The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for January 14, 2003




                    U.S. Nuclear Regulatory Commission

                              Operations Center



                              Event Reports For

                           01/13/2003 - 01/14/2003



                              ** EVENT NUMBERS **



39505  39506  39507  



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   39505       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: HOPE CREEK               REGION:  1  |NOTIFICATION DATE: 01/13/2003|

|    UNIT:  [1] [] []                 STATE:  NJ |NOTIFICATION TIME: 02:48[EST]|

|   RXTYPE: [1] GE-4                             |EVENT DATE:        01/12/2003|

+------------------------------------------------+EVENT TIME:        23:04[EST]|

| NRC NOTIFIED BY:  RITA BRADDICK                |LAST UPDATE DATE:  01/13/2003|

|  HQ OPS OFFICER:  MIKE RIPLEY                  +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          NON EMERGENCY         |RICHARD CONTE        R1      |

|10 CFR SECTION:                                 |                             |

|AIND 50.72(b)(3)(v)(D)   ACCIDENT MITIGATION    |                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|1     N          Y       100      Power Operation  |100      Power Operation  |

|                                                   |                          |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| OPEN  DUCTWORK ACCESS PANEL PREVENTED MAINTAINING CONTROL ROOM POSITIVE      |

| PRESSURE                                                                     |

|                                                                              |

| "On January 12, 2003 at 2304, control room pressure was observed to be       |

| negative. At the time the "A" Control Room Emergency Filtration (CREF)       |

| system was tagged out for scheduled maintenance. The event was initiated     |

| when technicians opened an access panel on the "A" CREF control room air     |

| supply duct within the control room boundary to repair a gasket. This        |

| resulted in both "A" and "B" trains of CREF unable to perform its design     |

| safety function: specifically, maintaining the control room at a 1/8 inch    |

| water gauge positive pressure relative to adjacent areas. Without assurance  |

| of CREF system providing positive pressure in the control room, mitigating   |

| the consequences of an accident could have been prevented. Upon discovering  |

| the cause, technicians were ordered to close the access panel. Control room  |

| pressure promptly returned to a normal, positive value. Total time at        |

| negative pressure was ten minutes. No unexpected response was experienced.   |

| In addition to the "A" CREF train, the "A" Hydrogen/Oxygen analyzer was      |

| inoperable at the time of the event."                                        |

|                                                                              |

| The licensee has notified the NRC resident inspector.                        |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   39506       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: INDIAN POINT             REGION:  1  |NOTIFICATION DATE: 01/13/2003|

|    UNIT:  [] [3] []                 STATE:  NY |NOTIFICATION TIME: 08:47[EST]|

|   RXTYPE: [2] W-4-LP,[3] W-4-LP                |EVENT DATE:        01/13/2003|

+------------------------------------------------+EVENT TIME:        06:18[EST]|

| NRC NOTIFIED BY:  ANDREW BARTLIK               |LAST UPDATE DATE:  01/13/2003|

|  HQ OPS OFFICER:  MIKE RIPLEY                  +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          NON EMERGENCY         |RICHARD BARKLEY      R1      |

|10 CFR SECTION:                                 |JOHN HANNON          NRR     |

|ARPS 50.72(b)(2)(iv)(B)  RPS ACTUATION - CRITICA|                             |

|AESF 50.72(b)(3)(iv)(A)  VALID SPECIF SYS ACTUAT|                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|                                                   |                          |

|3     M/R        Y       100      Power Operation  |0        Hot Standby      |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| MANUAL REACTOR TRIP DUE TO LOSS OF CONDENSER CIRCULATING WATER PUMP          |

