The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for August 24, 2001

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           08/23/2001 - 08/24/2001

                              ** EVENT NUMBERS **

38227  38228  38229  38230  

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   38227       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: HONEYWELL INTERNATIONAL, INC.        |NOTIFICATION DATE: 08/22/2001|
|   RXTYPE: URANIUM HEXAFLUORIDE PRODUCTION      |NOTIFICATION TIME: 11:43[EDT]|
| COMMENTS: UF6 CONVERSION (DRY PROCESS)         |EVENT DATE:        07/27/2001|
|                                                |EVENT TIME:             [CDT]|
|                                                |LAST UPDATE DATE:  08/23/2001|
|    CITY:  METROPOLIS               REGION:  3  +-----------------------------+
|  COUNTY:  MASSAC                    STATE:  IL |PERSON          ORGANIZATION |
|LICENSE#:  SUB-526               AGREEMENT:  Y  |RONALD GARDNER       R3      |
|  DOCKET:  04003392                             |JAMES CREED (R3)     IAT     |
+------------------------------------------------+JOHN DAVIDSON (NMSS) IAT     |
| NRC NOTIFIED BY:  HUGH ROBERTS                 |FRED BROWN           NMSS    |
|  HQ OPS OFFICER:  FANGIE JONES                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|BAB2 20.2201(a)(1)(ii)   LOST/STOLEN LNM>10X    |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| MISSING SHIPMENT OF CaF SETTLING POND CLEANUP WASTE                          |
|                                                                              |
| A shipment of CaF settling pond waste left the site on July 25, 2001 and     |
| apparently did not arrive on July 27, 2001 at the Andrews County WCS in      |
| Texas.  The shipment, one of several, consisted of 44,480 pounds of 80% CaF  |
| and 20% lime with less than 500 ppm natural uranium contained in it.  The    |
| natural uranium is calculated at about 19 pounds total contained in the      |
| shipment.  The driver reported that the shipment was delivered, but there is |
| no paperwork to support the delivery.                                        |
|                                                                              |
| The licensee notified NRC Region 3 (Monte Phillips), the EPA,  and the       |
| Illinois State Police, who are investigating.                                |
|                                                                              |
| * * * UPDATE ON 8/23/01 @ 1425 BY ROBERTS TO GOULD * * *                     |
|                                                                              |
| Wills Trucking found the material intact on the ground on 8/22/01 north of   |
| Dallas, Tx. and they are responding with the Texas EPA and other regulatory  |
| agencies.                                                                    |
|                                                                              |
| Notified Reg 3 RDO(Gardner), Brown(NMSS), Reg 3 IAT(Creed) and               |
| NMSS(Davidson) by e-mail                                                     |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38228       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: WATTS BAR                REGION:  2  |NOTIFICATION DATE: 08/23/2001|
|    UNIT:  [1] [] []                 STATE:  TN |NOTIFICATION TIME: 13:05[EDT]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        08/08/2001|
+------------------------------------------------+EVENT TIME:        22:43[EDT]|
| NRC NOTIFIED BY:  TOUCHSTONE                   |LAST UPDATE DATE:  08/23/2001|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |EDWARD MCALPINE      R2      |
|10 CFR SECTION:                                 |                             |
|AINV 50.73(a)(1)         INVALID SPECIF SYSTEM A|                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| AUTOMATIC START OF AN EMERGENCY DIESEL GENERATOR                             |
|                                                                              |
| The following information is provided as a 60 day telephone notification to  |
| NRC in accordance with 10 CFR 50.73(a)(1) in lieu of submitting a written    |
| LER to report a condition that resulted in an invalid actuation of WBN       |
| Emergency Diesel Generator (EDG) 2B-B.  NUREG 1022, Rev 2, identifies the    |
| information that needs to be reported as discussed:                          |
|                                                                              |
| (a)The specific train(s) and system(s) that were actuated.                   |
|                                                                              |
| On August 8, 2001, at 2243 hours, Train B, Emergency Diesel Generator 2B-B   |
| (System 82) actuated (automatically started). The cause of the start is      |
| under evaluation, but was not in response to actual plant conditions or an   |
| ESF signal.  No loss of essential board voltage was observed, no emergency   |
| start signal initiated (manually or automatically), and no other initiating  |
| signal such as an SI occurred.                                               |
|                                                                              |
| (b) Whether each train actuation was complete or partial.                    |
|                                                                              |
| The actuation is considered complete.  EDG 2B-B automatically started and    |
| accelerated to rated speed of 900 RPM.  As there was no loss of essential    |
| board voltage, no load shedding occurred and the diesel generator output     |
| breaker remained disconnected from its respective shutdown board.            |
|                                                                              |
