Event Notification Report for February 28, 2001
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 02/27/2001 - 02/28/2001 ** EVENT NUMBERS ** 37784 +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 37784 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: SALEM REGION: 1 |NOTIFICATION DATE: 02/27/2001| | UNIT: [] [2] [] STATE: NJ |NOTIFICATION TIME: 23:38[EST]| | RXTYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 02/27/2001| +------------------------------------------------+EVENT TIME: 19:15[EST]| | NRC NOTIFIED BY: 3 |LAST UPDATE DATE: 02/27/2001| | HQ OPS OFFICER: BOB STRANSKY +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |RICHARD CONTE R1 | |10 CFR SECTION: | | |NONR OTHER UNSPEC REQMNT | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | |2 N Y 100 Power Operation |100 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | 24 HOUR REPORT REQUIRED BY PLANT OPERATING LICENSE | | | | "This notification is being made to report a violation of the Salem Unit 2 | | Operating Licensee Section 2.C.10, 'Fire Protection.' Approximately 95% of | | the installed emergency lights on Unit 2 have been rendered inoperable as a | | result of discharge testing. Per the Fire Protection Program, these lights | | being inoperable would require that suitable hand held lighting be available | | to operators required to perform Appendix 'R' shutdown activities. These | | lights were checked and of the 16 lights(8 per Unit) 8 did not pass the | | required 3 minute test(at 1915). This constituted a violation of the fire | | protection program requirements and could have reduced operators ability to | | respond to a shut-down from outside the control room. The 8 inoperable | | hand held lights have been replaced with operable hand held lights, bring | | the unit into compliance with the Fire Protection Program at 2020 on | | 2/27/01." | | | | The NRC Resident Inspector was notified. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021