Event Notification Report for December 03, 2002
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 12/02/2002 - 12/03/2002 ** EVENT NUMBERS ** 39408 39409 39413 39414 39416 39418 +------------------------------------------------------------------------------+ |General Information or Other |Event Number: 39408 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: COLORADO DEPT OF HEALTH |NOTIFICATION DATE: 11/27/2002| |LICENSEE: SOILS AND MATERIAL CONSULTANTS |NOTIFICATION TIME: 11:25[EST]| | CITY: ARVADA REGION: 4 |EVENT DATE: 11/25/2002| | COUNTY: STATE: CO |EVENT TIME: 12:00[MST]| |LICENSE#: 595-01 AGREEMENT: Y |LAST UPDATE DATE: 11/27/2002| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |LINDA HOWELL R4 | | |THOMAS ESSIG NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: PENTECOST | | | HQ OPS OFFICER: CHAUNCEY GOULD | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |NAGR AGREEMENT STATE | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | STATE LICENSEE REPORTED A STOLEN MOISTURE DENSITY GAUGE | | | | Soils and Material Consultants reported to the state that a CPN model MC1DR | | (serial # MD 80804445) moisture density gauge was stolen from a truck with a | | locked camper shell while parked on a Wal Mart parking lot in Brighton, Co. | | The gauge was not chained or locked to the truck bed. It contained 10 | | millicuries of Cs-137 and 50 millicuries of Am-241:Be. Local law | | enforcement was notified. No media inquiry or reward has been made at this | | time. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |General Information or Other |Event Number: 39409 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: NEW YORK CITY BUREAU OF RAD HEALTH |NOTIFICATION DATE: 11/27/2002| |LICENSEE: MATERIALS TESTING LAB, INC |NOTIFICATION TIME: 15:31[EST]| | CITY: NEW HYDE PARK REGION: 1 |EVENT DATE: 11/22/2002| | COUNTY: STATE: NY |EVENT TIME: [EST]| |LICENSE#: 2274-3075 AGREEMENT: Y |LAST UPDATE DATE: 11/27/2002| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |JOHN ROGGE R1 | | |THOMAS ESSIG NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: GENE MISKIN | | | HQ OPS OFFICER: STEVE SANDIN | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |NAGR AGREEMENT STATE | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | AGREEMENT STATE REPORT INVOLVING A STOLEN/RECOVERED TROXLER GAUGE | | | | A Troxler Model 3440, S/N 26331, containing 8 millicuries Cs-137 and 40 | | millicuries Am-241:Be, was recovered from an abandoned stolen vehicle in | | Queens, NY at approximately 1300 EST on 11/27/02 after a police cruiser's | | radiological pager alerted. The vehicle was stolen from a location on 120th | | Street between 20th and 21st Ave in Queens and reported to the NY City | | Police Department on 11/22/02. The NY City Health Department Bureau of Rad | | Health is storing the gauge in their lab currently and will return it to the | | licensee after confirming proper ownership. The gauge was found intact with | | normal radiation readings. | | | | Materials Testing Lab, Inc. is a NY State DOL licensee. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39413 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: COOPER REGION: 4 |NOTIFICATION DATE: 12/02/2002| | UNIT: [1] [] [] STATE: NE |NOTIFICATION TIME: 00:31[EST]| | RXTYPE: [1] GE-4 |EVENT DATE: 12/01/2002| +------------------------------------------------+EVENT TIME: 17:33[CST]| | NRC NOTIFIED BY: STEVE WHEELER |LAST UPDATE DATE: 12/02/2002| | HQ OPS OFFICER: MIKE NORRIS +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |LINDA HOWELL R4 | |10 CFR SECTION: | | |AIND 50.72(b)(3)(v)(D) ACCIDENT MITIGATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | STATION STARTUP AND EMERGENCY STATION SERVICE TRANSFORMERS DECLARED | | INOPERABLE | | | | "Available plant indicators showed that main generator output exceeded 150 | | MVARs [million volt-amperes reactive] for approximately 4 minutes due to | | local grid conditions at 17:33 hours on December 1, 2002. The maximum value | | noted was 155 MVARs. Recent analysis and procedural guidance requires the | | two offsite power sources, consisting of the Station Startup Service | | Transformer and the Emergency Station Service Transformer to be declared | | inoperable above 150 MVARs. The grid operator was contacted and action was | | taken to lower local MVARs to below the allowed limit. The offsite power | | sources were declared operable at 17:37 hours." | | | | The Licensee has notified the NRC Resident inspector. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39414 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: PALISADES REGION: 3 |NOTIFICATION DATE: 12/02/2002| | UNIT: [1] [] [] STATE: MI |NOTIFICATION TIME: 01:43[EST]| | RXTYPE: [1] CE |EVENT DATE: 12/01/2002| +------------------------------------------------+EVENT TIME: 21:54[EST]| | NRC NOTIFIED BY: RICHARD GERLING |LAST UPDATE DATE: 12/02/2002| | HQ OPS OFFICER: MIKE NORRIS +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |JAMES CREED R3 | |10 CFR SECTION: |JAMES LYONS NRR | |ARPS 50.72(b)(2)(iv)(B) RPS ACTUATION - CRITICA| | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 A/R Y 100 Power Operation |0 Hot Standby | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | AUTOMATIC REACTOR TRIP ON LOSS OF MAIN GENERATOR LOAD | | | | "At 2154 hours on December 1, 2002, an automatic reactor trip occurred on | | loss of main generator load. The loss of load trip occurred when the main | | generator tripped due to a fault in the plant switchyard. The switchyard | | fault was caused when the ground wire on the 345 KV transmission tower which | | is immediately adjacent to the plant switchyard fell and came in contact | | with switchyard 'R' bus. When the main generator tripped, and with the | | switchyard 'R' bus de-energized as a result of the fault, the cooling tower | | pumps, condensate pumps, and primary coolant pumps lost power. The steam | | driven main feedwater pumps tripped due to loss of suction pressure when the | | condensate pumps tripped. The reactor trip occurred as expected with all | | full-length control rods fully inserted. With the loss of the main feedwater | | pumps the auxiliary feedwater system actuated as expected and is currently | | providing core heat removal. The plant is currently stable in Mode 3 on | | natural circulation. | | | | "Palisades Switchyard Configuration | | | | "The Palisades switchyard is comprised of two 345 KV busses, the 'F' (Front) | | and 'R' (Rear) busses. The plant's Safeguards transformer is fed from the | | 'F' bus. The plant's vital AC busses are normally aligned to the Safeguards | | transformer and remained powered throughout the event. The plant's Startup | | transformer is fed from the 'R' bus. The plant's non-vital AC busses would | | normally transfer to the Startup transformer on a reactor trip. However, | | with the 'R' bus deenergized the Startup transformer was not available and | | therefore power was lost to the cooling tower pumps, condensate pumps, and | | primary coolant pumps. | | | | "Core Heat Removal | | | | "Core heat removal is being provided by the auxiliary feedwater system with | | steaming to atmosphere via the atmospheric steam dump valves. The auxiliary | | feedwater system is comprised of three, full capacity, auxiliary feedwater | | pumps (two motor driven pumps and one steam driven pump). The motor driven | | pumps are powered from the plant's vital AC busses. All three auxiliary | | feedwater pumps are operable and one pump is in service providing core heat | | removal. | | | | "Extra precautions have been taken to ensure the operability of the | | auxiliary feedwater pumps and their power supplies, including the vital AC | | busses, their