The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for September 16, 2002


                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           09/13/2002 - 09/16/2002

                              ** EVENT NUMBERS **

39142  39187  39188  39189  39190  39191  39192  

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39142       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: CALLAWAY                 REGION:  4  |NOTIFICATION DATE: 08/21/2002|
|    UNIT:  [1] [] []                 STATE:  MO |NOTIFICATION TIME: 21:03[EDT]|
|   RXTYPE: [1] W-4-LP                           |EVENT DATE:        08/21/2002|
+------------------------------------------------+EVENT TIME:        14:00[CDT]|
| NRC NOTIFIED BY:  EURMAN HENSON                |LAST UPDATE DATE:  09/13/2002|
|  HQ OPS OFFICER:  MIKE NORRIS                  +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |WILLIAM JOHNSON      R4      |
|10 CFR SECTION:                                 |                             |
|AUNA 50.72(b)(3)(ii)(B)  UNANALYZED CONDITION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| UNANALYZED CONDITION REGARDING RCS BORATION REQUIREMENTS                     |
|                                                                              |
| "On August 21, 2002, with Callaway Plant in Mode 1 at 100 % power, it was    |
| determined that a potential unanalyzed condition had existed regarding       |
| Reactor Coolant System (RCS) boration requirements when in Mode 3 below the  |
| P-11 setpoint of 1970 psig RCS pressure. During an extent of condition       |
| review, a concern had been identified regarding the Westinghouse analysis of |
| Steam Line Breaks in Mode 3 below P-11. In order to conclude that acceptable |
| core performance results would be obtained for a lower Mode 3 Steam Line     |
| Break, the Westinghouse analyses assumes that the plant is borated to cold   |
| shutdown conditions prior to blocking P-11. Discussions with Westinghouse    |
| confirmed this requirement was applicable to Callaway. Callaway Plant        |
| procedures did not specifically require that the plant be maintained at Cold |
| Shutdown boron concentrations with P-11 blocked. A historical review         |
| documented that the Callaway Plant shutdown twice within the last three      |
| years. During these shutdowns, the plant maneuvered through Mode 3 below     |
| P-11 once during each plant shutdown and once during each plant startup.     |
|                                                                              |
| "A review of historical data is being conducted for those periods to         |
| establish actual boron concentrations versus calculated requirements for     |
| past conditions. Preliminary reviews for three of those periods have been    |
| completed and document actual boron concentrations of 1397 ppm or greater.   |
|                                                                              |
| "This condition is being reported as an unanalyzed condition until           |
| historical reviews determine otherwise. Compensatory actions taken included  |
| determining a boron concentration that would satisfy accident analysis       |
| requirements for present plant conditions and revising Callaway Plant        |
| procedures to require boration to specified boron concentrations for Mode 3  |
| operation with P-11 blocked."                                                |
|                                                                              |
| P-11(Pressurizer SI Block Permissive) enables BLOCK switches to allow the    |
| operator to block low Pressurizer pressure SI.                               |
|                                                                              |
| The NRC Resident Inspector has been notified.  The Licensee has discussed    |
| this condition with Wolf Creek.                                              |
|                                                                              |
|                                                                              |
| ****RETRACTION ON 09/13/02 AT 1527ET BY E. HENSON TAKEN BY MACKINNON****     |
|                                                                              |
| Upon completion of a review of historical data encompassing the previous     |
| three years of plant operation, it was determined that sufficient boron      |
| concentrations were maintained to ensure compliance with accident analysis   |
| requirements when in Mode 3 below P-11. Based upon this information, no      |
| unanalyzed condition existed and Event Notification # 39142 is being         |
| retracted.  R4DO (Jack Whitten) notified.                                    |
|                                                                              |
| The NRC Resident Inspector was notified of this event retraction.            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39187       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SEQUOYAH                 REGION:  2  |NOTIFICATION DATE: 09/13/2002|
|    UNIT:  [1] [2] []                STATE:  TN |NOTIFICATION TIME: 07:45[EDT]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        09/13/2002|
+------------------------------------------------+EVENT TIME:        06:45[EDT]|