|                                                                              |

| At 0618 EST the #35 Circulating Water Pump tripped.  The other circulating   |

| water pump supplying the same condenser section was out of service for       |

| maintenance.  The resulting loss of all circulating water to one condenser   |

| section produced a high differential pressure between sections. The reactor  |

| was manually tripped in accordance with plant procedures.  All controlled    |

| rods fully inserted. The Auxiliary Feedwater Pump automatically started as   |

| expected.  During the transient, the #32 Reactor Coolant Pump tripped due to |

| an unknown cause and is being investigated.  Additionally, the # R14 Plant   |

| Vent Gas radiation monitor went into alarm and then immediately returned to  |

| normal, however the redundant monitor did not show any increase in           |

| radiation.  Additionally, the #32 Source Range Detector did not come on      |

| scale on the reactor trip, however the redundant detector functioned         |

| normally.  The electrical system responded normally.  There were no releases |

| associated with this event.  The cause of the circulating water pump trip is |

| under investigation.                                                         |

|                                                                              |

| The licensee has notified the NRC resident inspector.                        |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   39507       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: SURRY                    REGION:  2  |NOTIFICATION DATE: 01/14/2003|

|    UNIT:  [1] [] []                 STATE:  VA |NOTIFICATION TIME: 04:18[EST]|

|   RXTYPE: [1] W-3-LP,[2] W-3-LP                |EVENT DATE:        01/14/2003|

+------------------------------------------------+EVENT TIME:        01:37[EST]|

| NRC NOTIFIED BY:  ALISON MACKELLAR             |LAST UPDATE DATE:  01/14/2003|

|  HQ OPS OFFICER:  MIKE RIPLEY                  +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          NON EMERGENCY         |ROBERT HAAG          R2      |

|10 CFR SECTION:                                 |                             |

|ARPS 50.72(b)(2)(iv)(B)  RPS ACTUATION - CRITICA|                             |

|AESF 50.72(b)(3)(iv)(A)  VALID SPECIF SYS ACTUAT|                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|1     M/R        Y       100      Power Operation  |0        Hot Shutdown     |

|                                                   |                          |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| MANUAL REACTOR TRIP DUE TO HIGH REACTOR COOLANT PUMP SHAFT VIBRATION         |

|                                                                              |

| "At 0137 hours, with Surry Power Station Unit 1 at 100% reactor power, a     |

| manual reactor trip was initiated due to elevated shaft vibrations (alert    |

| and danger) on "C" Reactor Coolant Pump.                                     |

|                                                                              |

| IRPI indication for one control rod indicated 25 steps following the trip.   |

| Borated as necessary to ensure adequate shutdown margin. All other control   |

| rods fully inserted into the core as designed.  The IRPI indication for this |

| rod is trending down at this time. The shutdown margin for Unit 1 was        |

| determined to be satisfactory.  Auxiliary feedwater automatically initiated  |

| as designed on low low steam generator level following the trip.  Primary    |

| RCS temperature decreased to approximately 541 degrees following the reactor |

| trip and was stabilized at 547 degrees.                                      |

|                                                                              |

| "No primary safety or power operated relief valves were actuated during the  |

| event. As a result of the loss of turbine load, the secondary power operated |

| relief valves actuated during the transient. No indication of primary to     |

| secondary leakage exists, therefore no adverse radiological consequences     |

| resulted from this event.                                                    |

|                                                                              |

| "All electrical busses transferred properly following the trip.  #1 EDG was  |

| T/O [tagged out] prior to unit trip.  All other emergency diesel generators  |

| are operable.  There were no radiation releases due to this event, nor were  |

| there any personnel injuries or contamination events.  The cause of the      |

| event is being investigated.                                                 |

|                                                                              |

| "Unit 1 is currently at Hot Shutdown with RCS temperature being maintained   |

| at approximately 547 degrees.  Unit 2 was not affected by this event and     |

| remains stable at 100% power operations.  This event Is being reported In    |

| accordance with 10CFR50.72(b)(2)(iv) and I0CFR50.72(b)(3)(iv)."              |

|                                                                              |

| The licensee notified the NRC resident inspector.                            |

+------------------------------------------------------------------------------+

                  