Event Notification Report for February 5, 2001
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 02/02/2001 - 02/05/2001 ** EVENT NUMBERS ** 37710 37711 37712 37713 37714 37715 37716 +------------------------------------------------------------------------------+ |Other Nuclear Material |Event Number: 37710 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: U.S. ARMY |NOTIFICATION DATE: 02/02/2001| |LICENSEE: U.S. ARMY |NOTIFICATION TIME: 11:13[EST]| | CITY: ROCK ISLAND REGION: 3 |EVENT DATE: 12/03/2000| | COUNTY: STATE: IL |EVENT TIME: [CST]| |LICENSE#: 12-00722-06 AGREEMENT: Y |LAST UPDATE DATE: 02/02/2001| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |DAVID HILLS R3 | | |BLAIR SPITZBERG R4 | +------------------------------------------------+BRIAN SMITH NMSS | | NRC NOTIFIED BY: JEFF HAVENNER | | | HQ OPS OFFICER: STEVE SANDIN | | +------------------------------------------------+ | |EMERGENCY CLASS: N/A | | |10 CFR SECTION: | | |BAB1 20.2201(a)(1)(i) LOST/STOLEN LNM>1000X | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | MISSING M67 MORTAR SIGHT DEVICE | | | | The licensee reported that an M67 Mortar Sight Device was lost in December | | 2000 at Ft. Polk, LA during a training exercise for the 2nd Armored Cavalry. | | The device contains multiple Tritium sources with an aggregate activity of | | 5.8 Curies. The licensee does not believe the device was inadvertently sent | | to the landfill, however, there are no specific plans to attempt recovery. | | The training area is restricted and inaccessible to the general public. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Fuel Cycle Facility |Event Number: 37711 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: PADUCAH GASEOUS DIFFUSION PLANT |NOTIFICATION DATE: 02/03/2001| | RXTYPE: URANIUM ENRICHMENT FACILITY |NOTIFICATION TIME: 01:50[EST]| | COMMENTS: 2 DEMOCRACY CENTER |EVENT DATE: 02/02/2001| | 6903 ROCKLEDGE DRIVE |EVENT TIME: 10:30[CST]| | BETHESDA, MD 20817 (301)564-3200 |LAST UPDATE DATE: 02/03/2001| | CITY: PADUCAH REGION: 3 +-----------------------------+ | COUNTY: McCRACKEN STATE: KY |PERSON ORGANIZATION | |LICENSE#: GDP-1 AGREEMENT: Y |DAVID HILLS R3 | | DOCKET: 0707001 |M. WAYNE HODGES NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: MIKE UNDERWOOD | | | HQ OPS OFFICER: BOB STRANSKY | | +------------------------------------------------+ | |EMERGENCY CLASS: N/A | | |10 CFR SECTION: | | |OCBA 76.120(c)(2) SAFETY EQUIPMENT FAILUR| | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | TWO CRITICALITY ALARM HORNS FAILED TO SOUND DURING TESTING | | | | "At 1030 on 2-2-01 the PSS was informed that the two Criticality Accident | | Alarm System (CAAS) pneumatic horns for building C-337-A failed to sound | | properly during testing. The system is required to be operable according to | | TSR 2.4.4.3.b for the prescribed modes of operation. Even though the system | | was declared inoperable at the time of the failure it is possible that the | | system would not have performed its intended safety function had it been | | required prior to being declared inoperable. The two horns were replaced and | | satisfactorily tested. | | | | "This event is reportable under 10 CFR 76.120(c)(2) as an event in which | | equipment required by the TSR is disabled or fails to function as | | designed." | | | | The NRC resident inspector has been informed of this event. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 37712 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: MILLSTONE REGION: 1 |NOTIFICATION DATE: 02/03/2001| | UNIT: [] [] [3] STATE: CT |NOTIFICATION TIME: 03:51[EST]| | RXTYPE: [1] GE-3,[2] CE,[3] W-4-LP |EVENT DATE: 02/03/2001| +------------------------------------------------+EVENT TIME: 03:40[EST]| | NRC NOTIFIED BY: RAY MARTIN |LAST UPDATE DATE: 02/03/2001| | HQ OPS OFFICER: BOB STRANSKY +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |DANIEL HOLODY R1 | |10 CFR SECTION: | | |*PRE 50.72(b)(2)(xi) OFFSITE NOTIFICATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | | | | |3 N Y 0 Startup |0 Hot Standby | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | OFFSITE NOTIFICATION | | | | The licensee contacted offsite government agencies to inform them that the | | unit commenced a refueling outage. The NRC resident inspector has been | | informed. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 37713 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: SAN ONOFRE REGION: 4 |NOTIFICATION DATE: 02/03/2001| | UNIT: [] [] [3] STATE: CA |NOTIFICATION TIME: 18:47[EST]| | RXTYPE: [1] W-3-LP,[2] CE,[3] CE |EVENT DATE: 02/03/2001| +------------------------------------------------+EVENT TIME: 15:27[PST]| | NRC NOTIFIED BY: BOB CONOSCENTI |LAST UPDATE DATE: 02/04/2001| | HQ OPS OFFICER: FANGIE JONES +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: UNU |BLAIR SPITZBERG R4 | |10 CFR SECTION: |RICHARD WESSMAN NRR | |*AEC 50.72(a) (1) (i) EMERGENCY DECLARED |CHARLES MILLER IRO | | |GENE NUPP FEMA | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | | | | |3 A/R Y 39 Power Operation |0 Hot Standby | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | UNUSUAL EVENT DECLARED DUE TO FIRE LASTING MORE THAN 15 MINUTES | | | | The plant was in the process of raising power after exiting shutdown | | operations and were at 39% power when a non-class 1E breaker failed at 1514 | | PST causing a loss of power to a non-safety electrical bus. This in turn | | caused the loss of some secondary plant equipment which led to the loss of | | condenser vacuum, condensate pumps, feedwater pumps, and other equipment | | leading to a trip of the plant. The breaker failure resulted in a fire | | which lasted until 1544 PST and the Unusual Event was declared at 1527 PST. | | The plant also lost all the control room annunciators for a period of time, | | they have been recovered. The plant is stable in Hot Standby with the | | reactor coolant pumps running, auxiliary feedwater supplying the steam | | generators, and excess heat being released through the steam generator | | atmospheric dumps. The main steam isolation valves are closed as a result | | of the secondary equipment that was lost. The emergency diesel generators | | were running unloaded on automatic start signal from the loss of the | | non-class 1E bus. Electrical power continues to be provided to all safety | | busses and the unaffected parts of the non-safety busses from offsite | | power. | | | | The licensee notified the NRC Resident Inspector and state and local | | authorities. | | | | * * * UPDATE AT 1956 EST ON 02/03/01 BY BOB CONOSCENTI TO FANGIE JONES * * | | * | | | | The licensee has determined that one breaker failed catastrophically causing | | the loss of one 4160 VAC bus and pieces of the breaker assembly caused | | grounds in another 480 VAC bus causing its loss. The plant is stable in Hot | | Standby. The licensee notified the NRC Resident Inspector. The Unusual | | Event was terminated at 1544 PST. | | | | The R4DO (Blair Spitzberg), NRR EO (Richard Wessman), IRO Manager (Charles | | Miller), and FEMA (Gene Nupp) have been notified. | | | | * * * COMMISSIONER'S ASSISTANTS' BRIEFING 1000 2/4/2001 * * * | | | | Briefer: Charles Marshall. Participants: Mamish (IRO), Richards, Wessman | | (NRR), Dricks (OPA), Combs (STP), Hauber (OIP), Madden (OCA), Morris (EDO), | | Levin (Chrm Meserve), Cain (Comm Dicus), Sharkey (Comm McGaffigan), Davis | | (Comm Diaz), McCabe (Comm Merrifield), Brockman, Henerson, Kramer (R4). | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 37714 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: CLINTON REGION: 3 |NOTIFICATION DATE: 02/04/2001| | UNIT: [1] [] [] STATE: IL |NOTIFICATION TIME: 04:25[EST]| | RXTYPE: [1] GE-6 |EVENT DATE: 