The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for March 1, 2001

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           02/28/2001 - 03/01/2001

                              ** EVENT NUMBERS **

37785  37786  37787  37788  37789  37791  37792  37793  

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37785       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SEABROOK                 REGION:  1  |NOTIFICATION DATE: 02/28/2001|
|    UNIT:  [1] [] []                 STATE:  NH |NOTIFICATION TIME: 09:55[EST]|
|   RXTYPE: [1] W-4-LP                           |EVENT DATE:        02/27/2001|
+------------------------------------------------+EVENT TIME:        11:45[EST]|
| NRC NOTIFIED BY:  MORRISSEY                    |LAST UPDATE DATE:  02/28/2001|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |RICHARD CONTE        R1      |
|10 CFR SECTION:                                 |                             |
|HFIT 26.73               FITNESS FOR DUTY       |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| ACTUAL INTRODUCTION OF CONTRABAND INTO THE PROTECTED AREA.                   |
|                                                                              |
| Immediate compensatory measures were taken upon discovery.                   |
|                                                                              |
| Contact the HOO for additional information.                                  |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|General Information or Other                     |Event Number:   37786       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  MISSISSIPPI DIV OF RAD HEALTH        |NOTIFICATION DATE: 02/28/2001|
|LICENSEE:  GE INSPECTION SERVICES               |NOTIFICATION TIME: 12:30[EST]|
|    CITY:                           REGION:  2  |EVENT DATE:        02/28/2001|
|  COUNTY:                            STATE:  MS |EVENT TIME:        10:30[CST]|
|LICENSE#:  MS863-01              AGREEMENT:  Y  |LAST UPDATE DATE:  02/28/2001|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |STEPHEN CAHILL       R2      |
|                                                |                             |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  B. J. SMITH                  |                             |
|  HQ OPS OFFICER:  BOB STRANSKY                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|NAGR                     AGREEMENT STATE        |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| POSSIBLE OVEREXPOSURE OF RADIOGRAPHER                                        |
|                                                                              |
| The licensee notified the State of Mississippi that the TLD reading for an   |
| employee during the period of January 2001 was 14.624 rem. However, the TLD  |
| readings for the radiographer's assistants during the same period were       |
| normal, and the individual's pocket dosimeter indicated a total dose of      |
| approximately 350 mrem during the period. The licensee's RSO is              |
| investigating this event.                                                    |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37787       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: DIABLO CANYON            REGION:  4  |NOTIFICATION DATE: 02/28/2001|
|    UNIT:  [1] [2] []                STATE:  CA |NOTIFICATION TIME: 14:40[EST]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        02/28/2001|
+------------------------------------------------+EVENT TIME:             [PST]|
| NRC NOTIFIED BY:  STEVEN DAVID                 |LAST UPDATE DATE:  02/28/2001|
|  HQ OPS OFFICER:  BOB STRANSKY                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |LINDA HOWELL         R4      |
|10 CFR SECTION:                                 |                             |
|*PRE 50.72(b)(2)(xi)     OFFSITE NOTIFICATION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| OFFSITE NOTIFICATION DUE TO DISCOVERY OF THREATENED SPECIES ONSITE           |
|                                                                              |
| The licensee notified the National Marine Fisheries Service that a live      |
| green sea turtle was discovered in the plant intake structure. The turtle    |
| was released into the Pacific Ocean. The NRC resident inspector has been     |
| informed of this event by the licensee.                                      |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37788       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SUMMER                   REGION:  2  |NOTIFICATION DATE: 02/28/2001|
|    UNIT:  [1] [] []                 STATE:  SC |NOTIFICATION TIME: 14:42[EST]|
|   RXTYPE: [1] W-3-LP                           |EVENT DATE:        01/12/2001|
+------------------------------------------------+EVENT TIME:        12:08[EST]|
| NRC NOTIFIED BY:  KELLEY MARSH                 |LAST UPDATE DATE:  02/28/2001|
|  HQ OPS OFFICER:  LEIGH TROCINE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |STEPHEN CAHILL       R2      |
|10 CFR SECTION:                                 |VERN HODGE           NRR     |
|CCCC 21.21               UNSPECIFIED PARAGRAPH  |RICHARD CONTE        R1      |
|                                                |ANTON VEGEL          R3      |
