The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for December 26, 2000

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           12/22/2000 - 12/26/2000

                              ** EVENT NUMBERS **

37630  37631  37632  

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37630       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: WOLF CREEK               REGION:  4  |NOTIFICATION DATE: 12/22/2000|
|    UNIT:  [1] [] []                 STATE:  KS |NOTIFICATION TIME: 11:29[EST]|
|   RXTYPE: [1] W-4-LP                           |EVENT DATE:        12/22/2000|
+------------------------------------------------+EVENT TIME:        09:45[CST]|
| NRC NOTIFIED BY:  RICK HUBBARD                 |LAST UPDATE DATE:  12/22/2000|
|  HQ OPS OFFICER:  DOUG WEAVER                  +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |BILL JONES           R4      |
|10 CFR SECTION:                                 |                             |
|AARC 50.72(b)(1)(v)      OTHER ASMT/COMM INOP   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| LOSS OF POWER TO THE TECHNICAL SUPPORT CENTER (TSC)                          |
|                                                                              |
| Breaker 13-40 tripped with the ground flag dropped.  This breaker supplies   |
| primary power to the TSC.  There is a backup diesel generator available to   |
| supply power to the TSC but will not be energized until it is determined     |
| that there is no ground at the TSC.  Once the TSC D/G is energized the       |
| facility will once again be available.                                       |
|                                                                              |
| The licensee notified the NRC resident inspector.                            |
|                                                                              |
| * * * Update at 1150 on 12/22/00 by Hubbard received by Weaver * * *         |
|                                                                              |
| The diesel generator is now supplying the TSC with electrical power (as of   |
| 1041 CST).  Investigation continues into why breaker 13-40 tripped.          |
|                                                                              |
| Notified the R4DO(Jones).                                                    |
+------------------------------------------------------------------------------+

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37631       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: BROWNS FERRY             REGION:  2  |NOTIFICATION DATE: 12/22/2000|
|    UNIT:  [] [2] []                 STATE:  AL |NOTIFICATION TIME: 16:54[EST]|
|   RXTYPE: [1] GE-4,[2] GE-4,[3] GE-4           |EVENT DATE:        12/22/2000|
+------------------------------------------------+EVENT TIME:        12:25[CST]|
| NRC NOTIFIED BY:  NACOSTE                      |LAST UPDATE DATE:  12/23/2000|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |MIKE ERNSTES         R2      |
|10 CFR SECTION:                                 |                             |
|AINA 50.72(b)(2)(iii)(A) POT UNABLE TO SAFE SD  |                             |
|NLCO                     TECH SPEC LCO A/S      |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| PLANT ENTERED 14 DAY LCO DUE TO HIGH PRESSURE COOLANT INJECTION BEING        |
| INOPERABLE                                                                   |
|                                                                              |
| HPCI was declared inoperable after failing testing.  During the performance  |
| of 2-SI-3.5.1.7 HPCI MAIN AND BOOSTER PUMP SET DEVELOPED HEAD AND FLOW RATE  |
| TEST AT RATED REACTOR PRESSURE, the HPCI system could not be verified to be  |
| vented.                                                                      |
|                                                                              |
| The probable reason for not being able to make this verification is due to a |
| faulty flow gauge in the HPCI piping system.                                 |
|                                                                              |
| The NRC Resident Inspector will be notified.                                 |
|                                                                              |
| * * * RETRACTED AT 0240 EST 0N 12/23/00 BY MICKEY HUNTER TO FANGIE JONES * * |
| *                                                                            |
|                                                                              |
| "The 4 hour report made in accordance with 10CFR50.72.b.2.iii at 1630 on     |
| 12/22/2000 is being retracted for the following reasons:  During the         |
| performance of 2-SR-3.5.1.7 HPCI MAIN AND BOOSTER PUMP SET DEVELOPED HEAD    |
| AND FLOW RATE TEST AT RATED REACTOR PRESSURE, there were indications of flow |
| through the vent line during initial Surveillance testing however; the test  |
| methodology used in the Surveillance could not verify that flow. We revised  |
| the Surveillance methodology to prescribe an alternate process of            |
| determining flow. The Surveillance test was reperformed satisfactorily and   |
| verified indications of flow that was observed in the previous performance   |
| of the Surveillance test. Thus this proved operability of HPCI during        |
| previous performance of Surveillance test."                                  |
|                                                                              |
| The licensee notified the NRC Resident Inspector.  The R2DO (Mike Ernstses)  |
| was notified.                                                                |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   37632       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PADUCAH GASEOUS DIFFUSION PLANT      |NOTIFICATION DATE: 12/23/2000|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 15:02[EST]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        12/23/2000|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        06:15[CST]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  12/23/2000|
|    CITY:  PADUCAH                  REGION:  3  +-----------------------------+
|  COUNTY:  McCRACKEN                 STATE:  KY |PERSON          ORGANIZATION |
|LICENSE#:  GDP-1                 AGREEMENT:  Y  |THOMAS KOZAK         R3      |
|  DOCKET:  0707001                              |JOHN HICKEY          NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  BEASLEY                      |                             |
|  HQ OPS OFFICER:  CHAUNCEY GOULD               |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|OCBB 76.120(c)(2)(ii)    EQUIP DISABLED/FAILS   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| FACILITY HAS PROBLEMS WITH FREEZING STANDPIPES THAT SUPPLY WATER TO THEIR    |
| HIGH PRESSURE FIRE WATER SYSTEMS.                                            |
|                                                                              |
| During a discussion between the Paducah and Portsmouth Plant Shift           |
| Superintendents (PSS), the Portsmouth PSS stated that their facility was     |
| having a problem with the standpipes freezing that supply water to their     |
| High Pressure Fire Water (HPFW) systems.  Following this discussion, the     |
| Paducah PSS instructed all building managers containing HPFW systems to      |
| check the temperatures of the standpipes.  Following this temperature        |
| survey, two systems in the C-337 building were discovered to have abnormally |
| low temperatures.  In order to verify operability, Fire Services personnel   |
| performed flow tests on these two systems.  During this testing, it was      |
| discovered that the standpipe for HPFW system D-2 was frozen, and the system |
| could not perform its specified safety function.  The High Pressure Fire     |
| Water System is required to be operable according to TSR 2.4.4.5. HPFW       |
| system D-2 was declared inoperable at 0615 on 12-23-00, and a fire patrol    |
| was initiated as required by the TSR.  During follow up investigation, it    |
| was discovered that six of the eight exhaust fans and a section of           |
| recirculating louvers that supply heat to this area were not functioning.    |
|                                                                              |
|                                                                              |
| The NRC Resident Inspector has been notified of this event.                  |
+------------------------------------------------------------------------------+