02/04/2001| +------------------------------------------------+EVENT TIME: 01:18[CST]| | NRC NOTIFIED BY: MATT BAKER |LAST UPDATE DATE: 02/04/2001| | HQ OPS OFFICER: BOB STRANSKY +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |DAVID HILLS R3 | |10 CFR SECTION: | | |ARPS 50.72(b)(2)(ii) RPS ACTUATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 A/R Y 96 Power Operation |0 Hot Shutdown | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | AUTOMATIC TURBINE TRIP/REACTOR SCRAM DURING TESTING | | | | During performance or routine turbine valve testing, an automatic turbine | | trip and subsequent reactor scram occurred due to low turbine emergency trip | | system pressure. The unit is currently stable in Condition 3 (Hot Shutdown) | | with reactor vessel water level being maintained by the motor driven | | feedwater pump and reactor pressure being controlled via the steam bypass | | valves to the main condenser. All systems functioned as expected. | | | | The NRC resident inspector has been informed of this event by the licensee. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 37715 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: POINT BEACH REGION: 3 |NOTIFICATION DATE: 02/04/2001| | UNIT: [1] [] [] STATE: WI |NOTIFICATION TIME: 14:52[EST]| | RXTYPE: [1] W-2-LP,[2] W-2-LP |EVENT DATE: 02/04/2001| +------------------------------------------------+EVENT TIME: 12:45[CST]| | NRC NOTIFIED BY: MIKE MEYER |LAST UPDATE DATE: 02/04/2001| | HQ OPS OFFICER: FANGIE JONES +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |DAVID HILLS R3 | |10 CFR SECTION: | | |*IND 50.72(b)(3)(v)(D) ACCIDENT MITIGATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 80 Power Operation |80 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | DISCOVERY OF VALVE CLOSED THAT COULD AFFECT ACCIDENT MITIGATION | | | | "While performing troubleshooting operation on the Unit 1 Crossover Steam | | Dump System an Instrument Air Valve was discovered to be closed, when it | | should have been open. This closed valve (IA-1553) isolates Instrument Air | | to the Crossover Steam Dump Valves rendering the system inoperable. This | | system is required to be operable by the FSAR Appendix T and Power must be | | <437 MWe if the system is inop. At the time of discovery power was <437 | | MWe, however initial investigation leads to the conclusion that this valve | | has probably been closed since October, 2000. Since Crossover Steam Dumps | | provide protection for a Turbine Overspeed Accident and is part of the PBNP | | Design Basis it was conservatively decided to make this 8-hour report. Unit | | 1 will remain < 437 MWe until the system is fully restored and tested. An | | investigation is continuing." | | | | The licensee notified the NRC Resident Inspector. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 37716 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: SOUTH TEXAS REGION: 4 |NOTIFICATION DATE: 02/05/2001| | UNIT: [1] [2] [] STATE: TX |NOTIFICATION TIME: 05:02[EST]| | RXTYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 02/05/2001| +------------------------------------------------+EVENT TIME: 03:15[CST]| | NRC NOTIFIED BY: STEVEN KASPAR |LAST UPDATE DATE: 02/05/2001| | HQ OPS OFFICER: BOB STRANSKY +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |BLAIR SPITZBERG R4 | |10 CFR SECTION: | | |DDDD 73.71 UNSPECIFIED PARAGRAPH | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | |2 N Y 9 Power Operation |9 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | 10 CFR 73.71(b) SECURITY REPORT | | | | Safeguards system degradation related to detection/monitoring. Immediate | | compensatory measures taken upon discovery. Contact the NRC Operations | | Center for additional details. | | | | The NRC resident inspector will be informed of this event by the licensee. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021