The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for January 4, 2002

                         
                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           01/03/2002 - 01/04/2002

                              ** EVENT NUMBERS **

38518  

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38518       |
+------------------------------------------------------------------------------+
                         
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: POINT BEACH              REGION:  3  |NOTIFICATION DATE: 11/26/2001|
|    UNIT:  [1] [2] []                STATE:  WI |NOTIFICATION TIME: 13:37[EST]|
|   RXTYPE: [1] W-2-LP,[2] W-2-LP                |EVENT DATE:        11/26/2001|
+------------------------------------------------+EVENT TIME:        12:32[CST]|
| NRC NOTIFIED BY:  ROBERT ADAMS                 |LAST UPDATE DATE:  01/03/2002|
|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |BRUCE JORGENSEN      R3      |
|10 CFR SECTION:                                 |                             |
|NONR                     OTHER UNSPEC REQMNT    |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE  
|
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| ERDS INOPERABLE DUE TO PLANNED OUTAGE OF THE PLANT PROCESS COMPUTER
SYSTEM   |
| (PPCS)                                                                       |
|                                                                              |
| AT 1232 CT, the Point Beach Nuclear Plant ERDS became inoperable as a result |
| of modifications to change out the plant process computer system (PPCS).     |
| This is a planned evolution.  ERDS will remain inoperable until              |
| approximately, December 18, 2001.                                            |
|                                                                              |
| This information was verbally provided to a representative of NRR during the |
| week of 10/15/2001.  The senior resident inspector has also been briefed on  |
| the modifications and schedule.  NMC to NRC letter (NRC 01-0080) dated       |
| 11/21/2001 stated we would be submitting this Non-Emergency report.          |
|                                                                              |
| ***** UPDATE FROM RICK ROBBINS TO LEIGH TROCINE AT 2006 EST ON 11/27/01      |
| *****                                                                        |
|                                                                              |
| The following additional information is a portion of a facsimile received    |
| from the licensee:                                                           |
|                                                                              |
| "As part of the PPCS modification, several inputs to the SPDS monitor were   |
| also made unavailable.  Any out-of-service indications on the SPDS can be    |
| obtained by control room control board indications."                         |
|                                                                              |
| The licensee notified the NRC resident inspector.  The NRC operations center |
| notified the R3DO (Bruce Jorgensen).                                         |
|                                                                              |
| * * * UPDATE 1259EST ON 12/22/01 FROM RYAN RODE TO S. SANDIN * * *           |
|                                                                              |
| The licensee provided the following information as an update:                |
|                                                                              |
| "On 11/26/01 at 12:32, the PBNP ERDS and SPDS were declared out of service   |
| for the PPCS upgrade project.  EN #38518 indicated to the NRC that the       |
| systems would remain unavailable until approximately December 18, 2001.  Due |
| to reliability issues with the newly installed PPCS, that expected date has  |
| been delayed to approximately January 3, 2002."                              |
|                                                                              |
| The licensee informed the NRC Resident Inspector.  Notified R3DO(Phillips).  |
|                                                                              |
| * * * UPDATE ON 01/03/02 @1430 BY MEYER TO GOULD * * *                       |
|                                                                              |
| During the installation of the new PPCS, issues were identified which need   |
| to be resolved to allow SPDS and ERDS to be placed back in service fully.    |
| Currently, the new PPCS is only partially operable.  Work is continuing on   |
| the new PPCS to allow full operability.  The current estimate for return to  |
| service of SPDS and ERDS is 01/19/02.  This date may need to be extended     |
| again due to parts availability.                                             |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
|                                                                              |
| Notified Reg 3 RDO(Shear)                                                    |
+------------------------------------------------------------------------------+


Page Last Reviewed/Updated Thursday, March 25, 2021