Event Notification Report for July 6, 2001
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 07/05/2001 - 07/06/2001 ** EVENT NUMBERS ** 38115 38116 38117 38118 38119 +------------------------------------------------------------------------------+ |General Information or Other |Event Number: 38115 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: U. S. CUSTOMS SERVICE |NOTIFICATION DATE: 07/05/2001| |LICENSEE: UNKNOWN |NOTIFICATION TIME: 08:50[EDT]| | CITY: MIAMI REGION: 2 |EVENT DATE: 07/03/2001| | COUNTY: DADE STATE: FL |EVENT TIME: 12:30[EDT]| |LICENSE#: AGREEMENT: Y |LAST UPDATE DATE: 07/05/2001| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |EDWARD MCALPINE R2 | | |FRED BROWN NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: CHRIS WHITENTON | | | HQ OPS OFFICER: STEVE SANDIN | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |NINF INFORMATION ONLY | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | UNMARKED LICENSED RAD MATERIAL RECEIVED AT PORT OF ENTRY | | | | A closed intermodal container shipped by Alcan of Kingston, Jamaica to CPN | | International in California was off loaded and inspected at the Port of | | Entry in Miami, FL. U.S. Customs alerted local Hazmat personnel after | | receiving alarms on personnel monitors. Hazmat surveyed both the exterior | | and interior of the container and found readings of approximately 1 mr/hr | | and 8 mr/hr, respectively. A followup investigation determined that the | | container had unmarked density detectors used in mining operations. The | | shipment has been quarantined and will be returned to the shipper. The | | National Response Center was informed of this incident by U.S. Customs on | | 7/3/01 (report #571693). | | | | Contact the Headquarters Operations Officer for contact telephone number. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 38116 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: DRESDEN REGION: 3 |NOTIFICATION DATE: 07/05/2001| | UNIT: [] [] [3] STATE: IL |NOTIFICATION TIME: 12:15[EDT]| | RXTYPE: [1] GE-1,[2] GE-3,[3] GE-3 |EVENT DATE: 07/05/2001| +------------------------------------------------+EVENT TIME: 10:19[CDT]| | NRC NOTIFIED BY: BORING |LAST UPDATE DATE: 07/05/2001| | HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: ALERT |ROGER LANKSBURY R3 | |10 CFR SECTION: |TAD MARSH EO | |AAEC 50.72(a) (1) (i) EMERGENCY DECLARED |CALDWELL FEMA | |ARPS 50.72(b)(2)(iv)(B) RPS ACTUATION - CRITICA| | |AESF 50.72(b)(3)(iv)(A) VALID SPECIF SYS ACTUAT| | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | | | | |3 M/R Y 100 Power Operation |0 Hot Shutdown | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | THE REACTOR WAS MANUALLY SCRAMMED FROM 100% POWER DUE TO HIGH DRYWELL | | PRESSURE | | | | The plant entered an Alert @ 1019CDT due to drywell pressure rising above | | the ECCS setpoint(2 psig). The reactor was manually scrammed at 1006 and | | drywell pressure peaked at 2.3 psig. All rods fully inserted and no safety | | relief valves lifted. ECCS functioned as required, but no injection | | initiated. Drywell pressure is currently 2.1 psig and slowly trending | | down. | | | | The NRC Resident Inspector was notified along with state ,local and other | | Government agencies. Other agencies notified by NRC: Tanner(EPA), | | Young(DOE), Conley( USDA), Gray(HHS), Robertson(DOT), and Watson(USSS). | | | | NRC entered the monitoring mode at 1209 EDT. | | | | * * * UPDATE @ 1300EDT COMMISSIONERS ASSISTANT'S BRIEFING * * * | | | | Wessman(IRO), Borchardt(NRR), Gagner(PAO), Combs(SP), Hauber(IP), | | Madden(CO), Bergman(EDO), Paperiello(DEDMRS), Tschiltz(Chairman Assist.), | | Hiltz(Commissioner Dicus), Beall(Commissioner McGaffigan) Thoma(Commissioner | | Merrifield), Dyer(Reg 3 Briefer), and Gamberoni(Secy) | | | | Monitoring mode was terminated at 1737 EDT. | | | | * * * UPDATE AT 1757 ON 7/05/01 BY MOHR TO GOULD * * * | | | | Subsequent to earlier notification, information has been obtained that | | verifies the cause of the high drywell pressure was due to a loss of | | containment cooling. A redundant cooling water train was placed in service | | and the drywell temperature and pressure have been trending down to normal | | ranges. The drywell sump was pumped and confirmed that RCS leak rates have | | not increased. Drywell radiation levels were verified to be normal. | | Additionally, drywell atmosphere samples were normal. Drywell pressure is | | currently .37 PSIG. The plant has been stabilized in accordance with | | procedures and equipment repairs are being made. Plans are being developed | | for unit return to service. | | | | The Alert was terminated at 1602 CDT. | | | | The NRC Resident Inspector and State have been informed. | | | | * * * UPDATE AT 1825 ON 7/5/01 BY MOHR TO GOULD * * * | | | | The plant also had groups 2 and 3 isolations, low pressure and high pressure | | ECCS initiation signals and Unit 3 and 2/3 swing emergency diesel generator | | auto starts. | | | | The NRC Resident Inspector was informed. | | | | * * * UPDATE 1900 ON 7/05/91 MODIFIED COMMISSIONER ASSISTANT'S BRIEFING * * | | * | | | | Dyer(REG3), Marsh(NRR), Tschiltz(Chairman's Assistants), Thoma(Commissioner | | Merrifield's Assistant), and Hiltz(Commissioner Dicus' Assistant) | | | | Agencies notified