The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for August 17, 2001

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           08/16/2001 - 08/17/2001

                              ** EVENT NUMBERS **

38201  38212  38213  38214  38215  38216  38217  38218  38219  

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38201       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: OYSTER CREEK             REGION:  1  |NOTIFICATION DATE: 08/10/2001|
|    UNIT:  [1] [] []                 STATE:  NJ |NOTIFICATION TIME: 23:02[EDT]|
|   RXTYPE: [1] GE-2                             |EVENT DATE:        08/10/2001|
+------------------------------------------------+EVENT TIME:        21:15[EDT]|
| NRC NOTIFIED BY:  ERIC DEMONCH                 |LAST UPDATE DATE:  08/16/2001|
|  HQ OPS OFFICER:  LEIGH TROCINE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |DANIEL HOLODY        R1      |
|10 CFR SECTION:                                 |                             |
|ARPS 50.72(b)(2)(iv)(B)  RPS ACTUATION - CRITICA|                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       84       Power Operation  |84       Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| UNPLANNED REACTOR PROTECTION SYSTEM (RPS) SYSTEM/SAFETY SYSTEM ACTUATIONS    |
| WHILE CRITICAL                                                               |
|                                                                              |
| The following text is a portion of a facsimile received from the licensee:   |
|                                                                              |
| "[The unit] received [an] isolation of the [transverse incore probe (TIP)]   |
| purge system and the offgas system during [an] electrical transient on the   |
| 230kV distribution system.  [The licensee believes] the isolations were      |
| caused by the voltage fluctuations felt in the plant from the grid.  Since   |
| the TIP purge isolation is processed through [the reactor protection system  |
| (RPS)] and offgas from the offgas [radiation] monitors, this falls under     |
| actuation of a safety system while critical."                                |
|                                                                              |
| "[The licensee] reset isolations and restored systems to normal."            |
|                                                                              |
| The licensee stated that the isolation signals that were processed did not   |
| show up on any alarms.  Alarms were received but nothing specific to         |
| indicate the isolations.  This may have been due to voltage                  |
| fluctuations/losses as a result of power/instrument panels that transferred  |
| to their alternate power supplies.  The voltage fluctuations on the in-house |
| 4160V buses were attributed to the electrical transient on the 230kV         |
| distribution system.                                                         |
|                                                                              |
| There was severe weather in the area at the time of this event.  As a        |
| result, one of two 230kV outgoing power lines and both 34.5kV feed lines     |
| were lost.  All of these lines have since been returned to service.  The     |
| licensee stated that offsite power was never lost because one 230kV line     |
| remained available to backfeed/supply the 34.5kV buses.                      |
|                                                                              |
| The licensee notified the NRC resident inspector.                            |
|                                                                              |
| * * * RETRACTED AT 1840 EDT ON 8/16/2001 BY JERE FREEMAN TO FANGIE JONES * * |
| *                                                                            |
|                                                                              |
| The licensee, after review of the event, determined that the actuation of a  |
| single component due to a power panel transfer on a voltage transient did    |
| not meet the requirement of an actuation of the containment isolation system |
| for reportability.  Per NUREG 1022 Rev 2, this event was not reportable and  |
| is retracted.                                                                |
|                                                                              |
| The licensee notified the NRC Resident Inspector.  The R1DO (William Ruland) |
| has been notified.                                                           |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   38212       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: MALLINCKRODT INC.                    |NOTIFICATION DATE: 08/16/2001|
|   RXTYPE: NUCLEAR PHARMACY                     |NOTIFICATION TIME: 10:00[EDT]|
| COMMENTS: RADIOPHARMACEUTICAL OPERATIONS       |EVENT DATE:        08/16/2001|
|           MEDICAL R&D                          |EVENT TIME:        08:45[CDT]|
|                                                |LAST UPDATE DATE:  08/16/2001|
|    CITY:  MARYLAND HTS.            REGION:  3  +-----------------------------+
|  COUNTY:  ST. LOUIS                 STATE:  MO |PERSON          ORGANIZATION |
|LICENSE#:  24-4206-01            AGREEMENT:  N  |THOMAS KOZAK         R3      |
