, with two sealed sources: Cs-137, 8 millicuries, Serial No. 40-8208 | | and AM-241/Be, 40 millicuries, Serial No. 46-2134. A report of the theft | | was made to the White Settlement Police Department and to his supervisor, | | [DELETED]. The gauge, chain, and lock are completely missing from the | | vehicle. | | | | "Licensee notified White Settlement Police Department, and Texas Department | | of Health/Bureau of Radiation Control, TDH/BRC will notify NRC, INEEL, | | Troxler Electronic Labs, and the states of Arizona, Arkansas, Louisiana, New | | Mexico, and Oklahoma, as well as, the country of Mexico. | | | | "Media attention: None at this time. Licensee is debating notifications to | | local media and possibly offering a reward for return of the gauge." | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |General Information or Other |Event Number: 39689 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: ALABAMA RADIATION CONTROL |NOTIFICATION DATE: 03/22/2003| |LICENSEE: GALLET AND ASSOCIATES |NOTIFICATION TIME: 18:44[EST]| | CITY: HOMEWOOD REGION: 2 |EVENT DATE: 03/22/2003| | COUNTY: STATE: AL |EVENT TIME: 09:30[CST]| |LICENSE#: 991 AGREEMENT: Y |LAST UPDATE DATE: 03/22/2003| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |CAUDLE JULIAN R2 | | |LARRY CAMPER NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: JAMES L. MCNEES | | | HQ OPS OFFICER: ARLON COSTA | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |NAGR AGREEMENT STATE | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | AGREEMENT STATE REPORT: STOLEN MOISTURE DENSITY GAUGE | | | | "At 11:12 a.m. on Saturday March 22, 2003 James L. McNees of the Office of | | Radiation Control was contacted at his home by Mr. Tad Nelson of Gallet and | | Associates, (Alabama Radioactive Material License No. 991) and notified that | | at approximately 10:00 a.m. this morning that a Campbell Pacific model MC-3 | | moisture density gauge had been stolen from the back of a company pickup | | truck at an employee's home. Nelson stated that the Homewood (Alabama) | | Police Department was currently at the location investigating. The device | | contains approximately 10 mCi [millicuries] of Cs-137 and 40 mCi | | [millicuries] of Am-241. Nelson further stated that the shipping container | | housing the device was locked, as was the control mechanism on the device, | | and that the thief(s) reportedly obtained the device by cutting the chain by | | which the shipping container was locked to the bed of the truck. | | | | "Alabama Emergency Management Agency was notified at 11:28 a.m., who [in | | turn] alerted other civil authorities in the Jefferson County area. The | | principal concern being that once the thief discovers that the stolen device | | has little value at sale, and is hazardous, that it will be abandoned. | | | | "Mr. Nelson agreed that if the device was not recovered by this afternoon | | that a press release should be made. At 5:00 p.m. today, March 22, 2003, | | the writer was informed by Mr. Nelson that the device had not been | | recovered. Both agreed that Gallet and Associates should forward the | | attached press release to local Jefferson County media outlets. | | | | The Licensee, Gullet & Associates, issued the following Press Release on | | March 22, 2003: | | | | "Around or before 9:30 on March 22, 2003, a moisture-density gauge | | containing sealed sources of radioactive material was stolen from its case | | locked to a truck owned by Gallet & Associates, Inc. of Birmingham, Alabama. | | The truck was parked at a home in the Edgewood community of Homewood, | | Alabama near the Palisades Shopping Center. The Homewood Police Department | | was notified and is continuing their investigation. | | | | "The Attached is a sketch of the gauge stolen. Labels indicating the device | | is radioactive should be visible on the gauge itself. Normally the | | radioactive sealed source is locked in a safe position. The device does not | | pose a health hazard as long as it is not tampered with or handled by | | untrained individuals. Please notify the Homewood Police Department at | | (205) 877-8637, Gallet & Associates, Inc. at (205) 942-1289, the Alabama | | Division of Radiation Control at 1-800-582-1866, or your local police | | department if found. | | | | "Since the device and sale of such is regulated it therefore has no resale | | value and can only be used to determine the moisture content and density of | | soils by licensed, qualified personnel. | | | | "A reward is offered for the recovery or information leading