Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Event Notification Report for December 29, 2000

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           12/28/2000 - 12/29/2000

                              ** EVENT NUMBERS **

37637  

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37637       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: COOPER                   REGION:  4  |NOTIFICATION DATE: 12/28/2000|
|    UNIT:  [1] [] []                 STATE:  NE |NOTIFICATION TIME: 12:21[EST]|
|   RXTYPE: [1] GE-4                             |EVENT DATE:        12/28/2000|
+------------------------------------------------+EVENT TIME:        07:41[CST]|
| NRC NOTIFIED BY:  STEVE WHEELER                |LAST UPDATE DATE:  12/28/2000|
|  HQ OPS OFFICER:  BOB STRANSKY                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |CHARLES MARSCHALL    R4      |
|10 CFR SECTION:                                 |                             |
|AESF 50.72(b)(2)(ii)     ESF ACTUATION          |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| CONTROL BUILDING VENTILATION ISOLATION                                       |
|                                                                              |
| "At 0741 CST the Control Building Emergency Filtration System automatically  |
| initiated on a Control Building Intake Gas High Activity alarm. The cause of |
| the Gas High Activity alarm is under investigation."                         |
|                                                                              |
| The NRC resident inspector has been informed of this event by the licensee.  |
|                                                                              |
| * * * UPDATE ON 12/29/00, 0024 ET BY MYERS TAKEN BY MACKINNON * * *          |
|                                                                              |
| During the day, trouble shooting was performed to determine the source of    |
| the actuation at 0741 CST today. Surveillance Procedure 6.PRM.317, CONTROL   |
| ROOM AIR SAMPLING SYSTEM ELECTRONIC CALIBRATION, was performed, and all      |
| indications were within specification.  A source check of the gaseous        |
| channel was also performed per Instrument Operating Procedure 4.17, and the  |
| response of the monitor was normal.  Air sampling was conducted, and no      |
| indications of abnormal radiation were identified.  The Control Room         |
| Emergency Filtration System was returned to the standby lineup.              |
|                                                                              |
| At 1933, the Control Room Emergency Filtration System again initiated on a   |
| high gaseous activity signal.  All equipment functioned as required.  The    |
| Control Building Ventilation Radiation Monitor has been declared inoperable, |
| and the Control Room Emergency Filtration System remains in service, aligned |
| in the accident mode.                                                        |
|                                                                              |
| Note: The Control Building Ventilation Radiation Monitor consists of three   |
| channels, with two required to be operable.  The Iodine channel is also      |
| presently inoperable.  The actuation logic requires only one channel of the  |
| three to initiate Control Room Isolation and start the Emergency Booster     |
| (pressurization) fan.                                                        |
|                                                                              |
| Noble gas sample was taken at 2142 CST.  All readings were normal.   NRC     |
| R4DO (C. Marschall) notified.                                                |
|                                                                              |
| The NRC Resident Inspector will be notified of this event by the licensee.   |
+------------------------------------------------------------------------------+