|  DOCKET:  03000001                             |BRIAN SMITH          NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  JAMES SCHUH                  |                             |
|  HQ OPS OFFICER:  STEVE SANDIN                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|BAD1 20.2202(a)(1)       PERS OVEREXPOSURE      |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| PERSONNEL OVEREXPOSURES INVOLVING TWO WORKERS BETWEEN 1995 AND 1999          |
|                                                                              |
| An on-going dose reconstruction in response to Confirmatory Action Letter    |
| EA-00-143, dated June 22, 2000, identified two (2) workers who received more |
| than 250 Rem to their extremities, specifically less than one (1) square     |
| centimeter of the fingertips.  The overexposures occurred between 1995 and   |
| 1999 on seven (7) occurrences during the manufacturing process involving     |
| P-32.  The licensee will inform the two individuals involved and offer       |
| medical services, if requested.  The licensee discussed this incident with   |
| NRC Region 3 (Cameron).                                                      |
|                                                                              |
| * * * UPDATED AT 1532 EDT ON 8/16/2001 BY JAMES SCHUH TO FANGIE JONES * * *  |
|                                                                              |
| The on-going review has identified a total of 4 workers in 10 occurrences    |
| with overexposures.  All have occurred in similar activities except for 1    |
| person in 2 events doing a different process.  NRC Region 3 (Bob Gatone) has |
| been contacted by the licensee.                                              |
|                                                                              |
| The R3DO (Thomas Kozak) and NMSS (Brian Smith) have been notified.           |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38213       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: BROWNS FERRY             REGION:  2  |NOTIFICATION DATE: 08/16/2001|
|    UNIT:  [] [2] [3]                STATE:  AL |NOTIFICATION TIME: 11:14[EDT]|
|   RXTYPE: [1] GE-4,[2] GE-4,[3] GE-4           |EVENT DATE:        08/16/2001|
+------------------------------------------------+EVENT TIME:        08:25[CDT]|
| NRC NOTIFIED BY:  TERRY KNUETTEL               |LAST UPDATE DATE:  08/16/2001|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |CHARLIE PAYNE        R2      |
|10 CFR SECTION:                                 |                             |
|HFIT 26.73               FITNESS FOR DUTY       |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|3     N          Y       100      Power Operation  |100      Power Operation  |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| FITNESS FOR DUTY REPORT INVOLVING CONTRACTOR FOREMAN                         |
|                                                                              |
| A contractor foreman was determined to be under the influence of alcohol     |
| during a random test.  The contractor's access to the plant has been         |
| terminated.  The licensee informed the NRC Region 2 Office (Wallow) and the  |
| Resident Inspector.                                                          |
|                                                                              |
| Contact the Headquarters Operation Officer for details.                      |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38214       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: LIMERICK                 REGION:  1  |NOTIFICATION DATE: 08/16/2001|
|    UNIT:  [1] [2] []                STATE:  PA |NOTIFICATION TIME: 11:40[EDT]|
|   RXTYPE: [1] GE-4,[2] GE-4                    |EVENT DATE:        08/16/2001|
+------------------------------------------------+EVENT TIME:        09:25[EDT]|
| NRC NOTIFIED BY:  PETER ORPHANOS               |LAST UPDATE DATE:  08/16/2001|
|  HQ OPS OFFICER:  FANGIE JONES                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |RONALD BELLAMY       R1      |
|10 CFR SECTION:                                 |                             |
|ACOM 50.72(b)(3)(xiii)   LOSS COMM/ASMT/RESPONSE|                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| ALL EMERGENCY OFFSITE SIRENS INOPERABLE                                      |
|                                                                              |
| The licensee determined that all 16 Emergency Offsite Sirens were            |
| inoperable.  The exact cause of the failure is unknown and a plan is being   |
| developed to repair the sirens.                                              |
|                                                                              |
| The licensee notified the NRC Resident Inspector and intends to notify the   |
| state and local authorities.                                                 |
|                                                                              |
| * * * UPDATED AT 1735 EDT ON 8/16/2001 BY PETER ORPHANOS TO FANGIE JONES * * |
| *                                                                            |
|                                                                              |
