The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for September 6, 2002


                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           09/05/2002 - 09/06/2002

                              ** EVENT NUMBERS **

39170  

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   39170       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: WESTINGHOUSE ELECTRIC CORPORATION    |NOTIFICATION DATE: 09/05/2002|
|   RXTYPE: URANIUM FUEL FABRICATION             |NOTIFICATION TIME: 12:18[EDT]|
| COMMENTS: LEU CONVERSION (UF6 to UO2)          |EVENT DATE:        09/05/2002|
|           COMMERCIAL LWR FUEL                  |EVENT TIME:             [EDT]|
|                                                |LAST UPDATE DATE:  09/05/2002|
|    CITY:  COLUMBIA                 REGION:  2  +-----------------------------+
|  COUNTY:  RICHLAND                  STATE:  SC |PERSON          ORGANIZATION |
|LICENSE#:  SNM-1107              AGREEMENT:  Y  |THOMAS DECKER        R2      |
|  DOCKET:  07001151                             |FRED BROWN           NMSS    |
+------------------------------------------------+TIM MCGINTY          IRO     |
| NRC NOTIFIED BY:  CARL SNYDER                  |                             |
|  HQ OPS OFFICER:  RICH LAURA                   |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|NBNL                     RESPONSE-BULLETIN      |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| MATERIAL/WATER IN SCRUBBER VENTILATION DUCT AT FUEL FACILITY                 |
|                                                                              |
| "Facility:  Westinghouse Electric Company, Commercial Fuel Fabrication       |
| Facility, Columbia SC, low enriched PWR fuel fabricator for commercial light |
| water reactors.                                                              |
| License: SNM-l 107. "                                                        |
|                                                                              |
| "Time and Date of Event: Approximately 17:00 hours, Wednesday, September 4,  |
| 2002.'                                                                       |
|                                                                              |
| "Reason for Notification: Material and liquid detected in wet scrubber       |
| ventilation system in Uranium Recycle and Recovery area."                    |
|                                                                              |
| "Summary of Process: This ventilation system draws from the safe geometry    |
| dissolver system in the Uranium Recycle and Recovery area."                  |
|                                                                              |
| "As Found Condition: A summary of the as found conditions is as follows:     |
| Material and liquid was found in ventilation ductwork during a planned       |
| shutdown and inspection. The ventilation system and associated processes     |
| remained shutdown and the Nuclear Criticality Safety (NCS) function was      |
| notified."                                                                   |
|                                                                              |
| "Double Contingency Protection: Double contingency protection for the wet    |
| side of scrubber ventilation ducts greater than 10 inches in diameter        |
| consists of preventing accumulation through prudent system design and        |
| operation, configuration control, and detection/mitigation through periodic  |
| visual inspection and/or gamma surveys of selected lines. A criticality      |
| would be possible in a ventilation duct given an excessive accumulation of   |
| uranium occurs in a scrubber vent line greater than 10 inches in diameter,   |
| and it becomes moderated, and it is not detected before a critical           |
| configuration is formed."                                                    |
|                                                                              |
| "After assessing the ductwork, it was determined that this was a nuclear     |
| criticality safety event, in an analyzed system, for which less than         |
| previously documented double contingency protection remains. The event       |
| requires 24-hour notification in accordance with Westinghouse Operating      |
| License (SNM-1107), paragraph 3.7.3 (c.5)."                                  |
|                                                                              |
| "Summary of Activity: Nuclear Criticality Safety (NCS) participated with     |
| engineering and operations to determine the source of the material and       |
| liquid. This investigation is continuing. The ventilation ductwork was       |
| inspected. Samples from the ductwork are being obtained for analysis. The    |
| ventilation and associated processes are shutdown and in a safe condition."  |
|                                                                              |
| "Conclusions: There was a loss of double contingency protection. At no time  |
| was there any risk to the health or safety of any employee or member of the  |
| public. No exposure to hazardous material was involved. The Incident Review  |
| Committee (IRC) determined that this is a safety significant incident in     |
| accordance with governing procedures. A formal causal analysis will be       |
| performed."                                                                  |
+------------------------------------------------------------------------------+



Page Last Reviewed/Updated Thursday, March 25, 2021