The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for January 6, 2003






                    U.S. Nuclear Regulatory Commission

                              Operations Center



                              Event Reports For

                           01/03/2003 - 01/06/2003



                              ** EVENT NUMBERS **



39481  39487  39488  



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   39481       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: PALO VERDE               REGION:  4  |NOTIFICATION DATE: 12/31/2002|

|    UNIT:  [] [2] []                 STATE:  AZ |NOTIFICATION TIME: 11:15[EST]|

|   RXTYPE: [1] CE,[2] CE,[3] CE                 |EVENT DATE:        12/26/2002|

+------------------------------------------------+EVENT TIME:        05:18[MST]|

| NRC NOTIFIED BY:  DAN MARKS                    |LAST UPDATE DATE:  01/03/2003|

|  HQ OPS OFFICER:  RICH LAURA                   +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          NON EMERGENCY         |WILLIAM JOHNSON      R4      |

|10 CFR SECTION:                                 |                             |

|APRE 50.72(b)(2)(xi)     OFFSITE NOTIFICATION   |                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|                                                   |                          |

|2     N          Y       99       Power Operation  |99       Power Operation  |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| PALO VERDE 2 OFFSITE NOTIFICATION ON COOLING TOWER WATER SPILL               |

|                                                                              |

| "The following event description is based on information currently           |

| available. If through subsequent reviews of this event, additional           |

| information is identified that is pertinent to this event or alters the      |

| information being provided at this time, a follow-up notification will be    |

| made via the ENS or under the reporting requirements of 10CFR50.73.          |

|                                                                              |

| "On Tuesday, December 31, 2002, the Palo Verde Nuclear Generating Station    |

| Unit 2 will provide a voluntary written report to the Arizona Department of  |

| Environmental Quality (ADEQ) of an event related to the protection of the    |

| environment. Specifically, the report will detail an unintentional release   |

| of an estimated 72,000 gallons of cooling tower water to the unlined ditch   |

| that carries storm water from the gunite lined storm water collection system |

| to Sedimentation Basin #1. The release began at approximately 05:18 Mountain |

| Standard Time (MST) on December 26, 2002 and was stopped at approximately    |

| 05:50 MST on December 28, 2002 following discovery. No news release is       |

| anticipated."                                                                |

|                                                                              |

| The NRC Resident Inspector was notified.                                     |

|                                                                              |

| ***UPDATE 01/03/03 1551 EST DAN MARKS TO JASON FLEMMING***                   |

|                                                                              |

| "It has been brought to Palo Verde's attention that this ENS event report    |

| 39481 has been posted on the NRC website with an error.  The release stopped |

| at approximately 05:50 MST on December 26, 2002.  The webpage incorrectly    |

| states December 28, 2002."                                                   |

|                                                                              |

| The NRC resident inspector has been notified.                                |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   39487       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: WOLF CREEK               REGION:  4  |NOTIFICATION DATE: 01/03/2003|

|    UNIT:  [1] [] []                 STATE:  KS |NOTIFICATION TIME: 15:14[EST]|

|   RXTYPE: [1] W-4-LP                           |EVENT DATE:        01/03/2003|

+------------------------------------------------+EVENT TIME:        11:01[CST]|

| NRC NOTIFIED BY:  STEVE HENRY                  |LAST UPDATE DATE:  01/03/2003|

|  HQ OPS OFFICER:  JASON FLEMMING               +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          NON EMERGENCY         |WILLIAM JOHNSON      R4      |

|10 CFR SECTION:                                 |                             |

|ARPS 50.72(b)(2)(iv)(B)  RPS ACTUATION - CRITICA|                             |

|AESF 50.72(b)(3)(iv)(A)  VALID SPECIF SYS ACTUAT|                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|1     A/R        Y       100      Power Operation  |0        Hot Standby      |

|                                                   |                          |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| AUTOMATIC REACTOR TRIP DUE TO POWER RANGE NEUTRON FLUX - HIGH NEGATIVE RATE  |

| TRIP                                                                         |

|                                                                              |

| "On January 3, 2003, Wolf Creek Generating Station Unit 1 was operating at   |

| 100% reactor power when an automatic reactor trip occurred at 11:01 a.m.     |

| CST. Scheduled preventative maintenance had been completed on the control    |

| rod drive motor generator set, and the system was being placed back into     |

| service when an automatic reactor trip was received due to a Power Range     |

| Neutron Flux - High Negative Rate trip on all four power range channels.     |

|                                                                              |

| "An Auxiliary Feedwater Actuation Signal was received and initiated the      |

| Auxiliary Feedwater System as expected. Plant equipment performed as         |

| expected.                                                                    |

|                                                                              |

| "Investigation into the cause of the reactor trip is in progress. The plant  |

| is currently in MODE 3, Hot Standby. This event is being reported in         |

| accordance with 10 CFR 50.72(b)(2)(iv)(B) and 10 CFR 50.72(b)(3)(iv)(A)."    |

|                                                                              |

| The Licensee has notified the NRC Resident inspector.                        |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   39488       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: QUAD CITIES              REGION:  3  |NOTIFICATION DATE: 01/04/2003|

|    UNIT:  [] [2] []                 STATE:  IL |NOTIFICATION TIME: 07:47[EST]|

|   RXTYPE: [1] GE-3,[2] GE-3                    |EVENT DATE:        01/04/2003|

+------------------------------------------------+EVENT TIME:        01:13[CST]|

| NRC NOTIFIED BY:  JOHN LECHMAIER               |LAST UPDATE DATE:  01/04/2003|

|  HQ OPS OFFICER:  HOWIE CROUCH                 +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          NON EMERGENCY         |ROGER LANKSBURY      R3      |

|10 CFR SECTION:                                 |                             |

|AIND 50.72(b)(3)(v)(D)   ACCIDENT MITIGATION    |                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|                                                   |                          |

|2     N          Y       100      Power Operation  |100      Power Operation  |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| LOW PRESSURE COOLANT INJECTION DECLARED INOPERABLE                           |

|                                                                              |

| "At 0113 hours CST on 1/4/2003, SR 3.5.1.1 [Surveillance Requirement]        |

| (monthly fill and vent surveillance) was initiated on U-2 B RHR loop.  When  |

| the high point vents were opened, no flow was observed within the            |

| established venting criteria required by the surveillance.  Based on this,   |

| neither LPCI [Low Pressure Coolant Injection] subsystem could be ensured     |

| filled to the injection valves.  Both LPCI subsystems were declared          |

| inoperable and TS 3.5.1 [Technical Specification] Condition D [was] entered. |

| At 0204 hours CST, when full flow was observed from the 2B RHR loop, TS      |

| 3.5.1 Condition D was exited.  At 0210 hours CST, 2A RHR loop was            |

| subsequently vented and full flow was observed immediately.                  |

|                                                                              |

| "This notification is being made in accordance with                          |

| 10CFR50.72(b)(3)(v)[(D)]."                                                   |

|                                                                              |

| Licensee has informed the NRC Resident Inspector.                            |

+------------------------------------------------------------------------------+