The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for December 03, 2002



                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           12/02/2002 - 12/03/2002

                              ** EVENT NUMBERS **

39408  39409  39413  39414  39416  39418  

+------------------------------------------------------------------------------+
|General Information or Other                     |Event Number:   39408       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  COLORADO DEPT OF HEALTH              |NOTIFICATION DATE: 11/27/2002|
|LICENSEE:  SOILS AND MATERIAL CONSULTANTS       |NOTIFICATION TIME: 11:25[EST]|
|    CITY:  ARVADA                   REGION:  4  |EVENT DATE:        11/25/2002|
|  COUNTY:                            STATE:  CO |EVENT TIME:        12:00[MST]|
|LICENSE#:  595-01                AGREEMENT:  Y  |LAST UPDATE DATE:  11/27/2002|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |LINDA HOWELL         R4      |
|                                                |THOMAS ESSIG         NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  PENTECOST                    |                             |
|  HQ OPS OFFICER:  CHAUNCEY GOULD               |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|NAGR                     AGREEMENT STATE        |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| STATE LICENSEE REPORTED A STOLEN MOISTURE DENSITY GAUGE                      |
|                                                                              |
| Soils and Material Consultants reported to the state that a CPN model MC1DR  |
| (serial # MD 80804445) moisture density gauge was stolen from a truck with a |
| locked camper shell while parked on a Wal Mart parking lot in Brighton, Co.  |
| The gauge was not chained or locked to the truck bed.  It contained 10       |
| millicuries of Cs-137 and 50 millicuries of Am-241:Be.  Local law            |
| enforcement was notified.  No media inquiry or reward has been made at this  |
| time.                                                                        |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|General Information or Other                     |Event Number:   39409       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  NEW YORK CITY BUREAU OF RAD HEALTH   |NOTIFICATION DATE: 11/27/2002|
|LICENSEE:  MATERIALS TESTING LAB, INC           |NOTIFICATION TIME: 15:31[EST]|
|    CITY:  NEW HYDE PARK            REGION:  1  |EVENT DATE:        11/22/2002|
|  COUNTY:                            STATE:  NY |EVENT TIME:             [EST]|
|LICENSE#:  2274-3075             AGREEMENT:  Y  |LAST UPDATE DATE:  11/27/2002|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |JOHN ROGGE           R1      |
|                                                |THOMAS ESSIG         NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  GENE MISKIN                  |                             |
|  HQ OPS OFFICER:  STEVE SANDIN                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|NAGR                     AGREEMENT STATE        |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| AGREEMENT STATE REPORT INVOLVING A STOLEN/RECOVERED TROXLER GAUGE            |
|                                                                              |
| A Troxler Model 3440, S/N 26331, containing 8 millicuries Cs-137 and 40      |
| millicuries Am-241:Be, was recovered from an abandoned stolen vehicle in     |
| Queens, NY at approximately 1300 EST on 11/27/02 after a police cruiser's    |
| radiological pager alerted.  The vehicle was stolen from a location on 120th |
| Street between 20th and 21st Ave in Queens and reported to the NY City       |
| Police Department on 11/22/02.  The NY City Health Department Bureau of Rad  |
| Health is storing the gauge in their lab currently and will return it to the |
| licensee after confirming proper ownership.  The gauge was found intact with |
| normal radiation readings.                                                   |
|                                                                              |
| Materials Testing Lab, Inc. is a NY State DOL licensee.                      |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39413       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: COOPER                   REGION:  4  |NOTIFICATION DATE: 12/02/2002|
|    UNIT:  [1] [] []                 STATE:  NE |NOTIFICATION TIME: 00:31[EST]|
|   RXTYPE: [1] GE-4                             |EVENT DATE:        12/01/2002|
+------------------------------------------------+EVENT TIME:        17:33[CST]|
| NRC NOTIFIED BY:  STEVE WHEELER                |LAST UPDATE DATE:  12/02/2002|
|  HQ OPS OFFICER:  MIKE NORRIS                  +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |LINDA HOWELL         R4      |
|10 CFR SECTION:                                 |                             |
|AIND 50.72(b)(3)(v)(D)   ACCIDENT MITIGATION    |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| STATION STARTUP AND EMERGENCY STATION SERVICE TRANSFORMERS DECLARED          |
| INOPERABLE                                                                   |
|                                                                              |
| "Available plant indicators showed that main generator output exceeded 150   |
| MVARs [million volt-amperes reactive] for approximately 4 minutes due to     |