| "As of 1300 August 16, 2001 163 of 165 Limerick Generating Station Emergency |
| Offsite Sirens are determined to be functional.                              |
|                                                                              |
| "A plan has been developed and investigation continues into the cause of the |
| inoperability of the sirens."                                                |
|                                                                              |
| The licensee notified the NRC Resident Inspector.  The R1DO (William Ruland) |
| has been notified.                                                           |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   38215       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PORTSMOUTH GASEOUS DIFFUSION PLANT   |NOTIFICATION DATE: 08/16/2001|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 12:23[EDT]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        08/15/2001|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        15:45[EDT]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  08/16/2001|
|    CITY:  PIKETON                  REGION:  3  +-----------------------------+
|  COUNTY:  PIKE                      STATE:  OH |PERSON          ORGANIZATION |
|LICENSE#:  GDP-2                 AGREEMENT:  N  |THOMAS KOZAK         R3      |
|  DOCKET:  0707002                              |JOHN HICKEY          NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  MIKE RITCHIE                 |                             |
|  HQ OPS OFFICER:  FANGIE JONES                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|NBNL                     RESPONSE-BULLETIN      |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| 24-HOUR NRC BULLETIN 91-01 REPORT                                            |
|                                                                              |
| The licensee has notified the NRC Resident Inspector and the DOE             |
| representative.                                                              |
|                                                                              |
| The following text is a portion of a facsimile received from Portsmouth      |
| personnel:                                                                   |
|                                                                              |
| During a walk through of the X-705 Decontamination Facility a hole was       |
| discovered on the top of the Calciner glove box. The hole could have allowed |
| uranium bearing solution to accumulate in the bottom of the glove box [in]   |
| the unlikely event of a leak. This is in violation of the analysis of        |
| NCSA-705_024.E02 "Calciner Solution Recovery" which specifically evaluates   |
| this event.                                                                  |
|                                                                              |
| The PSS entered an anomalous condition. Tape was placed over the hole on the |
| top of the Calciner glove box. The PSS exited the anomalous condition.       |
|                                                                              |
| This event is reportable per NRC BL 91-01 as a loss of one control of the    |
| double contingency principle.                                                |
|                                                                              |
| SAFETY SIGNIFICANCE OF EVENTS:  low                                          |
|                                                                              |
| There was no leak of uranium bearing material in the vicinity of the         |
| Calciner glove box.  Also, the opening on the glove box is very small. This  |
| would require a significant amount of time for the solution to accumulate in |
| the glove [box] had a leak occurred at that exact location.                  |
|                                                                              |
| POTENTIAL CRITICALITY PATHWAYS INVOLVED (BRIEF SCENARIO[S] OF HOW            |
| CRITICALITY COULD                                                            |
| OCCUR):                                                                      |
|                                                                              |
| For a criticality to occur, the following events would be required: The      |
| recovery system would have to be operating and processing uranium bearing    |
| liquid with a high concentration of uranium. Then the leak in this system    |
| must occur such that solution sprays onto the glove box. The liquid would    |
| then have to flow through the small opening on the top of the glove box and  |
| accumulate to a depth of >1.5 inches.                                        |
|                                                                              |
| CONTROLLED PARAMETERS (MASS, MODERATION, GEOMETRY, CONCENTRATION, ETC.):     |
| volume, geometry                                                             |
|                                                                              |
| The unlikely event supporting double contingency credits the integrity of    |
| the glove box for preventing solution from collecting in an unsafe           |
| geometry/volume.  The hole on the top of the glove box could potentially     |
