Event Notification Report for February 10, 2003
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 02/07/2003 - 02/10/2003 ** EVENT NUMBERS ** 39573 39574 +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39573 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: BEAVER VALLEY REGION: 1 |NOTIFICATION DATE: 02/07/2003| | UNIT: [1] [] [] STATE: PA |NOTIFICATION TIME: 15:54[EST]| | RXTYPE: [1] W-3-LP,[2] W-3-LP |EVENT DATE: 02/07/2003| +------------------------------------------------+EVENT TIME: 14:08[EST]| | NRC NOTIFIED BY: ROBERT G. HADDOCK |LAST UPDATE DATE: 02/07/2003| | HQ OPS OFFICER: STEVE SANDIN +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |JAMES NOGGLE R1 | |10 CFR SECTION: | | |AUNA 50.72(b)(3)(ii)(B) UNANALYZED CONDITION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | UNANALYZED CONDITION RELATED TO A POTENTIAL DISCHARGE OF THE C02 FIRE | | SUPPRESSION SYSTEM | | | | "On 2/7/2003 at 1408 hours, the Beaver Valley Power Station control room was | | notified by Engineering that a potential pressure transient from a discharge | | of the C02 total flooding fire suppression system in the East and West Cable | | Vaults at Beaver Valley Unit 1 (BV-1) could result in an unanalyzed | | condition. This pressure transient could cause the fire barriers within the | | subject areas to be structurally challenged, resulting in the potential for | | a postulated fire in one fire area to spread to an adjacent fire area. This | | condition could invalidate the assumptions made in the BV-1 fire protection | | safe shutdown analysis per 10 CFR 50 Appendix R. This condition was | | discovered following engineering's evaluation of a Condition Report | | initiated on 2/5/03 concerning the potential for a C02 discharge in the | | above areas that could have resulted in a breach of the fire barriers | | between adjacent fire areas. The automatic C02 suppression system in the | | East and West Cable Vaults was defeated on 2/5/03 at 2150 hours in response | | to the initial identified concern and a fire watch was established in the | | affected areas. These compensatory measures eliminate the potential for C02 | | overpressure transient condition in the affected areas. | | | | "This condition is being reported pursuant to 10 CFR 50.72(b)(3)(ii) as an | | unanalyzed condition that significantly degrades plant safety since a | | potential discharge of the C02 fire suppression system in response to a | | postulated fire could have invalidated the assumptions made in the BV-1 fire | | protection safe shutdown analysis per 10 CFR 50 Appendix R. The NRC resident | | has been notified of the degraded condition." | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Other Nuclear Material |Event Number: 39574 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: INDIANA DEPARTMENT OF TRANSPORTATIO |NOTIFICATION DATE: 02/09/2003| |LICENSEE: INDIANA DEPARTMENT OF TRANSPORTATION |NOTIFICATION TIME: 07:10[EST]| | CITY: INDIANAPOLIS REGION: 3 |EVENT DATE: 02/09/2003| | COUNTY: STATE: IN |EVENT TIME: 04:20[EST]| |LICENSE#: 13-26341-01 AGREEMENT: N |LAST UPDATE DATE: 02/09/2003| | DOCKET: 03032463 |+----------------------------+ | |PERSON ORGANIZATION | | |KENNETH RIEMER R3 | | |MELVYN LEACH NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: TOM JOHN | | | HQ OPS OFFICER: RICH LAURA | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |NINF INFORMATION ONLY | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | DAMAGED TROXLER GAUGE AT CONSTRUCTION SITE | | | | The RSO from the Indiana Department of Transportation reported a damaged | | Troxler gauge at a new construction site located approximately 1 mile west | | of the Indianapolis Airport. A bulldozer drove over the Troxler gauge. The | | gauge belongs to the State of Indiana. The gauge was a model number 3440 and | | had the serial number 19699. The gauge contained approximately 8 | | millicuries Cs-137 and 40 millicuries of Am-241/Be. The operating rod | | handle on the top of the gauge was bent over such that the plate on the | | bottom was stuck open. The RSO performed a radiological survey. The gauge | | casing was intact and no leakage was found. No personnel contaminations or | | radiation overexposures were observed. The RSO roped off the area. The RSO | | planned to transport the gauge back to the facilities shielded room. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021