Event Notification Report for January 3, 2001
U.S. Nuclear Regulatory Commission
Operations Center
Event Reports For
01/02/2001 - 01/03/2001
** EVENT NUMBERS **
37642
+------------------------------------------------------------------------------+
|Power Reactor |Event Number: 37642 |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: INDIAN POINT REGION: 1 |NOTIFICATION DATE: 01/02/2001|
| UNIT: [2] [] [] STATE: NY |NOTIFICATION TIME: 22:05[EST]|
| RXTYPE: [2] W-4-LP,[3] W-4-LP |EVENT DATE: 01/02/2001|
+------------------------------------------------+EVENT TIME: 15:36[EST]|
| NRC NOTIFIED BY: PHIL SANTINI |LAST UPDATE DATE: 01/02/2001|
| HQ OPS OFFICER: FANGIE JONES +-----------------------------+
+------------------------------------------------+PERSON ORGANIZATION |
|EMERGENCY CLASS: N/A |JAMES NOGGLE R1 |
|10 CFR SECTION: | |
|AESF 50.72(b)(2)(ii) ESF ACTUATION | |
| | |
| | |
| | |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|2 N Y 6.5 Power Operation |5 Power Operation |
| | |
| | |
+------------------------------------------------------------------------------+
EVENT TEXT
+------------------------------------------------------------------------------+
| AUXILIARY FEEDWATER PUMP AUTOMATIC START |
| |
| The plant sustained a main turbine trip on steam generator high level, cause |
| under review. The turbine trip caused a main feedwater trip which caused an |
| automatic start of the 21 and 23 auxiliary feedwater pumps, as designed. |
| The licensee review of the event determined, later in the evening, that the |
| pump starts were reportable under 10 CFR 50.72(b)(2)(ii). |
| |
| The licensee notified the NRC Resident Inspector. |
+------------------------------------------------------------------------------+