The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for March 5, 2002

                         
                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           03/04/2002 - 03/05/2002

                              ** EVENT NUMBERS **

38477  38704  38748  38749  

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38477       |
+------------------------------------------------------------------------------+
                         
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PALISADES                REGION:  3  |NOTIFICATION DATE: 11/07/2001|
|    UNIT:  [1] [] []                 STATE:  MI |NOTIFICATION TIME: 19:47[EST]|
|   RXTYPE: [1] CE                               |EVENT DATE:        11/07/2001|
+------------------------------------------------+EVENT TIME:        14:14[EST]|
| NRC NOTIFIED BY:  DANIEL G. MALONE             |LAST UPDATE DATE:  03/04/2002|
|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |R3 IRC TEAM MANAGER  R3      |
|10 CFR SECTION:                                 |                             |
|AUNA 50.72(b)(3)(ii)(B)  UNANALYZED CONDITION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE  
|
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          N       0        Cold Shutdown    |0        Cold Shutdown    |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| HEAD LOSS CHARACTERISTICS OF CHECK VALVES GREATER THAN PREVIOUSLY
ASSUMED.   |
|                                                                              |
| On November 7, 2001, at approximately 1414 hours, with the plant in mode 5   |
| (cold shutdown), evaluation of preliminary results from mock-up testing of   |
| containment sump check valves determined that the head loss characteristics  |
| of the check valves are greater than previously assumed by calculations that |
| support the safety analyses.  The result of increased head loss through the  |
| containment sump check valves is reduced available net positive suction head |
| (NPSH) for the safety injection and containment spray pumps during           |
| recirculation mode following a loss of coolant accident (LOCA).  The reduced |
| available NPSH may have effected the ability of the pumps to satisfy their   |
| required design safety function during previous periods of plant operation.  |
| Recirculation mode operation of these pumps is required by Technical         |
| Specifications in Mode 3 (hot standby) and above.  Therefore, this condition |
| has no adverse implications for the present plant condition at Mode 5.       |
| Evaluation of test results is continuing.                                    |
|                                                                              |
| The NRC Resident Inspector was notified of this event by the licensee.       |
|                                                                              |
| * * * RETRACTED AT 1450 EST ON 03/04/02 BY DAN MALONE  TO GERRY WAIG* * *    |
|                                                                              |
| "Subsequent evaluation of the past operability of the pumps with the reduced |
| NPSH condition was concluded that the pumps were nonconforming but operable. |
| This conclusion was reached by crediting containment overpressure and actual |
| plant parameters, which increase available NPSH above that required for all  |
| pumps considering the most limiting postulated conditions.                   |
|                                                                              |
| "Since a determination of nonconforming but operable was reached for past    |
| operating conditions, there was no loss of a required safety function and no |
| significant impact on plant safety this condition was originally discovered  |
| and reported with the plant in Mode 5; and was corrected prior to plant      |
| restart by modifying plant equipment and procedures without further reliance |
| on crediting containment overpressure."                                      |
|                                                                              |
| Licensee notified the NRC Resident Inspector. Notified R3DO (John Madera).   |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   38704       |
+------------------------------------------------------------------------------+
                         
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PADUCAH GASEOUS DIFFUSION PLANT      |NOTIFICATION DATE: 02/16/2002|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 11:11[EST]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        02/15/2002|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        22:00[CST]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  03/04/2002|
|    CITY:  PADUCAH                  REGION:  3  +-----------------------------+
|  COUNTY:  McCRACKEN                 STATE:  KY |PERSON          ORGANIZATION |
|LICENSE#:  GDP-1                 AGREEMENT:  Y  |ANTON VEGEL          R3      |
|  DOCKET:  0707001                              |SUSAN FRANT          NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  KEVIN BEASLEY                |                             |
|  HQ OPS OFFICER:  FANGIE JONES                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|OCBA 76.120(c)(2)        SAFETY EQUIPMENT FAILUR|                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| SAFETY EQUIPMENT FAILURE - PROCESS GAS LEAK DETECTION FAILURE                |
|                                                                              |
| "At 2200 CST, on 02-15-02 the Plant Shift Superintendent (PSS) was notified  |
| of a failure of the Process Gas Leak Detector (PGLD) system in the C-333     |
| building.  During above atmospheric operation a PGLD alarm was received in   |
| the Area Control Room [ACR] on C-333 Unit 4 Cell 4.  An operator responded   |
| to the local cell panel to investigate according to the alarm response       |
| procedure.  Upon arriving at the cell panel the operator discovered that the |
| Ready light was not Illuminated on the PGLD panel.  At this time the         |
| operator attempted to test fire the PGLD system, however the system would    |
| not respond. The Front Line Mgr. and the PSS were immediately notified of    |
| the system failure.  At this time, required TSR 2.4.4.1 LCO continuous smoke |
| watches were put in place in the affected areas until repair of the system   |
| was completed.  Following replacement of the power supply by Instrument      |
| Maintenance and testing by Operations, ten Unit 4 Cell 4 PGLD system was     |
| declared operable by the PSS at 2340 CST. At this time the TSR required      |
| smoke watches were discontinued.                                             |
|                                                                              |
| "The PGLD system is designed to detect the leakage of process gas from the   |
| process system and is required to be operable while operating in Cascade     |
| Mode 2 (Above Atmospheric Pressure).  Due to the failure of this TSR         |
| required system; the PSS has determined that this is reportable as a 24 hour |
| Event Report.                                                                |
|                                                                              |
| "The NRC Resident inspector has been notified of this event."                |
|                                                                              |
| * * * RETRACTED AT 0346 EST ON 02/22/02 BY ERIC WALKER TO FANGIE JONES * * * |
|                                                                              |
|                                                                              |
| "This event has been retracted. Even though the power loss causes the system |
| to be incapable of annunciating additional alarms from this system in the    |
| ACR, the same is true when a PGLD head actuates in response to smoke. The    |
| system Is designed to alert operators of a release or loss of system power.  |
| Operator response and the initiation of a smoke watch provide the safety     |
| function after the initial alarm is annunciated. The NRC resident inspector  |
| has been notified of this update."                                           |
|                                                                              |
| The R3DO (Bruce Jorgensen) and NMSS EO (E. William Brach) have been          |
| notified.                                                                    |
|                                                                              |
| * * * UPDATED AT 1750 EST ON 3/4/02 BY TOM WHITE TO FANGIE JONES * * *       |
|                                                                              |
| "Following discussions with NRC Region III and the PGDP NRC Senior Resident  |
| Inspector. USEC has determined that a rescission of the retraction made on   |
| 2/21/02 will be necessary in response to NRC concerns related to this        |
| matter. Therefore, USEC hereby rescinds the subject retraction and will be   |
| submitting the written report required by 10CFR76.120(d)(2). The NRC Senior  |
| Resident Inspector has been notified of the rescission."                     |
|                                                                              |
| Notified the R3DO (John Madera) and NMSS EO (C. W. Reamer).                  |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38748       |
+------------------------------------------------------------------------------+
                         
