Event Notification Report for December 13, 2001
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 12/12/2001 - 12/13/2001 ** EVENT NUMBERS ** 38558 38559 . +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 38558 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: CALLAWAY REGION: 4 |NOTIFICATION DATE: 12/12/2001| | UNIT: [1] [] [] STATE: MO |NOTIFICATION TIME: 11:32[EST]| | RXTYPE: [1] W-4-LP |EVENT DATE: 12/12/2001| +------------------------------------------------+EVENT TIME: 08:20[CST]| | NRC NOTIFIED BY: STEVEN AUFDEMBERGE |LAST UPDATE DATE: 12/12/2001| | HQ OPS OFFICER: BOB STRANSKY +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |GREG PICK R4 | |10 CFR SECTION: | | |APRE 50.72(b)(2)(xi) OFFSITE NOTIFICATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | OFFSITE NOTIFICATION REGARDING NPDES PERMIT VIOLATION | | | | "This 4-hour call is being made to the NRC based on the requirements of | | 10CFR50.72(b)(2)(xi). A written report was submitted to the Missouri | | Department of Natural Resources concerning the discharge of plant processed | | water to a storm water runoff outfall inconsistent with the terms and | | conditions of Callaway Plant's NPDES permit. This written report was | | submitted on December 12, 2001, and addresses a discharge of water from the | | plant circulating water system that occurred on December 7, 2001. | | | | "On December 12, 2001, the Missouri Department of Natural Resources (Mo. | | DNR) was notified that a discharge of plant processed water from our | | circulating water system, occurred. This event occurred on December 7, 2001 | | and was the result of a minor leak that developed at a caulked construction | | joint in our cooling tower basin. | | | | "This event resulted in a notification to the Mo. DNR on 12/12/01. It was | | concluded this event is reportable per 10CFR50.72(b)(2)(xi) since it | | represents a notification to a government agency relating to the protection | | of the environment." | | | | The NRC Resident Inspector was notified of this event by the licensee. | +------------------------------------------------------------------------------+ . +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 38559 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: RIVER BEND REGION: 4 |NOTIFICATION DATE: 12/12/2001| | UNIT: [1] [] [] STATE: LA |NOTIFICATION TIME: 15:58[EST]| | RXTYPE: [1] GE-6 |EVENT DATE: 10/15/2001| +------------------------------------------------+EVENT TIME: 00:01[CST]| | NRC NOTIFIED BY: DAVID CLYMER |LAST UPDATE DATE: 12/12/2001| | HQ OPS OFFICER: LEIGH TROCINE +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |GREG PICK R4 | |10 CFR SECTION: | | |AINV 50.73(a)(1) INVALID SPECIF SYSTEM A| | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 80 Power Operation |80 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | ISOLATION OF DIVISION I CONTAINMENT ISOLATION VALVES DUE TO THE UNEXPECTED | | TRIP OF THE FEEDER BREAKER FOR A NON-SAFETY 480-VOLT AC SWITCHGEAR (60-Day | | Report) | | | | The following text is a portion of a facsimile received from the licensee: | | | | "On October 15, 2001, at approximately 12:01 a.m., with the plant at | | approximately 80% power, an isolation of Division I containment isolation | | valves occurred. This event was caused by the unexpected trip of the feeder | | breaker for one of the plant's non-safety 480-volt AC switchgears. In | | addition, five manual breakers on the same switchgear opened. This | | deenergized the normal power supply to the Division I reactor protection | | system (RPS), which caused the actuation of Division I containment isolation | | valves. This event is being reported in accordance with the 60-day | | telephone notification provision in 10CFR50.73(a)(2)(iv)(A) as an invalid | | general containment isolation signal." | | | | "Division I containment isolation valves automatically closed, and the | | Division I annulus mixing and standby gas treatment systems received an | | automatic start signal. Consistent with plant design, isolation of the | | annulus pressure control system subsequently caused the Division II annulus | | mixing and standby gas treatment systems to start. However, the Division II | | annulus mixing fan breaker tripped open after receiving a close signal. | | Both divisions of the fuel building charcoal filter trains started. The | | Division I containment atmosphere hydrogen analyzer automatically started." | | | | "After an initial assessment, operators implemented abnormal operating | | procedures and restored systems in containment to their normal alignment. | | Plant operation was not interrupted. Except for the trip of the Division II | | annulus mixing fan, all plant systems responded as designed to the event. | | The fan trip is being addressed within the stations corrective action | | program." | | | | "The investigation of the spurious breaker trips is still in progress. | | Tests completed thus far have not determined the cause of the trip, and | | switchgear inspections performed during a brief plant outage in the interim | | found no hardware deficiencies. The Division I RPS system remains powered | | from its alternate source, which will prevent its loss should the switchgear | | again be de-energized. The switchgear has been instrumented in order to | | collect transient data in the event the trips recur." | | | | The licensee notified the NRC resident inspector. | +------------------------------------------------------------------------------+ .
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021