| NRC NOTIFIED BY:  TOM MARSHALL                 |LAST UPDATE DATE:  09/13/2002|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |JON WALLO            R2      |
|10 CFR SECTION:                                 |JOHN DAVIDSON        TAT     |
|DDDD 73.71(b)(1)         SAFEGUARDS REPORTS     |WILLIAM RULAND       NRR     |
|                                                |JOSEPH HOLONICH      IRO     |
|                                                |AL MADISON           NSIR    |
|                                                |ANNE BOLAND          R2      |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| 1-HOUR SECURITY REPORT INVOLVING UNAUTHORIZED ENTRY INTO THE PROTECTED AREA  |
|                                                                              |
| Unauthorized entry into PA.  Immediate compensatory measures taken upon      |
| discovery,.  Licensee will inform the NRC Resident Inspector.  Contact the   |
| Headquarters Operations Officer for details.                                 |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39188       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SEQUOYAH                 REGION:  2  |NOTIFICATION DATE: 09/13/2002|
|    UNIT:  [1] [2] []                STATE:  TN |NOTIFICATION TIME: 09:35[EDT]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        09/13/2002|
+------------------------------------------------+EVENT TIME:        09:22[EDT]|
| NRC NOTIFIED BY:  TOM MARSHALL                 |LAST UPDATE DATE:  09/13/2002|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          UNUSUAL EVENT         |IRC                  R2      |
|10 CFR SECTION:                                 |TERRY REIS           EO      |
|AAEC 50.72(a) (1) (i)    EMERGENCY DECLARED     |JOSEPH HOLONICH      IRO     |
|APRE 50.72(b)(2)(xi)     OFFSITE NOTIFICATION   |DAVID BARDEN         FEMA    |
|                                                |DAMIEN               OHS     |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| UNUSUAL EVENT DECLARED BASED ON EMERGENCY DIRECTOR JUDGMENT                  |
|                                                                              |
| The licensee declared a UE at 0922 EDT based on the judgment of the          |
| Emergency Director and the previous physical security report EN #39187.  The |
| licensee commenced a search of all vital areas for explosives or other       |
| threats at 0900 EDT.  Also, an offsite notification to the FBI was made.     |
| The licensee informed the state and the NRC Resident Inspector.              |
|                                                                              |
| * * * UPDATED AT 2026 EDT ON 9/13/02 BY LARRY PRUETT TO FANGIE JONES * * *   |
|                                                                              |
| The licensee terminated the UE at 2002 EDT after completing a thorough       |
| search.  The licensee notified the NRC Resident Inspector and the state.     |
| Notified R2DO (Mike Ernstes), NRR EO (William Ruland), IRO (Joseph           |
| Holonich), NSIR (Roy Zimmerman), FEMA (Cibock), and OHS (Brahm).             |
|                                                                              |
| The NRC entered Monitoring for this event at 0855 EDT and exited at 2045     |
| EDT.                                                                         |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39189       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SEABROOK                 REGION:  1  |NOTIFICATION DATE: 09/13/2002|
|    UNIT:  [1] [] []                 STATE:  NH |NOTIFICATION TIME: 15:03[EDT]|
|   RXTYPE: [1] W-4-LP                           |EVENT DATE:        09/13/2002|
+------------------------------------------------+EVENT TIME:        14:16[EDT]|
| NRC NOTIFIED BY:  R. STRICKLAND                |LAST UPDATE DATE:  09/13/2002|
|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |DAVID LEW            R1      |
|10 CFR SECTION:                                 |                             |
|NINF                     INFORMATION ONLY       |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| Contract guard accidentally discharged a  weapon in the protected area.      |
| Immediate compensatory measures were taken upon discovery.                   |
|                                                                              |
| NRC Resident Inspector will be notified by the licensee of this event.       |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   39190       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PADUCAH GASEOUS DIFFUSION PLANT      |NOTIFICATION DATE: 09/13/2002|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 20:15[EDT]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        09/12/2002|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        21:20[CDT]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  09/13/2002|
|    CITY:  PADUCAH                  REGION:  3  +-----------------------------+
|  COUNTY:  McCRACKEN                 STATE:  KY |PERSON          ORGANIZATION |
|LICENSE#:  GDP-1                 AGREEMENT:  Y  |CHRISTINE LIPA       R3      |
|  DOCKET:  0707001                              |JANET SCHLUETER      NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  S. SKAGGS                    |                             |
