Event Notification Report for December 29, 2000
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 12/28/2000 - 12/29/2000 ** EVENT NUMBERS ** 37637 +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 37637 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: COOPER REGION: 4 |NOTIFICATION DATE: 12/28/2000| | UNIT: [1] [] [] STATE: NE |NOTIFICATION TIME: 12:21[EST]| | RXTYPE: [1] GE-4 |EVENT DATE: 12/28/2000| +------------------------------------------------+EVENT TIME: 07:41[CST]| | NRC NOTIFIED BY: STEVE WHEELER |LAST UPDATE DATE: 12/28/2000| | HQ OPS OFFICER: BOB STRANSKY +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |CHARLES MARSCHALL R4 | |10 CFR SECTION: | | |AESF 50.72(b)(2)(ii) ESF ACTUATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | CONTROL BUILDING VENTILATION ISOLATION | | | | "At 0741 CST the Control Building Emergency Filtration System automatically | | initiated on a Control Building Intake Gas High Activity alarm. The cause of | | the Gas High Activity alarm is under investigation." | | | | The NRC resident inspector has been informed of this event by the licensee. | | | | * * * UPDATE ON 12/29/00, 0024 ET BY MYERS TAKEN BY MACKINNON * * * | | | | During the day, trouble shooting was performed to determine the source of | | the actuation at 0741 CST today. Surveillance Procedure 6.PRM.317, CONTROL | | ROOM AIR SAMPLING SYSTEM ELECTRONIC CALIBRATION, was performed, and all | | indications were within specification. A source check of the gaseous | | channel was also performed per Instrument Operating Procedure 4.17, and the | | response of the monitor was normal. Air sampling was conducted, and no | | indications of abnormal radiation were identified. The Control Room | | Emergency Filtration System was returned to the standby lineup. | | | | At 1933, the Control Room Emergency Filtration System again initiated on a | | high gaseous activity signal. All equipment functioned as required. The | | Control Building Ventilation Radiation Monitor has been declared inoperable, | | and the Control Room Emergency Filtration System remains in service, aligned | | in the accident mode. | | | | Note: The Control Building Ventilation Radiation Monitor consists of three | | channels, with two required to be operable. The Iodine channel is also | | presently inoperable. The actuation logic requires only one channel of the | | three to initiate Control Room Isolation and start the Emergency Booster | | (pressurization) fan. | | | | Noble gas sample was taken at 2142 CST. All readings were normal. NRC | | R4DO (C. Marschall) notified. | | | | The NRC Resident Inspector will be notified of this event by the licensee. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021