| (c) Whether or not the system started and functioned successfully.           |
|                                                                              |
| EDG 2B-B automatically started and functioned successfully.   As discussed   |
| above, the EDG accelerated to rated speed of 900 RPM.  Since there was no    |
| loss of essential board voltage, the diesel remained disconnected from its   |
| respective shutdown board and available to perform its safety function in    |
| the event of a loss of offsite power. No complications were observed.        |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38229       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SUSQUEHANNA              REGION:  1  |NOTIFICATION DATE: 08/23/2001|
|    UNIT:  [1] [2] []                STATE:  PA |NOTIFICATION TIME: 16:53[EDT]|
|   RXTYPE: [1] GE-4,[2] GE-4                    |EVENT DATE:        08/23/2001|
+------------------------------------------------+EVENT TIME:        16:21[EDT]|
| NRC NOTIFIED BY:  FITCH                        |LAST UPDATE DATE:  08/23/2001|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          UNUSUAL EVENT         |JAMES NOGGLE         R1      |
|10 CFR SECTION:                                 |ELINOR ADENSAM       NRR     |
|AAEC 50.72(a) (1) (i)    EMERGENCY DECLARED     |RICHARD WESSMAN      IRO     |
|DDDD 73.71               UNSPECIFIED PARAGRAPH  |ROBERTA WARREN       IAT     |
|                                                |RICHARD ROSANO       IAT     |
|                                                |GREGORY SMITH        IAT     |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| SUSPECTED INTRUSION ON THE SITE                                              |
|                                                                              |
| IMMEDIATE COMPENSATORY MEASURES TAKEN ON DISCOVERY                           |
|                                                                              |
| THE LICENSEE NOTIFIED THE NRC RESIDENT INSPECTOR, STATE, LOCAL AND OTHER     |
| GOVT.  AGENCIES                                                              |
|                                                                              |
| A PRESS RELEASE WILL BE ISSUED.                                              |
|                                                                              |
| CONTACT HOO FOR ADDITIONAL DETAILS                                           |
|                                                                              |
| * * *  UPDATE ON 8/23/01 @ 2009 BY WOZINSKI TO GOULD * * *                   |
|                                                                              |
| THE NOUE WAS TERMINATED AT 1952                                              |
|                                                                              |
| THE RESIDENT INSPECTOR WAS NOTIFIED                                          |
|                                                                              |
| REG 1 RDO(NOGGLE), EO(ADENSAM), FEMA(CANUPP), IAT(ROSANO), IAT(WARREN) WERE  |
| INFORMED                                                                     |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38230       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PEACH BOTTOM             REGION:  1  |NOTIFICATION DATE: 08/24/2001|
|    UNIT:  [2] [3] []                STATE:  PA |NOTIFICATION TIME: 02:29[EDT]|
|   RXTYPE: [2] GE-4,[3] GE-4                    |EVENT DATE:        08/23/2001|
+------------------------------------------------+EVENT TIME:        21:43[EDT]|
| NRC NOTIFIED BY:  NILS BAHLIN                  |LAST UPDATE DATE:  08/24/2001|
|  HQ OPS OFFICER:  FANGIE JONES                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |JAMES NOGGLE         R1      |
|10 CFR SECTION:                                 |                             |
|ACOM 50.72(b)(3)(xiii)   LOSS COMM/ASMT/RESPONSE|                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|2     N          Y       100      Power Operation  |100      Power Operation  |
|3     N          Y       80       Power Operation  |80       Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| LOSS OF ELECTRICAL POWER TO THE TECHNICAL SUPPORT CENTER                     |
|                                                                              |
| An unexpected electrical breaker trip has caused a loss of power to the      |
| Technical Support Center (TSC).                                              |
|                                                                              |
| On 08/23/01 at the main control room was notified that the TSC, which is     |
| located in a building adjacent to the protected area, was without power.     |
| Communications were verified available from the TSC.                         |
|                                                                              |
| An investigation revealed that an offsite breaker controlled by the power    |
| system director had tripped.  Further investigation is in progress to        |
| identify and repair any deficiencies.                                        |
|                                                                              |
| The station procedures for contingency  actions were put in place if an      |
| event requiring the TSC were to occur during the loss of power.  Power was   |
| restored to the TSC at 0130 EDT on 08/24/01 from an alternate offsite        |
| source.                                                                      |
|                                                                              |
| The licensee notified the NRC Resident Inspector.                            |
+------------------------------------------------------------------------------+