|  HQ OPS OFFICER:  JOHN MacKINNON               |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|NBNL                     RESPONSE-BULLETIN      |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| LOSS OF ONE BARRIER OF DOUBLE CONTINGENCY                                    |
|                                                                              |
| NRC BULLETIN 91-01 24 HOUR NOTIFICATION                                      |
|                                                                              |
| At 2120 CDT, on 9-12-02 the Plant Shift Superintendent (PSS) was notified of |
| the following:                                                               |
| The C-337A south crane does not meet the intent of NUREG-0554 as required by |
| NCSA 042 SRI 5.5.6, NUREG 0554 section 6.3 requires the crane to have        |
| malfunction protection which should include controls to sense and respond to |
| conditions such as excessive electric current, excessive motor temperature,  |
| over speed, overload and over travel.  Over speed protection is not provided |
| in the event of a gearbox failure.  The NCSE/A requires that the crane meet  |
| specifications equivalent to NUREG-0554 when lifting cylinders over          |
| autoclaves that contain cylinders with liquid UF6 greater than or equal to   |
| 1.0 wt.% U235.                                                               |
| Following discovery, the use of this crane to move cylinders over liquid     |
| cylinders that contain equal to/greater than 1.0 wt.% U235 was suspended.    |
|                                                                              |
| The NRC Senior Resident Inspector has been notified of this event.           |
|                                                                              |
| SAFETY SIGNIFICANCE OF EVENTS:                                               |
|                                                                              |
| The crane used to move cylinders over liquid UF6 cylinders did perform as    |
| intended and no cylinder was dropped.  Therefore, the process conditions     |
| were not lost.                                                               |
|                                                                              |
| POTENTIAL CRITICALITY PATHWAYS INVOLVED (BRIEF SCENARIO(S) OF HOW            |
| CRITICALITY COULD OCCUR                                                      |
|                                                                              |
| In order for a criticality to be possible, a cylinder would have to be       |
| dropped on an autoclave that houses a liquid cylinder such that the liquid   |
| cylinder ruptured.  The rupture liquid cylinder contents would then have to  |
| be moderated sufficiently to support a criticality.                          |
|                                                                              |
| CONTROLLED PARAMETERS (MASS, MODERATION, GEOMETRY, CONCENTRATION, ETC.)      |
|                                                                              |
| Double contingency for lifting cylinders over liquid cylinders located in    |
| autoclaves is maintained by requiring the crane to be single-failure proof.  |
| Therefore, in the event part of the crane fails, a second design feature     |
| would prevent the cylinder from falling onto an autoclave, rupturing         |
| rupturing a cylinder, and releasing liquid UF6 into the autoclave, which may |
| contain water and/or steam.  The integrity of the cylinder is intended to    |
| prevent moderation of the UF6 when placed in the autoclave.  Therefore       |
| dropping a cylinder onto an autoclave containing a liquid UF6 cylinder could |
| cause a criticality by allowing water or steam(I.e. moderator) to react with |
| UF6.                                                                         |
|                                                                              |
| The first leg of double contingency is based on the unlikely event of        |
| dropping a cylinder from an overhead bridge crane that has been designed to  |
| lift cylinders.  Since the overhead bridge crane that was used has a 20-ton  |
| capacity and the proper slings and lifting fixtures were used, this leg of   |
| double contingency was maintained.                                           |
|                                                                              |
| The second leg of double contingency is based on using a single-failure      |
| proof crane to move cylinders over liquid cylinders that contain greater     |
| than or equal to 1.0 wt% U235.  Because the crane is not single-failure      |
| proof meeting the requirements equivalent to NUREG-0554, this leg of double  |
| contingency was not maintained.                                              |
|                                                                              |
| ESTIMATED AMOUNT, ENRICHMENT, FORM OF LICENSED MATERIAL (INCLUDE PROCESS     |
| LIMIT AND % WORST CASE CRITICAL MASS):                                       |
|                                                                              |
| 10 ton liquid UF6 Cylinder with a net weight of 20750 lbs UF6 enriched to    |
| ---- wt.% U235.                                                              |
|                                                                              |
