The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for August 15, 2002


                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           08/14/2002 - 08/15/2002

                              ** EVENT NUMBERS **

39130  

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39130       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: HATCH                    REGION:  2  |NOTIFICATION DATE: 08/14/2002|
|    UNIT:  [1] [] []                 STATE:  GA |NOTIFICATION TIME: 15:15[EDT]|
|   RXTYPE: [1] GE-4,[2] GE-4                    |EVENT DATE:        08/14/2002|
+------------------------------------------------+EVENT TIME:        13:00[EDT]|
| NRC NOTIFIED BY:  GORLEY                       |LAST UPDATE DATE:  08/14/2002|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |MARK LESSER          R2      |
|10 CFR SECTION:                                 |                             |
|AINA 50.72(b)(3)(v)(A)   POT UNABLE TO SAFE SD  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| HPCI DECLARED INOPERABLE DUE TO FAILURE OF THE HPCI TURBINE CONTROL SYSTEM   |
|                                                                              |
| The Unit 1 High Pressure Coolant Injection (HPCI) turbine control oil        |
| pressure control valve diaphragm was discovered ruptured.   This prevents    |
| HPCI (a single train system) from operating.  The plant entered a 14 day LCO |
| with this condition.                                                         |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
+------------------------------------------------------------------------------+

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           08/14/2002 - 08/15/2002

                              ** EVENT NUMBERS **

39130  

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39130       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: HATCH                    REGION:  2  |NOTIFICATION DATE: 08/14/2002|
|    UNIT:  [1] [] []                 STATE:  GA |NOTIFICATION TIME: 15:15[EDT]|
|   RXTYPE: [1] GE-4,[2] GE-4                    |EVENT DATE:        08/14/2002|
+------------------------------------------------+EVENT TIME:        13:00[EDT]|
| NRC NOTIFIED BY:  GORLEY                       |LAST UPDATE DATE:  08/14/2002|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |MARK LESSER          R2      |
|10 CFR SECTION:                                 |                             |
|AINA 50.72(b)(3)(v)(A)   POT UNABLE TO SAFE SD  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| HPCI DECLARED INOPERABLE DUE TO FAILURE OF THE HPCI TURBINE CONTROL SYSTEM   |
|                                                                              |
| The Unit 1 High Pressure Coolant Injection (HPCI) turbine control oil        |
| pressure control valve diaphragm was discovered ruptured.   This prevents    |
| HPCI (a single train system) from operating.  The plant entered a 14 day LCO |
| with this condition.                                                         |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
+------------------------------------------------------------------------------+





Page Last Reviewed/Updated Wednesday, March 24, 2021