Event Notification Report for June 20, 2002
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 06/19/2002 - 06/20/2002 ** EVENT NUMBERS ** 38994 39003 +------------------------------------------------------------------------------+ |General Information or Other |Event Number: 38994 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: CALIFORNIA RADIATION CONTROL PRGM |NOTIFICATION DATE: 06/14/2002| |LICENSEE: CITY OF HOPE NATIONAL MEDICAL CENTER |NOTIFICATION TIME: 17:28[EDT]| | CITY: DUARTE REGION: 4 |EVENT DATE: 06/13/2002| | COUNTY: LOS ANGELES STATE: CA |EVENT TIME: 14:30[PDT]| |LICENSE#: 0307-19 AGREEMENT: Y |LAST UPDATE DATE: 06/14/2002| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |ANTHONY GODY R4 | | |LARRY CAMPER NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: GREGER | | | HQ OPS OFFICER: CHAUNCEY GOULD | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |NAGR AGREEMENT STATE | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | STATE LICENSEE REPORTED THAT THREE OF TEN I-125 SEEDS WERE LOST IN THE SEWER | | DRAIN | | | | At 2:30pm on June 13, 2002 the radiation safety officer (RSO) for City of | | Hope National Medical Center reported that during the course of an | | iodine-125 prostate permanent implant procedure, three of the ten seeds were | | lost down the autoclave sink located in the operating room. | | | | The initial report from the preliminary investigation was that the operating | | room technician wanted to wash off the three seeds prior to autoclaving | | them. They were not going to be used in the procedure. During this process | | they ended up being washed down the drain of the autoclave sink. Although | | this occurred at approximately 5:00pm on June 12, 2002, the RSO was not | | notified until approximately noon on June 13, 2002. They requested the RSO | | investigate the reason(s) for the delay in reporting the incident. The | | activity of the iodine -125 seeds was 0.344 mCi each (for a total of 1.032 | | mCi) at 5:00pm on June 12, 2002. At noon on June 13, 2002 the activity was | | 0.340 mCi (for a total of 1.02 mCi). | | | | On June 14, 2002 a request was made to remove the sink trap and piping in an | | effort to locate the seeds. At approximately 10:00am it was reported that | | the seeds were not located, even with the use of a NaI probe and visual | | examination. This information was forwarded to ICE Supervisor for reporting | | to the NRC. | | | | Investigation # 061402 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 39003 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: CALLAWAY REGION: 4 |NOTIFICATION DATE: 06/19/2002| | UNIT: [1] [] [] STATE: MO |NOTIFICATION TIME: 16:30[EDT]| | RXTYPE: [1] W-4-LP |EVENT DATE: 06/19/2002| +------------------------------------------------+EVENT TIME: 14:30[CDT]| | NRC NOTIFIED BY: EUMAR HENSON |LAST UPDATE DATE: 06/19/2002| | HQ OPS OFFICER: FANGIE JONES +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |CHARLES MARSCHALL R4 | |10 CFR SECTION: | | |AUNA 50.72(b)(3)(ii)(B) UNANALYZED CONDITION | | |AINA 50.72(b)(3)(v)(A) POT UNABLE TO SAFE SD | | |AINB 50.72(b)(3)(v)(B) POT RHR INOP | | |AIND 50.72(b)(3)(v)(D) ACCIDENT MITIGATION | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | POTENTIAL FOR HOT-SHORT CAUSING THE RWST TO DRAIN | | | | "On 6/7/02, Wolf Creek Nuclear Operation Corporation notified Callaway Plant | | of a potential hot short issue involving the possibility to drain the | | Refueling Water Storage Tank to the containment recirculation sump during a | | fire. Initial evaluations indicate a potential for this issue to be | | applicable to Callaway Plant. | | | | "The issue discovered was that control cables for 2 redundant motor operated | | valves are routed in the same electrical raceway. The 2 valves are on the | | same electrical separation group, but are redundant in their function of | | conserving water inventory in the RWST. Further investigation determined | | that the other electrical separation group has the same configuration. The | | licensee has implemented an hourly fire watch as a compensatory action. | | Engineering analyses are being conducted to determine if further | | modifications are necessary. Appropriate changes or compensations will be | | instituted into the corrective action system as identified." | | | | The licensee informed the NRC Resident Inspection. | | | | Related Event #38970 at Wolf Creek | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021