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: MCGUIRE                  REGION:  2  |NOTIFICATION DATE: 03/04/2002|
|    UNIT:  [1] [] []                 STATE:  NC |NOTIFICATION TIME: 10:13[EST]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        03/04/2002|
+------------------------------------------------+EVENT TIME:        08:41[EST]|
| NRC NOTIFIED BY:  PHILLIP THOMPSON             |LAST UPDATE DATE:  03/04/2002|
|  HQ OPS OFFICER:  MIKE NORRIS                  +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |CAUDLE JULIAN        R2      |
|10 CFR SECTION:                                 |                             |
|ARPS 50.72(b)(2)(iv)(B)  RPS ACTUATION - CRITICA|                             |
|AESF 50.72(b)(3)(iv)(A)  VALID SPECIF SYS ACTUAT|                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE  
|
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     M/R        Y       100      Power Operation  |0        Hot Standby      |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| MANUAL REACTOR TRIP DUE TO LOSS OF FEEDWATER                                 |
|                                                                              |
| "Manual reactor trip due to falling level in 1A Steam Generator (S/G), (RPS  |
| Activation).  Level decrease occurred after the Feedwater Regulating Valve   |
| (FRV) for the 1A S/G failed closed upon loss of the normal and backup        |
| electrical power to the valve solenoid. After the reactor trip, the 1A S/G   |
| experienced a LO-LO Level Alarm which auto started both motor driven         |
| Auxiliary Feedwater pumps, (ESF Actuation).  All S/G levels are now at       |
| normal levels and Unit 1 is stable.  An investigation is in progress to      |
| determine the loss of electrical power to the FRV solenoid for the 1A S/G."  |
|                                                                              |
| The plant is dumping steam to the Main Condenser with no known               |
| Primary/Secondary leakage.  There was no actuation of primary safety valves. |
| All safety systems are operable and normal electrical distribution is        |
| available.                                                                   |
|                                                                              |
| The NRC Resident Inspector has been notified.                                |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38749       |
+------------------------------------------------------------------------------+
                         
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: POINT BEACH              REGION:  3  |NOTIFICATION DATE: 03/04/2002|
|    UNIT:  [1] [2] []                STATE:  WI |NOTIFICATION TIME: 11:37[EST]|
|   RXTYPE: [1] W-2-LP,[2] W-2-LP                |EVENT DATE:        03/04/2002|
+------------------------------------------------+EVENT TIME:             [CST]|
| NRC NOTIFIED BY:  RICK ROBBINS                 |LAST UPDATE DATE:  03/04/2002|
|  HQ OPS OFFICER:  GERRY WAIG                   +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          UNUSUAL EVENT         |JOHN MADERA          R3      |
|10 CFR SECTION:                                 |CHRIS GRIMES         EO      |
|AAEC 50.72(a) (1) (i)    EMERGENCY DECLARED     |RICHARD WESSMAN      IRO     |
|                                                |JEFF GRANT           R3      |
|                                                |REGION V OSC         EPA     |
|                                                |BELCHER              FEMA    |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE  
|
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| UNUSUAL EVENT DUE TO UNCONTROLLED FLAMMABLE GAS LEAK ONSITE                  |
|                                                                              |
| At 0946 CST, 3/4/02, an Unusual Event was declared due to a non isolable     |
| leak on a propane tank.  The tank is approximately 500 to 750 gals, and is   |
| 55 % full.  The tank is leaking at the rate of 5% decrease every 20 minutes. |
| The tank  is 25 to 30 yards out in the Owner Controlled Area and a local     |
| area evacuation has been performed.  The Two Creek Fire Department is on the |
| scene.                                                                       |
|                                                                              |
| NRC Resident Inspector has been notified.                                    |
|                                                                              |
| At 1147 EST, NRC entered Monitoring for Normal Phase Mode.                   |
|                                                                              |
| ***EVENT UPDATED AT 1309 EST ON 3/4/02 BY MARK HANSON TO FANGIE JONES***     |
|                                                                              |
| At 1154 CST, Licensee terminated Unusual Event due to leak isolated.         |
|                                                                              |
| At 1310 EST, NRC exited monitoring for the Unusual Event.                    |
|                                                                              |
| Notified IRO (Holonich), R3DO (Madera), NRR (Grimes), PAO (Dricks), FEMA     |
| (Snyder).                                                                    |
+------------------------------------------------------------------------------+