by the NRC: Cegielski(FEMA), Poppell(EPA), Morrone(DOE), | | Conley(USDA), Robertson(DOT), Farrow-Collier(CDC). Notified Beckner(EO), | | Wessman(IRO), Hayden(PA) and Vegel(REG 3 RDO). | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 38117 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: CALVERT CLIFFS REGION: 1 |NOTIFICATION DATE: 07/05/2001| | UNIT: [1] [2] [] STATE: MD |NOTIFICATION TIME: 12:30[EDT]| | RXTYPE: [1] CE,[2] CE |EVENT DATE: 07/05/2001| +------------------------------------------------+EVENT TIME: 09:00[EDT]| | NRC NOTIFIED BY: ROBERT MARTIN |LAST UPDATE DATE: 07/05/2001| | HQ OPS OFFICER: FANGIE JONES +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |LAWRENCE DOERFLEIN R1 | |10 CFR SECTION: | | |APRE 50.72(b)(2)(xi) OFFSITE NOTIFICATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | |2 N Y 100 Power Operation |100 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | OFFSITE NOTIFICATION TO MARYLAND DEPARTMENT OF ENVIRONMENT | | | | The licensee notified the Maryland Department of Environment due to a | | positive coliform count in the drinking water at the educational center. | | The licensee notified the NRC Resident Inspector. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |General Information or Other |Event Number: 38118 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: TEXAS DEPARTMENT OF HEALTH |NOTIFICATION DATE: 07/05/2001| |LICENSEE: ALPHA TESTING INC |NOTIFICATION TIME: 14:50[EDT]| | CITY: DALLAS REGION: 4 |EVENT DATE: 06/25/2001| | COUNTY: STATE: TX |EVENT TIME: 06:20[CDT]| |LICENSE#: L03411-000 AGREEMENT: Y |LAST UPDATE DATE: 07/05/2001| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |LINDA HOWELL R4 | | |DON COOL NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: OGDEN (by fax) | | | HQ OPS OFFICER: CHAUNCEY GOULD | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |NAGR AGREEMENT STATE | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | STOLEN HUMBOLDT HS-5001P NUCLEAR DENSITY GAUGE | | | | A Humboldt Manufacturing Model HS-5001 P, Serial No. 30, containing 10 | | millicurie Cs-137, Serial No. 400SGF; and 40 millicurie Am-241/Be, Serial | | No. NJ00026 was stolen. Initial information indicates that the gauge was in | | the bed of a company pickup truck secured by bungee cords in the gauge's | | locked transit case when the driver stopped at a convenience store, located | | at 104 Kaufman Street, Rockwall, Texas. at approximately 6:15 a.m. on June | | 25, 2001. The operator/driver noticed the gauge was missing when he | | returned to his truck which was parked immediately in front of the store's | | front doors. He has estimated that he was in the store for approximately 5 | | minutes. A police report has been filed with the Rockwall, Texas Police | | Department. A copy of this report is currently not available. The gauge | | was enroute to a jobsite when stolen. The owner of the stolen gauge is a | | Texas Licensee, L03411-000 (Alpha Testing, Inc.. 2209 Wisconsin Street, | | Suite 100 Dallas, Texas 75229). | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 38119 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: FERMI REGION: 3 |NOTIFICATION DATE: 07/05/2001| | UNIT: [2] [] [] STATE: MI |NOTIFICATION TIME: 16:03[EDT]| | RXTYPE: [2] GE-4 |EVENT DATE: 07/05/2001| +------------------------------------------------+EVENT TIME: 10:00[EDT]| | NRC NOTIFIED BY: COSEI |LAST UPDATE DATE: 07/05/2001| | HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |ROGER LANKSBURY R3 | |10 CFR SECTION: | | |AINA 50.72(b)(3)(v)(A) POT UNABLE TO SAFE SD | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |2 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | NON-CONSERVATIVE ANALYSIS FOR OPRM SCRAM SETPOINTS | | | | On July 5, 2001, Detroit Edison received confirmation from General Electric | | of a non-conservative analysis that supports Operation Power Range Monitor | | (OPRM) scram setpoints. The non-conservative analysis is generic and been | | determined to affect Fermi 2. The OPRM had been conservatively declared | | inoperable on June 27, 2001, at 1333 hours as a result of preliminary | | notification by General Electric. | | | | The consequences of the non-conservative analysis are that the associated | | OPRM Reactor Protective System (RPS) scram setpoints are non-conservative. | | The non-conservative RPS setpoints may result in violating the Minimum | | Critical Power Ratio (MCPR) safety limit during a thermal-hydraulic | | instability. | | | | All OPRM channels have been declared inoperable. Technical Specification | | 3.3.1.1 Action J requires an alternate method of detecting and suppressing | | thermal-hydraulic instabilities to be implemented within 12 hours. | | Alternate methods have been established, thus, the Technical Specification | | required action is satisfied. Fermi 2 has 120 days to restore the OPRMs to | | an operable condition. | | | | This initial report is being made in accordance with 10CFR50.72 (B)(3)(V)(A) | | as a condition that could have prevented the fulfillment of the safety | | function of a system needed to shutdown the reactor. | | | | See EN #38104, GE Nuclear Energy 10CFR21 report. | | | | The NRC Resident Inspector will be notified. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021