|                                                |LINDA HOWELL         R4      |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          N       0        Refueling        |0        Startup          |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| 10 CFR  PART 21 REPORT REGARDING A SUBSTANTIAL SAFETY HAZARD WITH A WOODWARD |
| GOVERNOR EGB UNIT                                                            |
|                                                                              |
| The following text is a portion of a facsimile received from the licensee:   |
|                                                                              |
| "On 1/12/01, V. C. Summer Nuclear Station (VCSNS) determined that a          |
| Substantial Safety Hazard could exist with Woodward governor EGB units       |
| failing to properly control the Emergency Diesel Generator [(EDG)].  A       |
| condition report (received on 1/12/01) from B. F. Goodrich/Fairbanks Morse   |
| indicated there was binding of the terminal shaft internal to an EGB unit    |
| removed from the 'A' EDG at VCSNS.  The disassembly inspection found that    |
| the binding of the terminal shaft was due to the use of clamping screws,     |
| which were 1/8 inch longer than specification, resulting in binding on the   |
| output servo piston connecting rod.                                          |
|                                                                              |
| "This error was made during the prior refurbishment of the EGB by Engine     |
| Systems Inc. (ESI), the Woodward Governor nuclear representative, on         |
| 2/24/00.  The use of the longer screws resulting in binding in the unit is   |
| considered a defect, which was introduced during the repair process by ESI.  |
|                                                                              |
| "[VCSNS] utilizes these EGB units on both the 'A' and 'B' EDGs.  The above   |
| condition produced severe frequency oscillations on the output of the 'A'    |
| EDG.  This condition could have been introduced to any EGB during            |
| refurbishment by ESI, passed acceptance testing, and be present on both      |
| EDGs.  In an emergency condition, both EDGs could fail, resulting in the     |
| loss of safety function for the emergency on-site power supply.              |
|                                                                              |
| "The EGB units currently installed on both EDGs have been refurbished by     |
| Fairbanks Morse with properly specified parts.  Fairbanks Morse will perform |
| all future EGB refurbishment work for VCSNS.  Other cause and corrective     |
| actions associated with the governor issues are being addressed under Root   |
| Cause Analysis report RCA 01-0235, 'Diesel Generator 'A' Governor Problems.' |
| "                                                                            |
|                                                                              |
| The licensee notified the NRC resident inspector.                            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37789       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: COLUMBIA GENERATING STATIREGION:  4  |NOTIFICATION DATE: 02/28/2001|
|    UNIT:  [2] [] []                 STATE:  WA |NOTIFICATION TIME: 15:13[EST]|
|   RXTYPE: [2] GE-5                             |EVENT DATE:        02/28/2001|
+------------------------------------------------+EVENT TIME:        10:57[PST]|
| NRC NOTIFIED BY:  MIKE KELLER                  |LAST UPDATE DATE:  02/28/2001|
|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |LINDA HOWELL         R4      |
|10 CFR SECTION:                                 |CHARLES MILLER       IRO     |
|NINF                     INFORMATION ONLY       |ED GOODWIN           NRR     |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| EARTHQUAKE FELT ONSITE                                                       |
|                                                                              |
| At 1057PST an earthquake in Western Washington State with a magnitude of 7.0 |
| was felt onsite.  The epicenter  is located 11.3 miles NE of Olympia, WA and |
| 14.9 miles West South West of Tacoma, WA.  The depth of the earthquake was   |
| 30 miles.   Seismic sensors did not detect the seismic activity. Plant       |
| inspection performed after the earthquake found no abnormal conditions.      |
|                                                                              |
| The NRC Resident Inspector was notified of this information call by the      |
| licensee.                                                                    |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37791       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SUMMER                   REGION:  2  |NOTIFICATION DATE: 03/01/2001|
|    UNIT:  [1] [] []                 STATE:  SC |NOTIFICATION TIME: 03:19[EST]|
|   RXTYPE: [1] W-3-LP                           |EVENT DATE:        03/01/2001|
+------------------------------------------------+EVENT TIME:        00:17[EST]|
| NRC NOTIFIED BY:  SIMPSON                      |LAST UPDATE DATE:  03/01/2001|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |STEPHEN CAHILL       R2      |
