Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Event Notification Report for August 15, 2002


                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           08/14/2002 - 08/15/2002

                              ** EVENT NUMBERS **

39130  

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39130       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: HATCH                    REGION:  2  |NOTIFICATION DATE: 08/14/2002|
|    UNIT:  [1] [] []                 STATE:  GA |NOTIFICATION TIME: 15:15[EDT]|
|   RXTYPE: [1] GE-4,[2] GE-4                    |EVENT DATE:        08/14/2002|
+------------------------------------------------+EVENT TIME:        13:00[EDT]|
| NRC NOTIFIED BY:  GORLEY                       |LAST UPDATE DATE:  08/14/2002|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |MARK LESSER          R2      |
|10 CFR SECTION:                                 |                             |
|AINA 50.72(b)(3)(v)(A)   POT UNABLE TO SAFE SD  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| HPCI DECLARED INOPERABLE DUE TO FAILURE OF THE HPCI TURBINE CONTROL SYSTEM   |
|                                                                              |
| The Unit 1 High Pressure Coolant Injection (HPCI) turbine control oil        |
| pressure control valve diaphragm was discovered ruptured.   This prevents    |
| HPCI (a single train system) from operating.  The plant entered a 14 day LCO |
| with this condition.                                                         |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
+------------------------------------------------------------------------------+

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           08/14/2002 - 08/15/2002

                              ** EVENT NUMBERS **

39130  

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   39130       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: HATCH                    REGION:  2  |NOTIFICATION DATE: 08/14/2002|
|    UNIT:  [1] [] []                 STATE:  GA |NOTIFICATION TIME: 15:15[EDT]|
|   RXTYPE: [1] GE-4,[2] GE-4                    |EVENT DATE:        08/14/2002|
+------------------------------------------------+EVENT TIME:        13:00[EDT]|
| NRC NOTIFIED BY:  GORLEY                       |LAST UPDATE DATE:  08/14/2002|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |MARK LESSER          R2      |
|10 CFR SECTION:                                 |                             |
|AINA 50.72(b)(3)(v)(A)   POT UNABLE TO SAFE SD  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| HPCI DECLARED INOPERABLE DUE TO FAILURE OF THE HPCI TURBINE CONTROL SYSTEM   |
|                                                                              |
| The Unit 1 High Pressure Coolant Injection (HPCI) turbine control oil        |
| pressure control valve diaphragm was discovered ruptured.   This prevents    |
| HPCI (a single train system) from operating.  The plant entered a 14 day LCO |
| with this condition.                                                         |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
+------------------------------------------------------------------------------+