Event Notification Report for June 20, 2002
U.S. Nuclear Regulatory Commission
Operations Center
Event Reports For
06/19/2002 - 06/20/2002
** EVENT NUMBERS **
38994 39003
+------------------------------------------------------------------------------+
|General Information or Other |Event Number: 38994 |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG: CALIFORNIA RADIATION CONTROL PRGM |NOTIFICATION DATE:
06/14/2002|
|LICENSEE: CITY OF HOPE NATIONAL MEDICAL CENTER |NOTIFICATION TIME:
17:28[EDT]|
| CITY: DUARTE REGION: 4 |EVENT DATE: 06/13/2002|
| COUNTY: LOS ANGELES STATE: CA |EVENT TIME: 14:30[PDT]|
|LICENSE#: 0307-19 AGREEMENT: Y |LAST UPDATE DATE: 06/14/2002|
| DOCKET: |+----------------------------+
| |PERSON ORGANIZATION |
| |ANTHONY GODY R4 |
| |LARRY CAMPER NMSS |
+------------------------------------------------+ |
| NRC NOTIFIED BY: GREGER | |
| HQ OPS OFFICER: CHAUNCEY GOULD | |
+------------------------------------------------+ |
|EMERGENCY CLASS: NON EMERGENCY | |
|10 CFR SECTION: | |
|NAGR AGREEMENT STATE | |
| | |
| | |
| | |
| | |
+------------------------------------------------------------------------------+
EVENT TEXT
+------------------------------------------------------------------------------+
| STATE LICENSEE REPORTED THAT THREE OF TEN I-125 SEEDS WERE LOST IN THE
SEWER |
| DRAIN |
| |
| At 2:30pm on June 13, 2002 the radiation safety officer (RSO) for City of |
| Hope National Medical Center reported that during the course of an |
| iodine-125 prostate permanent implant procedure, three of the ten seeds were |
| lost down the autoclave sink located in the operating room. |
| |
| The initial report from the preliminary investigation was that the operating |
| room technician wanted to wash off the three seeds prior to autoclaving |
| them. They were not going to be used in the procedure. During this process |
| they ended up being washed down the drain of the autoclave sink. Although |
| this occurred at approximately 5:00pm on June 12, 2002, the RSO was not |
| notified until approximately noon on June 13, 2002. They requested the RSO |
| investigate the reason(s) for the delay in reporting the incident. The |
| activity of the iodine -125 seeds was 0.344 mCi each (for a total of 1.032 |
| mCi) at 5:00pm on June 12, 2002. At noon on June 13, 2002 the activity was |
| 0.340 mCi (for a total of 1.02 mCi). |
| |
| On June 14, 2002 a request was made to remove the sink trap and piping in an |
| effort to locate the seeds. At approximately 10:00am it was reported that |
| the seeds were not located, even with the use of a NaI probe and visual |
| examination. This information was forwarded to ICE Supervisor for reporting |
| to the NRC. |
| |
| Investigation # 061402 |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
|Power Reactor |Event Number: 39003 |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: CALLAWAY REGION: 4 |NOTIFICATION DATE: 06/19/2002|
| UNIT: [1] [] [] STATE: MO |NOTIFICATION TIME: 16:30[EDT]|
| RXTYPE: [1] W-4-LP |EVENT DATE: 06/19/2002|
+------------------------------------------------+EVENT TIME: 14:30[CDT]|
| NRC NOTIFIED BY: EUMAR HENSON |LAST UPDATE DATE: 06/19/2002|
| HQ OPS OFFICER: FANGIE JONES +-----------------------------+
+------------------------------------------------+PERSON ORGANIZATION |
|EMERGENCY CLASS: NON EMERGENCY |CHARLES MARSCHALL R4 |
|10 CFR SECTION: | |
|AUNA 50.72(b)(3)(ii)(B) UNANALYZED CONDITION | |
|AINA 50.72(b)(3)(v)(A) POT UNABLE TO SAFE SD | |
|AINB 50.72(b)(3)(v)(B) POT RHR INOP | |
|AIND 50.72(b)(3)(v)(D) ACCIDENT MITIGATION | |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE
|
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1 N Y 100 Power Operation |100 Power Operation |
| | |
| | |
+------------------------------------------------------------------------------+
EVENT TEXT
+------------------------------------------------------------------------------+
| POTENTIAL FOR HOT-SHORT CAUSING THE RWST TO DRAIN |
| |
| "On 6/7/02, Wolf Creek Nuclear Operation Corporation notified Callaway Plant |
| of a potential hot short issue involving the possibility to drain the |
| Refueling Water Storage Tank to the containment recirculation sump during a |
| fire. Initial evaluations indicate a potential for this issue to be |
| applicable to Callaway Plant. |
| |
| "The issue discovered was that control cables for 2 redundant motor operated |
| valves are routed in the same electrical raceway. The 2 valves are on the |
| same electrical separation group, but are redundant in their function of |
| conserving water inventory in the RWST. Further investigation determined |
| that the other electrical separation group has the same configuration. The |
| licensee has implemented an hourly fire watch as a compensatory action. |
| Engineering analyses are being conducted to determine if further |
| modifications are necessary. Appropriate changes or compensations will be |
| instituted into the corrective action system as identified." |
| |
| The licensee informed the NRC Resident Inspection. |
| |
| Related Event #38970 at Wolf Creek |
+------------------------------------------------------------------------------+
Page Last Reviewed/Updated Thursday, March 25, 2021