| NUCLEAR CRITICALITY SAFETY CONTROL(S) OR CONTROL SYSTEM(S) AND DESCRIPTION   |
| OF THE FAILURES OR DEFICIENCIES                                              |
|                                                                              |
| Crane was determined not to be single fail-proof as per applicable NCSE and  |
| NCSA requirements.                                                           |
|                                                                              |
| CORRECTIVE ACTIONS TO RESTORE SAFETY SYSTEMS AND WHEN EACH WAS IMPLEMENTED:  |
|                                                                              |
| Further use of this crane to move cylinders over liquid that contain greater |
| than or equal to 1.0 wt% U235 was immediately suspended and procedure        |
| changes initiated to reflect requirement.                                    |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39191       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: NORTH ANNA               REGION:  2  |NOTIFICATION DATE: 09/14/2002|
|    UNIT:  [] [2] []                 STATE:  VA |NOTIFICATION TIME: 22:14[EDT]|
|   RXTYPE: [1] W-3-LP,[2] W-3-LP                |EVENT DATE:        09/14/2002|
+------------------------------------------------+EVENT TIME:        20:12[EDT]|
| NRC NOTIFIED BY:  JOHNSTONE                    |LAST UPDATE DATE:  09/14/2002|
|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |MIKE ERNSTES         R2      |
|10 CFR SECTION:                                 |                             |
|ADEG 50.72(b)(3)(ii)(A)  DEGRADED CONDITION     |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     N          N       0        Refueling        |0        Refueling        |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| BORIC ACID RESIDUE DISCOVERED DURING A BAREHEAD INSPECTION OF THE REACTOR    |
| VESSEL HEAD                                                                  |
|                                                                              |
| Two reactor vessel head penetrations on Unit 2 ( #21 and # 31) appear to     |
| have exhibited some amount of leakage during the past cycle of operation.    |
| This conclusion is based on the boric acid residue found at these locations  |
| during the barehead inspection.  This is a preliminary finding, further NDE  |
| and Liquid Penetrant Inspections will be preformed and a repair plan will be |
| developed during this outage.                                                |
|                                                                              |
| A inspection of the reactor vessel head was performed last year and no boric |
| acid residue was noted.                                                      |
|                                                                              |
| The NRC Resident Inspector will be notified of this event by the licensee.   |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   39192       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PADUCAH GASEOUS DIFFUSION PLANT      |NOTIFICATION DATE: 09/15/2002|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 18:08[EDT]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        09/15/2002|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        14:00[CDT]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  09/15/2002|
|    CITY:  PADUCAH                  REGION:  3  +-----------------------------+
|  COUNTY:  McCRACKEN                 STATE:  KY |PERSON          ORGANIZATION |
|LICENSE#:  GDP-1                 AGREEMENT:  Y  |CHRISTINE LIPA       R3      |
|  DOCKET:  0707001                              |JANET SCHLUETER      NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  F. CAGE                      |                             |
|  HQ OPS OFFICER:  JOHN MacKINNON               |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|NBNL                     RESPONSE-BULLETIN      |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| NRC BULLETIN 91-01 4 HOUR NOTIFICATION                                       |
|                                                                              |
| At 0845 CDT, On 9-15-02 the Plant Shift Superintendent (PSS) was notified of |
| the following:                                                               |
|                                                                              |
| At approximately 0500 CDT, on 9-15-02 the Front Line Manager in the C-337    |
| Building observed the pressure in the Unit 3 Cell 2 Freezer-Sublimer (F/S)   |
| vessel to be above the required pressure level.  NCSA CAS-001                |
| Freezer-Sublimers at the Paducah Gaseous Diffusion Plant, requires the       |
| system pressure be maintained below a certain level and, If exceeded,        |
| immediate actions must be taken to reduce the system pressure.  Pressure was |
| not immediately restored to below NCS pressure limits.  At 0923 CDT on       |
| 9-15-02. the pressure was reduced to below the required limit.               |
|                                                                              |
| The NRC Senior Resident inspector has been notified of this event,           |
+------------------------------------------------------------------------------+



Page Last Reviewed/Updated Wednesday, March 24, 2021