| allow solution to enter the glove box.                                       |
|                                                                              |
| ESTIMATED AMOUNT, ENRICHMENT, FORM OF LICENSED MATERIAL (INCLUDE PROCESS     |
| LIMIT AND % WORST CASE OF CRITICAL MASS):                                    |
|                                                                              |
| No uranium material was involved in this event.                              |
|                                                                              |
| NUCLEAR CRITICALITY SAFETY CONTROL(S) OR CONTROL SYSTEM(S) AND DESCRIPTION   |
| OF THE FAILURES OR DEFICIENCIES:                                             |
|                                                                              |
| The hole could have allowed uranium bearing solution to accumulate in the    |
| bottom of the glove box in the unlikely event of a leak. This is in          |
| violation of the analysis of NCSA-705_024.E02 "Calciner Solution Recovery"   |
| which specifically evaluates this event. The presence of the opening         |
| undermines the basis of an unlikely event credited for double contingency.   |
|                                                                              |
| CORRECTIVE ACTIONS TO RESTORE SAFETY SYSTEM AND WHEN EACH WAS IMPLEMENTED:   |
|                                                                              |
| Tape was [placed] on the hole on top of the glove box.                       |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38216       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: OCONEE                   REGION:  2  |NOTIFICATION DATE: 08/16/2001|
|    UNIT:  [1] [2] [3]               STATE:  SC |NOTIFICATION TIME: 16:19[EDT]|
|   RXTYPE: [1] B&W-L-LP,[2] B&W-L-LP,[3] B&W-L-L|EVENT DATE:        08/16/2001|
+------------------------------------------------+EVENT TIME:        13:55[EDT]|
| NRC NOTIFIED BY:  PRESTON GILLESPIE            |LAST UPDATE DATE:  08/16/2001|
|  HQ OPS OFFICER:  FANGIE JONES                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |CHARLIE PAYNE        R2      |
|10 CFR SECTION:                                 |                             |
|APRE 50.72(b)(2)(xi)     OFFSITE NOTIFICATION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|3     N          Y       100      Power Operation  |100      Power Operation  |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| OFFSITE NOTIFICATION DUE TO OIL SPILL AT ASSOCIATED HYDRO  UNIT              |
|                                                                              |
| The licensee was performing work on the pier at the Keowee Hydro Intake      |
| structure when about 1 gallon of Mobil EAL 224H (biodegradable) oil spilled  |
| into Lake Keowee.  A boom had previously been installed and contained the    |
| oil in a 50 foot by 50 foot area.  The spill was a result of a hydraulic     |
| hose leak.  The clean-up was nearly complete at the time of the report.      |
| There was no effect on plant operations or any safety significance.          |
|                                                                              |
| The licensee notified the National Response Center, the South Carolina       |
| Department of Health and Environmental Control, and the NRC Resident         |
| Inspector.                                                                   |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|General Information or Other                     |Event Number:   38217       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  COLORADO DEPT OF HEALTH              |NOTIFICATION DATE: 08/16/2001|
|LICENSEE:  CITY AND COUNTY OF DENVER            |NOTIFICATION TIME: 19:00[EDT]|
|    CITY:  DENVER                   REGION:  4  |EVENT DATE:        08/14/2001|
|  COUNTY:  DENVER                    STATE:  CO |EVENT TIME:        13:40[MDT]|
|LICENSE#:  333-03                AGREEMENT:  Y  |LAST UPDATE DATE:  08/16/2001|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |WILLIAM JOHNSON      R4      |
|                                                |THOMAS ESSIG         NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  CLAYTON GOODWIN              |                             |
|  HQ OPS OFFICER:  FANGIE JONES                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|NAGR                     AGREEMENT STATE        |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| AGREEMENT STATE REPORT - DAMAGED TROXLER GAUGE                               |
|                                                                              |
| "At approximately 1:40 PM on August 14, 2001 an unidentified person in a     |
| private automobile ran over a Troxler nuclear density gauge while this gauge |
| was being used by a trained technician at a work site southwest Denver. The  |
| technician narrowly escaped being stuck by the vehicle, but the vehicle did  |
| strike the gauge. The exterior casing of the gauge was damaged and broken    |
| into numerous pieces as a result of the collision. However the sealed source |
| and shielding assembly remained intact. Following the incident the source    |
| was able to be retracted into the shielding and the shutter closed."         |