to the recovery | | of the device." | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Fuel Cycle Facility |Event Number: 39696 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: PADUCAH GASEOUS DIFFUSION PLANT |NOTIFICATION DATE: 03/25/2003| | RXTYPE: URANIUM ENRICHMENT FACILITY |NOTIFICATION TIME: 01:15[EST]| | COMMENTS: 2 DEMOCRACY CENTER |EVENT DATE: 03/24/2003| | 6903 ROCKLEDGE DRIVE |EVENT TIME: 00:30[CST]| | BETHESDA, MD 20817 (301)564-3200 |LAST UPDATE DATE: 03/25/2003| | CITY: PADUCAH REGION: 3 +-----------------------------+ | COUNTY: McCRACKEN STATE: KY |PERSON ORGANIZATION | |LICENSE#: GDP-1 AGREEMENT: Y |MICHAEL PARKER R3 | | DOCKET: 0707001 |LARRY CAMPER NMSS | +------------------------------------------------+JOHN JOLICOEUR IRO | | NRC NOTIFIED BY: TOM WHITE | | | HQ OPS OFFICER: ERIC THOMAS | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |NBNL RESPONSE-BULLETIN | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | BULLETIN 91-01 24 HOUR REPORT FOR CRITICALITY CONTROL | | | | At 0030 on 3-24-03, the Plant Shift Superintendent (PSS) was notified that | | nine (9) pallets of process equipment containing less than a safe uranium | | mass and spaced 2 feet edge to edge were discovered in C-335. NCSA GEN-010 | | requires that the total uranium mass of an equipment group be independently | | verified and documented to be less than or equal to a safe mass based on the | | highest assay according to CP2-PO-FO1031. No documentation exists to support | | that the total uranium mass was verified or independently verified according | | to CP2-PO-FO1031 in violation of NCSA GEN-010. | | | | The NRC Senior Resident Inspector has been notified of this event. | | | | PGDP Assessment and Tracking Report No. ATR 03-0876; PGDP Event Report No. | | PAD-2003-006, NRC Event Worksheet [EN 39696]. | | | | Responsible Division: Operations | | | | SAFETY SIGNIFICANCE OF EVENTS: | | | | Although the total mass of the grouped items was not independently verified | | to be less than a safe mass, no single pallet contains greater than 35 | | pounds of uranium. The highest enrichment of any item was 2.0 wt. % 235U. | | The safe mass for uranium at 2.0 wt. % 235U is approximately 250 pounds. | | | | POTENTIAL CRITICALITY PATHWAYS INVOLVED (BRIEF SCENARIO(S) OF HOW | | CRITICALITY COULD OCCUR | | | | In order for a criticality to be possible, greater than a safe mass of | | uranium must be accumulated and then become moderated. | | | | CONTROLLED PARAMETERS MASS. MODERATION, GEOMETRY, CONCENTRATION, ETC | | | | Double contingency is maintained by implementation of two controls | | (verification and independent verification) of mass. | | | | ESTIMATED AMOUNT, ENRICHMENT, FORM OF LICENSED MATERIAL (INCLUDE PROCESS | | LIMIT AND % WORST CASE CRITICAL MASS); | | | | No single pallet has greater than 35 pounds of uranium and the highest assay | | of any Item is 2.0 wt. % 235U. The safe mass for this assay is 250 pounds. | | | | NUCLEAR CRITICALITY SAFETY CONTROL(S) OR CONTROL SYSTEM(S) AND DESCRIPTION | | OF THE FAILURES OR DEFICIENCIES | | | | The first leg of double contingency is based on mass. NCSA GEN-010 requires | | that the total uranium mass of grouped items be verified less than the UH | | [Uncomplicated Handling] mass limit and documented. No documentation exists | | that substantiates that this verification was performed; therefore, this | | control was violated. However, since none of the groups contain greater than | | a safe mass this parameter was not exceeded. | | | | The second leg of double contingency is based on mass. NCSA GEN-010 requires | | that the total uranium mass of grouped items be independently verified less | | than the UH mass limit and documented in accordance with CP2-PO-FO1031. No | | documentation exists that substantiates that this independent verification | | was performed; therefore, this control was violated. | | | | Even though the mass parameter was maintained, double contingency is based | | on two controls on mass. Since neither control was maintained, double | | contingency was not maintained. | | | | CORRECTIVE ACTIONS TO RESTORE SAFETY SYSTEMS AND WHEN EACH WAS IMPLEMENTED: | | | | 1. Properly group and document each pallet according to CP2-CO-CN2030. | | 2. Upon completion of corrective action 1 for each of the 9 pallets, the | | exclusion zone and postings may be removed. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39697 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: MCGUIRE REGION: 2 |NOTIFICATION DATE: 03/25/2003| | UNIT: [1] [2] [] STATE: NC |NOTIFICATION TIME: 12:41[EST]| | RXTYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 03/25/2003| +------------------------------------------------+EVENT TIME: [EST]| | NRC NOTIFIED BY: WADSWORTH |LAST UPDATE DATE: 03/25/2003| | HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |RUDOLPH BERNHARD R2 | |10 CFR SECTION: | | |DDDD 73.71(b)(1) SAFEGUARDS REPORTS | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | |2 N Y 100 Power Operation |100 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | DISCOVERY OF CRIMANAL ACT INVOLVING FALSIFICATION OF INFORMATION PERTAINING | | TO ACCESS SCREENING | | | | Compensatory measures taken by Licensee upon discovery. The NRC Resident | | Inspector was notified. | | | | Contact HOO for additional information. | | | | SEE EVENTS # 39698 AND 39700 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39698 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: CATAWBA REGION: 2 |NOTIFICATION DATE: 03/25/2003| | UNIT: [1] [2] [] STATE: SC |NOTIFICATION TIME: 12:57[EST]| | RXTYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 03/25/2003| +------------------------------------------------+EVENT TIME: 12:00[EST]| | NRC NOTIFIED BY: BRADLEY |LAST UPDATE DATE: 03/25/2003| | HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |RUDOLPH BERNHARD R2 | |10 CFR SECTION: | | |DDDD 73.71(b)(1) SAFEGUARDS REPORTS | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | |2 N N 0 Hot Standby |0 Hot Standby | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | DISCOVERY OF CRIMANAL ACT INVOLVING FALSIFICATION OF INFORMATION PERTAINING | | TO ACCESS SCREENING | | | | Compensatory measures taken by Licensee upon discovery. The NRC Resident | | Inspector will be notified. | | | | Contact HOO for additional information. | | | | SEE EVENTS # 39697 AND 39700 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39699 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: PALISADES REGION: 3 |NOTIFICATION DATE: 03/25/2003| | UNIT: [1] [] [] STATE: MI |NOTIFICATION TIME: 11:42[EST]| | RXTYPE: [1] CE |EVENT DATE: 03/25/2003| +------------------------------------------------+EVENT TIME: 11:21[EST]| | NRC NOTIFIED BY: KEN JOHNSON |LAST UPDATE DATE: 03/25/2003| | HQ OPS OFFICER: ERIC THOMAS +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: ALERT |MICHAEL PARKER R3 | |10 CFR SECTION: |BILL BATEMAN NRR | |AAEC 50.72(a) (1) (i) EMERGENCY DECLARED |JOHN JOLICOEUR IRO | |AESF 50.72(b)(3)(iv)(A) VALID SPECIF SYS ACTUAT|DAVE BARDEN FEMA | |AINB 50.72(b)(3)(v)(B) POT RHR INOP |BLAIR SPITZBERG R4 | |APRE 50.72(b)(2)(xi) OFFSITE NOTIFICATION |JAMES DYER RA | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N N 0 Refueling |0 Refueling | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | ALERT DECLARED DUE TO LOSS OF SHUTDOWN COOLING | | | | The reactor is shutdown for a refueling outage since 3/17/03. An alert | | declaration was made on 3/25/03 at 1121 EST due to loss of shutdown cooling. | | Time to boil is estimated to be less than fifty five (55) minutes. Plant | | status is degrading. There are no radioactivity releases in progress. The | | current wind direction is from 270 to 90 degrees. The wind speed is eight | | (8) miles per hour, class B stability with no precipitation. Mitigating | | responses by the Licensee are in progress. | | | | The U.S. NRC entered the Monitoring Phase of Normal Mode at 1159 at EST. | | | | *** UPDATE ON 3/25/03 AT 1233 EST FROM JONATHAN SEGUNDO TO HQ OPERATIONS | | CENTER*** | | | | The Alert condition was terminated and the Station entered an Unusual Event | | at 12:31 EST due to loss of offsite power. Shutdown cooling was restored at | | 11:41 EST. Plant systems are being powered by the Emergency Diesel | | Generators. Reactor Coolant System temperature is at 104 degrees | | Fahrenheit. There are no radioactivity releases in progress. | | | | *** UPDATE ON 3/25/03 AT 1824 EST FROM AMY HAZELHOFF TO ARLON COSTA*** | | | | "Nuclear Management Company is providing additional information related to | | event notification 39699, which was reported at 1121 [1142] EST on March 25, | | 2003. This information is provided for completeness of reportability | | requirements. The event reported earlier is also reportable under the | | following criteria: | | 10CFR50.72(b)(3)(iv)(A), due to actuation of the emergency diesel generators | | and | | 10CFR50.72(b)(3)(v)(B), due to loss of shutdown cooling. | | | | "Additionally, a press release has been issued. Therefore, a report is | | required per 10CFR50.72(b)(2)(xi) for notification to offsite agencies. | | Palisades remains in an Unusual Event until a qualified offsite circuit is | | supplying a vital bus. The plant is currently stable. The root cause [of | | this incident] is not yet known." | | | | Notifications of this update were made by the Licensee to the NRC Resident | | Inspector, the state, local and other government agencies, and a press | | release was issued on this incident. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39700 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: OCONEE REGION: 2 |NOTIFICATION DATE: 03/25/2003| | UNIT: [1] [2] [3] STATE: SC |NOTIFICATION TIME: 12:42[EST]| | RXTYPE: [1] B&W-L-LP,[2] B&W-L-LP,[3] B&W-L-L|EVENT DATE: 03/25/2003| +------------------------------------------------+EVENT TIME: 12:00[EST]| | NRC NOTIFIED BY: Daniel Durham |LAST UPDATE DATE: 03/25/2003| | HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |RUDOLPH BERNHARD R2 | |10 CFR SECTION: | | |DDDD 73.71(b)(1) SAFEGUARDS REPORTS | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | |2 N Y 100 Power Operation |100 Power Operation | |3 N Y 99 Power Operation |99 Power Operation | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | DISCOVERY OF CRIMINAL ACT INVOLVING FALSIFICATION OF INFORMATION PERTAINING | | TO ACCESS SCREENING | | | | Compensatory measures taken by Licensee upon discovery. The NRC Resident | | Inspector will be notified. | | | | Contact HOO for additional information. | | | | SEE EVENTS #39697 AND 39698. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39701 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: SUSQUEHANNA REGION: 1 |NOTIFICATION DATE: 03/26/2003| | UNIT: [1] [2] [] STATE: PA |NOTIFICATION TIME: 00:30[EST]| | RXTYPE: [1] GE-4,[2] GE-4 |EVENT DATE: 03/25/2003| +------------------------------------------------+EVENT TIME: 23:58[EST]| | NRC NOTIFIED BY: ROBERT BOESCH |LAST UPDATE DATE: 03/26/2003| | HQ OPS OFFICER: MIKE RIPLEY +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |PAMELA HENDERSON R1 | |10 CFR SECTION: | | |APRE 50.72(b)(2)(xi) OFFSITE NOTIFICATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | |2 N N 0 Refueling |0 Refueling | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | OFFSITE NOTIFICATION OF MEDICAL CONDITION | | | | "On 3/25/03 at 23:45 [EST] the Main Control Room was notified that an | | individual with a medical condition (believed to be a kidney stone) needed | | to be transported to the hospital by ambulance. An ambulance was dispatched | | to the site. The individual was not contaminated. The individual was | | transported to a local hospital for treatment. | | | | "The Pennsylvania Emergency Management Agency was notified at 23:58 [EST]. | | Due to notification to another government agency, this event is reportable | | under 10CFR50.72(b)(2)(xi)." | | | | The licensee notified the NRC Resident Inspector. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39702 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: BROWNS FERRY REGION: 2 |NOTIFICATION DATE: 03/26/2003| | UNIT: [] [2] [] STATE: AL |NOTIFICATION TIME: 06:04[EST]| | RXTYPE: [1] GE-4,[2] GE-4,[3] GE-4 |EVENT DATE: 03/26/2003| +------------------------------------------------+EVENT TIME: 02:45[CST]| | NRC NOTIFIED BY: JOE BENNET |LAST UPDATE DATE: 03/26/2003| | HQ OPS OFFICER: MIKE RIPLEY +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |RUDOLPH BERNHARD R2 | |10 CFR SECTION: | | |ASHU 50.72(b)(2)(i) PLANT S/D REQD BY TS | | |AESF 50.72(b)(3)(iv)(A) VALID SPECIF SYS ACTUAT| | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | |2 M/R Y 61 Power Operation |0 Hot Shutdown | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | SHUTDOWN REQUIRED BY TECHNICAL SPECIFICATIONS | | | | "On 3/26/03 at 02:45 [CST], Unit 2 experienced a trip of the 2B | | Recirculation system variable frequency drive (VFD). The 2A VFD had tripped | | earlier in the shift. This resulted in entry into Technical Specification | | 3.4.1 .B, which requires the plant to be placed in Mode 3 within 12 hours. | | The unit was manually scrammed at this time in accordance with plant | | procedures. | | | | "This event is reportable within 4 hours per 10CFR 50.72 (b)(2)(i) as 'The | | initiation of any nuclear plant shutdown required by the plant's Technical | | Specifications'. It is also reportable per 10CFR 50.72(b)(3)(iv)(A) and | | 10CFR 50.73(a)(2)(i)(A) and (iv)(B)." | | | | The cause of the Recirculation System VFD is being investigated. The | | licensee notified the NRC Resident Inspector. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021