associated diesel generators, and the offsite circuit from the | | Safeguards transformer. | | | | "Plant Technical Specifications | | | | "The following three Technical Specification LCO Conditions apply as a | | result of the loss of the switchyard 'R' bus: | | | | "Condition 3.8.1A, One offsite circuit inoperable. | | "Condition 3.4.5A, One required PCS loop inoperable. | | "Condition 3.4.5C, No PCS loop OPERABLE." | | | | The Licensee reports that there is no primary to secondary leakage in the | | steam generators. | | | | The Licensee has notified the NRC Resident Inspector. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Fuel Cycle Facility |Event Number: 39416 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: PADUCAH GASEOUS DIFFUSION PLANT |NOTIFICATION DATE: 12/02/2002| | RXTYPE: URANIUM ENRICHMENT FACILITY |NOTIFICATION TIME: 17:32[EST]| | COMMENTS: 2 DEMOCRACY CENTER |EVENT DATE: 12/02/2002| | 6903 ROCKLEDGE DRIVE |EVENT TIME: 14:15[CST]| | BETHESDA, MD 20817 (301)564-3200 |LAST UPDATE DATE: 12/02/2002| | CITY: PADUCAH REGION: 3 +-----------------------------+ | COUNTY: McCRACKEN STATE: KY |PERSON ORGANIZATION | |LICENSE#: GDP-1 AGREEMENT: Y |KENNETH RIEMER R3 | | DOCKET: 0707001 |THOMAS ESSIG NMSS | +------------------------------------------------+TIM MCGINTY IRO | | NRC NOTIFIED BY: KEVIN BEASLEY | | | HQ OPS OFFICER: ARLON COSTA | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |NONR OTHER UNSPEC REQMNT | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | OFFSITE NOTIFICATION TO THE DOE CONCERNING ACCIDENTAL DISCHARGE OF WEAPON ON | | SITE | | | | Misfired security weapon. No one was hurt during this incident and | | compensatory measures were taken as appropriate. The Licensee notified the | | DOE and is in the process of filing a report and indicated that there may be | | a press release on this incident. | | | | The NRC Resident Inspector was notified. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39418 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: NINE MILE POINT REGION: 1 |NOTIFICATION DATE: 12/02/2002| | UNIT: [1] [] [] STATE: NY |NOTIFICATION TIME: 19:48[EST]| | RXTYPE: [1] GE-2,[2] GE-5 |EVENT DATE: 12/02/2002| +------------------------------------------------+EVENT TIME: 17:46[EST]| | NRC NOTIFIED BY: DON SHEEHAN |LAST UPDATE DATE: 12/02/2002| | HQ OPS OFFICER: ERIC THOMAS +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |MICHELE EVANS R1 | |10 CFR SECTION: | | |ASHU 50.72(b)(2)(i) PLANT S/D REQD BY TS | | |AIND 50.72(b)(3)(v)(D) ACCIDENT MITIGATION | | |AINB 50.72(b)(3)(v)(B) POT RHR INOP | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |99 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | COMMENCEMENT OF TECH SPEC REQUIRED SHUTDOWN | | | | "At 16:47 (EST) Unit 1 experienced a loss of Channel 12 Reactor Protection | | System (RPS). Power to RPS Bus 12 was shifted to its backup power supply. | | This was coincident with Emergency Diesel Generator 102 (EDG) being | | inoperable. This condition requires commencement of a Plant Shutdown within | | 1 hour and be in a Cold Shutdown Condition in ten hours (LCO for TS 3.6.3 - | | Emergency Power Sources). At 1746 a shutdown was commenced in accordance | | with N1-OP-43C. At 1900 a successful post maintenance test was completed on | | EDG 102 and EDG 102 was declared operable. Plant Shutdown actions have been | | terminated and the 1 and 10 hour shutdown LCO exited. The plant is at 98.6 | | percent power and remains in a 7 day LCO in accordance with TS 3.6.3 | | (Emergency Power Sources). | | | | "Investigation is underway into the cause of the loss of RPS Bus 12." | | | | Also, the loss of one half of the 'Energize to Function' portion of the | | Automatic Depressurization System. | | | | The NRC Resident will be informed of this event. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021