Event Notification Report for June 15, 2001
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 06/14/2001 - 06/15/2001 ** EVENT NUMBERS ** 38009 38071 38072 !!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!!!! +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 38009 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: COMANCHE PEAK REGION: 4 |NOTIFICATION DATE: 05/18/2001| | UNIT: [] [2] [] STATE: TX |NOTIFICATION TIME: 15:08[EDT]| | RXTYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 05/18/2001| +------------------------------------------------+EVENT TIME: 12:30[CDT]| | NRC NOTIFIED BY: CASPERSEN |LAST UPDATE DATE: 06/14/2001| | HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |BLAIR SPITZBERG R4 | |10 CFR SECTION: | | |AUNA 50.72(b)(3)(ii)(B) UNANALYZED CONDITION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | |2 N Y 100 Power Operation |100 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | AN UNANALYZED CONDITION WAS FOUND WHEN AN EXISTING PIPE TRENCH BLOCKOUT | | PATHWAY SEPARATING TWO ROOMS WAS FOUND TO BE BLOCKED. | | | | After reviewing the Unit 2 flooding calculation (environmental calculations | | for Auxiliary Feedwater and performing a walkdown of the area, it was | | determined that the calculation model which assumed an existing pipe trench | | blockout pathway separating the 2 rooms to be an open pathway. This pathway | | was found to be blocked leading to an unanalyzed condition. | | | | A PRA evaluation was performed for this condition. The result of this | | evaluation shows that the potential degraded condition due to the sealed | | pathway and missing backwater check valves in the drain lines does not pose | | a significant increase in the core damage risk. However, an additional | | review on May 15, 2001, it was deemed that the cumulative risk increase is | | potentially significant assuming the condition existed since initial | | evaluation. Therefore, this issue is being conservatively reported pursuant | | to 10 CFR 50.72 (ii)(B). | | | | No Technical Specification OPERABILITY issues are identified as a result of | | this event. Additionally this event has been evaluated per GL 91-18 and | | actions are being taken to be in compliance with the flooding calculations. | | | | The NRC Resident Inspector will be notified. | | | | * * * RETRACTED AT 1657 EDT ON 6/14/01 BY STEVEN SEWELL TO FANGIE JONES * * | | * | | | | "On 5/18/01 at 1508 hours, Comanche Peak Unit 2 reported an unanalyzed | | condition per 10CFR50.72(b)(3)(ii)(B) [EN# 38009). Specifically, the | | reported condition involved Unit 2 flooding/environmental calculations for | | the Auxiliary Feedwater (AFW) system that assumed an existing pipe trench | | blockout pathway separating 2 rooms to be an open pathway. During a walkdown | | of the area, it was determined that the pathway was scaled and backwater | | check valves did not exist in all floor drain lines from the three AFW pump | | rooms. This as-found configuration led to an unanalyzed condition where all | | three AFW pumps could be potentially incapacitated by a piping break in any | | one of the AFW pump rooms. This condition was determined to have existed | | since initial licensing and an initial, conservative, PRA evaluation of this | | condition determined that the cumulative risk increase was potentially | | significant. | | | | "Subsequently, a detailed deterministic analysis was performed to determine | | the consequence of flooding given the as found conditions. That evaluation | | shows that in no case is there a flooding scenario that results in the loss | | of all three AFW pumps. Comanche Peak Unit 2 has three pump trains (two 50% | | capacity motor driven pumps and one 100% capacity steam turbine driven | | pump). The worst case scenario is flooding in one of the motor driven AFW | | pump rooms which results in the loss of both motor driven pumps. In this | | case, the evaluation shows that the turbine driven pump is not disabled. | | Further, the flood waters do not adversely impact any other safety related | | equipment modeled in the PRA. The deterministic evaluation further concluded | | that a break occurring in the turbine driven pump room does not adversely | | impact either of the motor driven pump rooms. | | | | "The results of this evaluation show that the potentially degraded condition | | due to the sealed pathway and missing backwater check valves does not pose a | | significant core damage risk increase as a result of potential consequential | | equipment failures. Therefore. Comanche Peak requests that the 5/18/01 | | 10CFR50.72(b)(3)(ii)(B) reportable event for Unit 2 be retracted." | | | | The licensee notified the NRC Resident Inspector. The R4DO (John Pellet) | | has been notified. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Hospital |Event Number: 38071 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: VIRGINIA CARDIOVASCULAR SPECIALIST |NOTIFICATION DATE: 06/14/2001| |LICENSEE: VIRGINIA CARDIOVASCULAR SPECIALIST |NOTIFICATION TIME: 14:59[EDT]| | CITY: RICHMOND REGION: 2 |EVENT DATE: 06/13/2001| | COUNTY: STATE: VA |EVENT TIME: 14:00[EDT]| |LICENSE#: 4525406-01 AGREEMENT: N |LAST UPDATE DATE: 06/14/2001| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |ANNE BOLAND R2 | | |JOHN HICKEY NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: YVONNE WEAVER | | | HQ OPS OFFICER: FANGIE JONES | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |LADM 35.33(a) MED MISADMINISTRATION | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | MEDICAL MISADMINISTRATION - WRONG PATIENT WAS GIVEN DIAGNOSTIC DOSAGE | | | | There were 2 patients in the waiting room with similar names. When the name | | was called out, the wrong patient answered and was administered the dose of | | 32.7 mCi of Technetium Sestamibi Cardiolyte. Subsequently, it was | | determined that the wrong patient received the dose. The patient and | | attending physician have been notified. | | | | A written report will follow. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |General Information or Other |Event Number: 38072 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: ARKANSAS DEPARTMENT OF HEALTH |NOTIFICATION DATE: 06/14/2001| |LICENSEE: R. D. PLANT CONTRACTING |NOTIFICATION TIME: 16:09[EDT]| | CITY: MURFREESBORO REGION: 4 |EVENT DATE: 06/14/2001| | COUNTY: STATE: AR |EVENT TIME: 10:00[CDT]| |LICENSE#: ARK756BP0405 AGREEMENT: Y |LAST UPDATE DATE: 06/14/2001| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |JOHN PELLET R4 | | |JOHN HICKEY NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: DAVID SNELLINGS | | | HQ OPS OFFICER: FANGIE JONES | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |NAGR AGREEMENT STATE | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | AGREEMENT STATE REPORT - MISSING TROXLER SURFACE DENSITY GAUGE | | | | The licensee notified the State of Arkansas about 10:00 AM CDT today | | 6/14/01, that a Troxler Model 4640B surface density gauge, containing 8 mCi | | of Cs-137, was missing from the back of his truck. The gauge was known to | | be chained and locked in the back of the truck last night (6/13/01) around | | 7:00 PM CDT. The chain and lock are still in the truck, undamaged. The | | Howard County Sheriff's Department and Hope, Arkansas Police have been | | notified of the missing gauge. There will be a press release sent to state | | police, surrounding states and local authorities. NRC Region 4 (Vivian | | Campbell) has been notified. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021