| local grid conditions at 17:33 hours on December 1, 2002. The maximum value  |
| noted was 155 MVARs. Recent analysis and procedural guidance requires the    |
| two offsite power sources, consisting of the Station Startup Service         |
| Transformer and the Emergency Station Service Transformer to be declared     |
| inoperable above 150 MVARs. The grid operator was contacted and action was   |
| taken to lower local MVARs to below the allowed limit. The offsite power     |
| sources were declared operable at 17:37 hours."                              |
|                                                                              |
| The Licensee has notified the NRC Resident inspector.                        |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39414       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PALISADES                REGION:  3  |NOTIFICATION DATE: 12/02/2002|
|    UNIT:  [1] [] []                 STATE:  MI |NOTIFICATION TIME: 01:43[EST]|
|   RXTYPE: [1] CE                               |EVENT DATE:        12/01/2002|
+------------------------------------------------+EVENT TIME:        21:54[EST]|
| NRC NOTIFIED BY:  RICHARD GERLING              |LAST UPDATE DATE:  12/02/2002|
|  HQ OPS OFFICER:  MIKE NORRIS                  +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |JAMES CREED          R3      |
|10 CFR SECTION:                                 |JAMES LYONS          NRR     |
|ARPS 50.72(b)(2)(iv)(B)  RPS ACTUATION - CRITICA|                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     A/R        Y       100      Power Operation  |0        Hot Standby      |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| AUTOMATIC REACTOR TRIP ON LOSS OF MAIN GENERATOR LOAD                        |
|                                                                              |
| "At 2154 hours on December 1, 2002, an automatic reactor trip occurred on    |
| loss of main generator load. The loss of load trip occurred when the main    |
| generator tripped due to a fault in the plant switchyard. The switchyard     |
| fault was caused when the ground wire on the 345 KV transmission tower which |
| is immediately adjacent to the plant switchyard fell and came in contact     |
| with switchyard 'R' bus. When the main generator tripped, and with the       |
| switchyard 'R' bus de-energized as a result of the fault, the cooling tower  |
| pumps, condensate pumps, and primary coolant pumps lost power. The steam     |
| driven main feedwater pumps tripped due to loss of suction pressure when the |
| condensate pumps tripped. The reactor trip occurred as expected with all     |
| full-length control rods fully inserted. With the loss of the main feedwater |
| pumps the auxiliary feedwater system actuated as expected and is currently   |
| providing core heat removal. The plant is currently stable in Mode 3 on      |
| natural circulation.                                                         |
|                                                                              |
| "Palisades Switchyard Configuration                                          |
|                                                                              |
| "The Palisades switchyard is comprised of two 345 KV busses, the 'F' (Front) |
| and 'R' (Rear) busses. The plant's Safeguards transformer is fed from the    |
| 'F' bus. The plant's vital AC busses are normally aligned to the Safeguards  |
| transformer and remained powered throughout the event. The plant's Startup   |
| transformer is fed from the 'R' bus. The plant's non-vital AC busses would   |
| normally transfer to the Startup transformer on a reactor trip. However,     |
| with the 'R' bus deenergized the Startup transformer was not available and   |
| therefore power was lost to the cooling tower pumps, condensate pumps, and   |
| primary coolant pumps.                                                       |
|                                                                              |
| "Core Heat Removal                                                           |
|                                                                              |
| "Core heat removal is being provided by the auxiliary feedwater system with  |
| steaming to atmosphere via the atmospheric steam dump valves. The auxiliary  |
| feedwater system is comprised of three, full capacity, auxiliary feedwater   |
| pumps (two motor driven pumps and one steam driven pump). The motor driven   |
| pumps are powered from the plant's vital AC busses. All three auxiliary      |
| feedwater pumps are operable and one pump is in service providing core heat  |
| removal.                                                                     |
|                                                                              |
| "Extra precautions have been taken to ensure the operability of the          |
| auxiliary feedwater pumps and their power supplies, including the vital AC   |
| busses, their associated diesel generators, and the offsite circuit from the |
| Safeguards transformer.                                                      |
|                                                                              |
| "Plant Technical Specifications                                              |
