Event Notification Report for February 14, 2003
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 02/13/2003 - 02/14/2003 ** EVENT NUMBERS ** 37298 39575 39584 +------------------------------------------------------------------------------+ |Other Nuclear Material |Event Number: 37298 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: SOUTHEAST MISSOURI STATE UNIVERSITY |NOTIFICATION DATE: 09/07/2000| |LICENSEE: SOUTHEAST MISSOURI STATE UNIVERSITY |NOTIFICATION TIME: 10:04[EDT]| | CITY: CAPE GIRARDEAU REGION: 3 |EVENT DATE: 06/12/2000| | COUNTY: CAPE GIRARDEAU STATE: MO |EVENT TIME: [CDT]| |LICENSE#: AGREEMENT: N |LAST UPDATE DATE: 02/13/2003| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |GARY SHEAR R3 | | |DON COOL NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: CHRIS McGOWAN | | | HQ OPS OFFICER: LEIGH TROCINE | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |BOV1 20.2202(a)(1) PERS OVEREXPOSURE/TEDE | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | POTENTIAL PERSONNEL OVEREXPOSURE OF A CONTRACT EMPLOYEE AT SOUTHEAST | | MISSOURI STATE UNIVERSITY IN CAPE GIRARDEAU | | | | HOO NOTE: Information regarding the same event was reported to the NRC | | Operations Center on 09/01/00 by Engelhardt & Associates. (Refer to event | | #37282.) | | | | The licensee was advised by the NRC Region 3 Office to followup on the | | report made by Engelhardt & Associates because the work was performed on the | | Southeast Missouri State University Campus. The licensee is making this | | notification because they want to document that they are aware of this issue | | and that they agree with the Engelhardt & Associates report. Another reason | | for the report is that there may be an issue of who the responsible party is | | at this point in time. | | | | As a result of an NRC visit in February, Southeast Missouri State University | | discovered that a spill had occurred in the basement of Magill Hall. | | Accordingly, Engelhardt & Associates was contracted to perform several tasks | | including cleanup of the spill. At the time, the spill was thought to be | | minor, and the licensee has since found out that the spill was quite major. | | In addition to cleanup of the spill, Engelhardt & Associates was contracted | | to help the licensee get ready for a waste haul and help prepare a new | | Radiation Plan. An Engelhardt & Associates representative arrived on | | 06/12/00, and he worked in (and out) the basement of Magill Hall for 5 | | days. | | | | On 09/01/00, the NRC Region 3 Office (Kevin Null) notified the licensee that | | the Engelhardt & Associates employee had received a dose of 9 REM CEDE. As | | a result, the licensee is in the process of trying to arrange followup | | testing for the Engelhardt & Associates employee. The licensee has also | | hired another firm (SAIC) to cleanup some areas of Magill Hall because of a | | secondary spill that occurred quite some time ago. SAIC representatives | | have been on campus for a 1-week period already and are expected to return | | to the campus on 09/18/00. SAIC will also be handling the licensee's dose | | assessment. | | | | Call the NRC operations officer for licensee contact information. | | | | * * * UPDATE ON 2/13/02 FROM WALT LILLY TO MIKE RIPLEY /HOWIE CROUCH * * * | | | | Final bioassays and lung counts from individuals exposed during the above | | incident indicate that another individual had an intake of Am-241. This | | individual received an estimated intake of 9.4 nanocuries with a final dose | | assigned of 76 REM CDE to bone surfaces and 4.2 REM CEDE. The individual | | is undergoing chelation therapy at this time. | +------------------------------------------------------------------------------+ +-----------------------------------------------------------------------------+ |General Information or Other |Event Number: 39575 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: MA RADIATION CONTROL PROGRAM |NOTIFICATION DATE: 02/10/2003| |LICENSEE: PERKINELMER LIFE SCIENCES |NOTIFICATION TIME: 14:29[EST]| | CITY: BOSTON REGION: 1 |EVENT DATE: 07/18/2002| | COUNTY: STATE: MA |EVENT TIME: [EST]| |LICENSE#: 00-3200 AGREEMENT: Y |LAST UPDATE DATE: 02/10/2003| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |GLENN MEYER R1 | | |DON COOL EO NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: CARPENITO | | | HQ OPS OFFICER: CHAUNCEY GOULD | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |NAGR AGREEMENT STATE | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | POTENTIALLY MISSING PHOSPHORUS-32 SHIPPING PACKAGES | | | | Single packages containing P-32 (~14 day half-life) were destined for four | | different out-of-state locations (in CA, KS, NY and TX). Intended shipping | | dates were July 18, August 5 and August 6, 2002. Carrier reported packages | | potentially missing within 2-3 days after intended shipping dates. The | | per-package activities ranged from 250 microcuries to 1 millicurie. All | | subject radioactive material contents are presently well past ten | | half-lives. After several months of shipper-carrier joint investigation, the | | cause(s) remain undetermined. Actions have been taken by shipper and carrier | | to prevent recurrence. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39584 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: DIABLO CANYON REGION: 4 |NOTIFICATION DATE: 02/13/2003| | UNIT: [] [2] [] STATE: CA |NOTIFICATION TIME: 19:45[EST]| | RXTYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 02/13/2003| +------------------------------------------------+EVENT TIME: 10:00[PST]| | NRC NOTIFIED BY: TONY CHITWOOD |LAST UPDATE DATE: 02/13/2003| | HQ OPS OFFICER: HOWIE CROUCH +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |CHARLES MARSCHALL R4 | |10 CFR SECTION: | | |ADEG 50.72(b)(3)(ii)(A) DEGRADED CONDITION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | |2 N N 0 Refueling |0 Refueling | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | SIGNIFICANT INSERVICE INSPECTION FINDINGS FOR UNIT 2 STEAM GENERATOR TUBES | | | | The following information was obtained from the Licensee via facsimile: | | | | "On February 13, 2003, during the Unit 2 eleventh refueling outage (2R11), | | eddy current data on SG [Steam Generator] 2-4 indicated that greater than | | one percent of the total tubes inspected were defective. Most of the | | pluggable indications are due to outside diameter stress corrosion cracking | | (ODSCC) at the tube support plate intersections. Eddy current examination | | of these tubes indicated that the ODSCC crack growth rate at the tube | | support plate exceeded the program predicted growth rates. Preliminary | | calculations indicated the TS 5.6.10.d.5 limit for probability of burst | | (POB) was exceeded. | | | | "An additional defective tube in SG 2-4 row 5 tube bend has been identified | | that will be subject to additional insitu testing. PG&E has expanded the SG | | inspection scope and identified a team to prepare a root cause | | determination. | | | | "An NRC teleconference in accordance with TS 5.6.10.d.5 was held on February | | 13, 2003, at 1000 PST, to provide initial notification of significant | | findings. Additional teleconferences have been scheduled to provide | | additional inservice inspection results as they become available. | | | | "The NRC Resident Inspector and an additional onsite Region IV inspector | | were part of the teleconference presentation cited above." | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021