|                                                                              |
| Denver Police were notified immediately following the incident.              |
|                                                                              |
| The site and the gauge with the sealed source were surveyed and no leakage   |
| was found.                                                                   |
|                                                                              |
| The Troxler gauge involved is a model 4640B (serial number 841) containing a |
| single, 8-millicurie, Cs-137, sealed source (serial number 50-7987).         |
|                                                                              |
| The gauge will be shipped back to Troxler.                                   |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38218       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PEACH BOTTOM             REGION:  1  |NOTIFICATION DATE: 08/17/2001|
|    UNIT:  [2] [3] []                STATE:  PA |NOTIFICATION TIME: 00:31[EDT]|
|   RXTYPE: [2] GE-4,[3] GE-4                    |EVENT DATE:        08/16/2001|
+------------------------------------------------+EVENT TIME:        23:25[EDT]|
| NRC NOTIFIED BY:  STEVE TANNER                 |LAST UPDATE DATE:  08/17/2001|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |WILLIAM RULAND       R1      |
|10 CFR SECTION:                                 |                             |
|ACOM 50.72(b)(3)(xiii)   LOSS COMM/ASMT/RESPONSE|                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|2     N          Y       100      Power Operation  |100      Power Operation  |
|3     N          Y       82       Power Operation  |82       Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| LOSS OF EMERGENCY SIREN REMOTE ACTUATION CAPABILITY                          |
|                                                                              |
| "Omni phone system was lost resulting in a loss of Emergency Siren remote    |
| actuation control.  Power was lost 8/16/01 22:25 EDT and restored 8/16/01    |
| 23:55 EDT.  Per reportability manual ID# E-02 and Event# SAF 1.10, loss of   |
| assessment capability is reportable after 8 hours, but loss of greater than  |
| 25% of the sirens for more than one hour constitutes immediate               |
| notification.                                                                |
|                                                                              |
| "The omni phone system was lost due to the associated battery voltage        |
| becoming too low to support system operation.  This was caused by a          |
| temporary battery charger installed in place of the normal charger (due to a |
| failed transformer) not maintaining the battery adequately charged.          |
| Immediate omni system recovery was effected using available AC power from an |
| alternate source to power up the equipment.  Long term plans are to replace  |
| the failed transformer and return the normal charger to service."            |
|                                                                              |
| The licensee informed the NRC resident inspector and will inform state/local |
| agencies.                                                                    |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Other Nuclear Material                           |Event Number:   38219       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  McMINN'S ASPHALT CO., INC.           |NOTIFICATION DATE: 08/17/2001|
|LICENSEE:  McMINN'S ASPHALT CO., INC.           |NOTIFICATION TIME: 04:59[EDT]|
|    CITY:  MANHEIM                  REGION:  1  |EVENT DATE:        08/17/2001|
|  COUNTY:                            STATE:  PA |EVENT TIME:        00:30[EDT]|
|LICENSE#:  371965901             AGREEMENT:  N  |LAST UPDATE DATE:  08/17/2001|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |WILLIAM RULAND       R1      |
|                                                |                             |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  GARY LUTZ                    |                             |
|  HQ OPS OFFICER:  STEVE SANDIN                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          NON EMERGENCY         |                             |
|10 CFR SECTION:                                 |                             |
|NINF                     INFORMATION ONLY       |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| TROXLER GAUGE DAMAGED BY VEHICLE AT CONSTRUCTION SITE                        |
|                                                                              |
| At 0030EDT on 8/17/01 a light pickup truck struck a Troxler gauge at a road  |
| construction project on State Road 340 in Lancaster, PA.  The East Lampeter  |
| Police Department responded (Incident # 01-414) briefly closing traffic.     |
| The RSO surveyed the device and confirmed that the sealed source was intact  |
| prior to removal.  The Troxler is a model 4640B containing an 8-millicurie   |
| Cs-137 source.  The licensee is returning the device to the manufacturer's   |
| service center in Timonium, MD for inspection and repair.                    |
+------------------------------------------------------------------------------+