|10 CFR SECTION:                                 |                             |
|*RPS 50.72(b)(2)(iv)(B)  RPS ACTUATION - CRITICA|                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     M/R        Y       1        Startup          |0        Hot Standby      |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| REACTOR WAS MANUALLY TRIPPED AT LESS THAN 1% POWER                           |
|                                                                              |
|                                                                              |
| A manual reactor trip was initiated at 0017 on 3/01/01 due to 2 shutdown     |
| control rods remaining on the bottom while initiating control rod            |
| withdrawal.  This occurred during low power physics testing and a trouble    |
| shooting plan for a misaligned Shutdown bank B Control rod (G-9).  The rod   |
| had already been realigned to the other rods in shutdown bank B @ 43 steps.  |
| The Shutdown bank was inserted into the core to zero steps per the trouble   |
| shooting plan.   After the step counters and rod control were reset and      |
| Shutdown bank B rods were being withdrawn, it was discovered that 2 rods had |
| not moved and were still on the bottom with 14 steps demanded. The Shutdown  |
| bank was re-inserted to zero steps (fully inserted).   After further         |
| discussion, the shift supervisor called for a manual reactor trip.  The      |
| reactor operator tripped the Reactor and the Crew entered the Emergency      |
| Operation Procedures  (EOP-1.0, Reactor trip/safety injection, and EOP-1.1,  |
| Reactor trip recovery).   All systems functioned as designed.  The problem   |
| with the rod control system is not understood and trouble shooting is        |
| continuing.                                                                  |
|                                                                              |
|                                                                              |
| Note: The 2 rods that did not move were rods G-9 and L-5, both in Shutdown   |
| bank B.                                                                      |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37792       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: INDIAN POINT             REGION:  1  |NOTIFICATION DATE: 03/01/2001|
|    UNIT:  [2] [] []                 STATE:  NY |NOTIFICATION TIME: 05:42[EST]|
|   RXTYPE: [2] W-4-LP,[3] W-4-LP                |EVENT DATE:        03/01/2001|
+------------------------------------------------+EVENT TIME:        05:00[EST]|
| NRC NOTIFIED BY:  KICH                         |LAST UPDATE DATE:  03/01/2001|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |RICHARD CONTE        R1      |
|10 CFR SECTION:                                 |                             |
|*PRE 50.72(b)(2)(xi)     OFFSITE NOTIFICATION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| THE LICENSEE NOTIFIED STATE AND COUNTY OFFICIALS OF A TRANSIT STRIKE IN      |
| WESTCHESTER COUNTY.                                                          |
|                                                                              |
| The licensee was notified that transit employees of the Liberty Bus Company  |
| in Westchester County will be going on strike.  The licensee made the        |
| offsite notifications to assure that the contingency plans are in effect to  |
| deal with the strike.                                                        |
|                                                                              |
| The NRC Resident Inspector will be notified.                                 |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37793       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: INDIAN POINT             REGION:  1  |NOTIFICATION DATE: 03/01/2001|
|    UNIT:  [] [3] []                 STATE:  NY |NOTIFICATION TIME: 06:33[EST]|
|   RXTYPE: [2] W-4-LP,[3] W-4-LP                |EVENT DATE:        03/01/2001|
+------------------------------------------------+EVENT TIME:        05:00[EST]|
| NRC NOTIFIED BY:  YOUNG                        |LAST UPDATE DATE:  03/01/2001|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |RICHARD CONTE        R1      |
|10 CFR SECTION:                                 |                             |
|*PRE 50.72(b)(2)(xi)     OFFSITE NOTIFICATION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|3     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| THE LICENSEE NOTIFIED STATE AND COUNTY OFFICIALS OF A TRANSIT STRIKE IN      |
| WESTCHESTER COUNTY.                                                          |
|                                                                              |
| The  licensee was notified that transit employees of the Liberty Bus Company |
| in Westchester County will be going on strike.  The licensee made the        |
| offsite notifications to assure that the contingency plans are in effect to  |
| deal with the strike.                                                        |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
+------------------------------------------------------------------------------+


Page Last Reviewed/Updated Thursday, March 25, 2021