|                                                                              |
| "The following three Technical Specification LCO Conditions apply as a       |
| result of the loss of the switchyard 'R' bus:                                |
|                                                                              |
| "Condition 3.8.1A, One offsite circuit inoperable.                           |
| "Condition 3.4.5A, One required PCS loop inoperable.                         |
| "Condition 3.4.5C, No PCS loop OPERABLE."                                    |
|                                                                              |
| The Licensee reports that there is no primary to secondary leakage in the    |
| steam generators.                                                            |
|                                                                              |
| The Licensee has notified the NRC Resident Inspector.                        |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   39416       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PADUCAH GASEOUS DIFFUSION PLANT      |NOTIFICATION DATE: 12/02/2002|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 17:32[EST]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        12/02/2002|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        14:15[CST]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  12/02/2002|
|    CITY:  PADUCAH                  REGION:  3  +-----------------------------+
|  COUNTY:  McCRACKEN                 STATE:  KY |PERSON          ORGANIZATION |
|LICENSE#:  GDP-1                 AGREEMENT:  Y  |KENNETH RIEMER       R3      |
|  DOCKET:  0707001                              |THOMAS ESSIG         NMSS    |
+------------------------------------------------+TIM MCGINTY          IRO     |
| NRC NOTIFIED BY:  KEVIN BEASLEY                |                             |
|  HQ OPS OFFICER:  ARLON COSTA                  |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|NONR                     OTHER UNSPEC REQMNT    |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| OFFSITE NOTIFICATION TO THE DOE CONCERNING ACCIDENTAL DISCHARGE OF WEAPON ON |
| SITE                                                                         |
|                                                                              |
| Misfired security weapon.  No one was hurt during this incident and          |
| compensatory measures were taken as appropriate. The Licensee notified the   |
| DOE and is in the process of filing a report and indicated that there may be |
| a press release on this incident.                                            |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39418       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: NINE MILE POINT          REGION:  1  |NOTIFICATION DATE: 12/02/2002|
|    UNIT:  [1] [] []                 STATE:  NY |NOTIFICATION TIME: 19:48[EST]|
|   RXTYPE: [1] GE-2,[2] GE-5                    |EVENT DATE:        12/02/2002|
+------------------------------------------------+EVENT TIME:        17:46[EST]|
| NRC NOTIFIED BY:  DON SHEEHAN                  |LAST UPDATE DATE:  12/02/2002|
|  HQ OPS OFFICER:  ERIC THOMAS                  +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |MICHELE EVANS        R1      |
|10 CFR SECTION:                                 |                             |
|ASHU 50.72(b)(2)(i)      PLANT S/D REQD BY TS   |                             |
|AIND 50.72(b)(3)(v)(D)   ACCIDENT MITIGATION    |                             |
|AINB 50.72(b)(3)(v)(B)   POT RHR INOP           |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |99       Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| COMMENCEMENT OF TECH SPEC REQUIRED SHUTDOWN                                  |
|                                                                              |
| "At 16:47 (EST) Unit 1 experienced a loss of Channel 12 Reactor Protection   |
| System (RPS).  Power to RPS Bus 12 was shifted to its backup power supply.   |
| This was coincident with Emergency Diesel Generator 102 (EDG) being          |
| inoperable. This condition requires commencement of a Plant Shutdown within  |
| 1 hour and be in a Cold Shutdown Condition in ten hours (LCO for TS 3.6.3 -  |
| Emergency Power Sources).  At 1746 a shutdown was commenced in accordance    |
| with N1-OP-43C. At 1900 a successful post maintenance test was completed on  |
| EDG 102 and EDG 102 was declared operable. Plant Shutdown actions have been  |
| terminated and the 1 and 10 hour shutdown LCO exited. The plant is at 98.6   |
| percent power and remains in a 7 day LCO in accordance with TS 3.6.3         |
| (Emergency Power Sources).                                                   |
|                                                                              |
| "Investigation is underway into the cause of the loss of RPS Bus 12."        |
|                                                                              |
| Also, the loss of one half of the 'Energize to Function' portion of the      |
| Automatic Depressurization System.                                           |
|                                                                              |
| The NRC Resident will be informed of this event.                             |
+------------------------------------------------------------------------------+