Event Notification Report for April 24, 2002
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 04/23/2002 - 04/24/2002 ** EVENT NUMBERS ** 38513 38874 +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 38513 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: SAINT LUCIE REGION: 2 |NOTIFICATION DATE: 11/23/2001| | UNIT: [1] [] [] STATE: FL |NOTIFICATION TIME: 12:30[EST]| | RXTYPE: [1] CE,[2] CE |EVENT DATE: 11/23/2001| +------------------------------------------------+EVENT TIME: 12:10[EST]| | NRC NOTIFIED BY: CHARLIE PIKE |LAST UPDATE DATE: 04/23/2002| | HQ OPS OFFICER: STEVE SANDIN +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |CAUDLE JULIAN R2 | |10 CFR SECTION: | | |APRE 50.72(b)(2)(xi) OFFSITE NOTIFICATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | OFFSITE NOTIFICATION TO FLORIDA STATE INVOLVING RECOVERED SEA TURTLE FROM | | UNIT 1 INTAKE STRUCTURE | | | | "A sea turtle with no external injuries but appearing to be distressed was | | recovered from the Unit 1 Intake Structure. The State Stranding Coordinator | | for sea turtles has been contacted." | | | | * * * UPDATE 11/23/01 AT 1255EST FROM CHARLIE PIKE TO S. SANDIN * * * | | | | "Turtle has died." | | | | The licensee informed both the State of Florida and the NRC Resident | | Inspector. | | | | * * * UPDATE 1413EST ON 12/3/01 FROM JACK BREEN TO FANGIE JONES * * * | | | | At approximately 1215 EST on 12/3/01, a report was made to the Florida | | Department of Fish and Wildlife concerning the recovery of an injured sea | | turtle from the plant's intake canal. The turtle was a green sea turtle in | | the intake canal that appeared distressed and looked to have a wound from a | | boat motor on its back. It will be transferred to the State for | | rehabilitation. | | | | The licensee plans to notify the NRC resident inspector. Notified | | R2DO(MacAlpine). | | | | * * * UPDATE 1333EST ON 12/15/01 FROM JACK BREEN TO JOHN MACKINNON * * * | | | | At approximately 1215 EST on 12/15/01, a report was made to the Florida | | Department of Fish and Wildlife Conservation Commission to pick up a Green | | Turtle for rehabilitation. The Green Turtle was taken from the plant's | | intake canal, and the turtle appears to have shark bites. | | | | The licensee plans to notify the NRC resident inspector. Notified R2DO | | (Chuck Ogle). | | | | * * * UPDATE 1450EST ON 01/06/02 FROM TULLIDGE TO JOHN MACKINNON * * * | | | | At 1350EST, a notification to the State of Florida Department of Fish and | | Wildlife Conservation Commission was made due to finding an injured | | Loggerhead sea turtle in Unit 1 intake. The sea turtle was transported | | offsite for rehabilitation. R2DO (Tom Decker) notified. | | | | The licensee notified the NRC Resident Inspector. | | | | ***UPDATE 1330EST ON 4/23/02 FROM JACK BREEN TO RICH LAURA*** | | | | The licensee rescued a Loggerhead sea turtle from the intake canal. The | | Florida Fish and Wildlife Conservation Commission was notified, and the | | turtle was turned over for rehabilitation. | | | | The NRC Resident Inspector was informed. Notified R2DO (B. Bonser). | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 38874 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: PRAIRIE ISLAND REGION: 3 |NOTIFICATION DATE: 04/23/2002| | UNIT: [] [2] [] STATE: MN |NOTIFICATION TIME: 11:04[EDT]| | RXTYPE: [1] W-2-LP,[2] W-2-LP |EVENT DATE: 02/26/2002| +------------------------------------------------+EVENT TIME: 14:38[CST]| | NRC NOTIFIED BY: DOUG SMITH |LAST UPDATE DATE: 04/23/2002| | HQ OPS OFFICER: MIKE NORRIS +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |JOHN JACOBSON R3 | |10 CFR SECTION: | | |AINV 50.73(a)(1) INVALID SPECIF SYSTEM A| | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | |2 N N 0 Hot Shutdown |0 Hot Shutdown | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | INVALID SPECIFIED SYSTEM ACTUATION WHILE TESTING | | | | "Title: Invalid Safety Injection actuation during testing. | | | | "This is a verbal report being made in accordance with 10 CFR | | 50.73(a)(2)(iv)(A). It is NOT considered a Licensee Event Report (LER) | | | | "Description: | | | | "On February 26, 2002, at 1438 CST, an inadvertent actuation of Unit 2; | | Train B; Safety Injection occurred. Unit 2 was in Mode 4, during start-up | | from the Refueling Outage. During performance of the 'Test of Reactor Trip | | and Bypass Breakers Auxiliary Contacts' procedure, electricians were | | installing volt meter test probes on terminals to obtain voltage readings | | during the test. While installing the test probe, the electrician | | inadvertently made contact with an adjacent terminal. This contact shorted | | two terminals causing a complete actuation of Safety Injection -Train B. | | Following the actuation, operators promptly identified that the signal was | | not valid and took action to realign equipment as necessary to stabilize the | | plant. | | | | "All Unit 2, Train B safeguards equipment started and functioned as | | required. D6 Diesel Generator started as required but did not load because | | normal power remained available. | | | | "The reactor was not critical at the time of the event. The Reactor | | Protection System did not actuate as all control rods were fully inserted | | with the Reactor Trip Breakers open prior to the event." | | | | The NRC Resident Inspector has been notified. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021