The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for December 12, 2000

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           12/11/2000 - 12/12/2000

                              ** EVENT NUMBERS **

37581  37585  37586  37587  

+------------------------------------------------------------------------------+
|Other Nuclear Material                           |Event Number:   37581       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  TRU-TEC SERVICES, INC.               |NOTIFICATION DATE: 12/08/2000|
|LICENSEE:  TRU-TEC SERVICES, INC.               |NOTIFICATION TIME: 18:47[EST]|
|    CITY:  LA PORTE                 REGION:  4  |EVENT DATE:        12/08/2000|
|  COUNTY:  HARRIS                    STATE:  TX |EVENT TIME:        03:30[CST]|
|LICENSE#:  07-28386-01           AGREEMENT:  Y  |LAST UPDATE DATE:  12/11/2000|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |BLAIR SPITZBERG      R4      |
|                                                |PAUL FREDRICKSON     R2      |
+------------------------------------------------+THOMAS ESSIG         NMSS    |
| NRC NOTIFIED BY:  NORMAN LANIER                |CHARLES MILLER       IRO     |
|  HQ OPS OFFICER:  LEIGH TROCINE                |JOHN ROGGE           R1      |
+------------------------------------------------+STAMBAUGH            DOE     |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|NONR                     OTHER UNSPEC REQMNT    |                             |
|NTRA                     TRANSPORTATION EVENT   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| RECEIPT OF A TRU-TEC SERVICES, INC., CONTAINER OF BROMINE-82 THAT APPEARED   |
| TO HAVE BEEN OPENED AND RE-PACKAGED INCORRECTLY DURING TRANSPORT BETWEEN     |
| TEXAS A&M AND ST. CROIX IN THE VIRGIN ISLANDS                                |
|                                                                              |
| On 12/04/00, Tru-Tec Services, Inc., shipped an empty container from their   |
| facility in La Porte, Texas, to Texas A&M via Acme Trucking.  The container  |
| was similar in shape to a propane tank (but taller).  It was lead filled and |
| weighed between 700 and 750 pounds.  It also had a 3-inch by 3-inch cavity   |
| inside and a lid with a T-bar to hold the lid in place.  Texas A&M loaded    |
| the empty container with bromine-82, and the activity of the bromine-82 at   |
| noon on 12/04/00 was 900 millicuries.  The bromine-82 was double             |
| encapsulated (inside three glass ampoules which were also inside a metal     |
| swagelock container with a screw on cap).  After Texas A&M loaded the        |
| container, Acme Trucking transported the container to Federal Express at     |
| Intercontinental Airport in Houston, Texas, on 12/04/00.  Apparently, the    |
| container arrived at a Federal Express hub in Memphis, Tennessee, on         |
| 12/05/00, and it remained there until 12/07/00.  On 12/07/00, the shipment   |
| left Memphis, Tennessee, via Federal Express and arrived in Puerto Rico on   |
| the morning of 12/08/00.  It was then transported by 4 Star Air Cargo to St. |
| Croix in the Virgin Islands.  Tru-Tec Services, Inc., received the container |
| between approximately 1600 and 1630 EST on 12/08/00.                         |
|                                                                              |
| Upon arrival in St. Croix, Tru-Tec personnel discovered a problem with the   |
| container.  It appeared that the container had been opened and put back      |
| together incorrectly.  The container's T-bar was missing, and the lid was    |
| upside-down with the bromine-82 on the outside of the container rather than  |
| shielded on the inside of the container.  The bromine-82 appeared to be      |
| intact.  Smear tests were performed using a GM detector, and there was no    |
| evidence of contamination or of a breech in the double encapsulated          |
| material.  Survey readings with the bromine-82 unshielded on the outside of  |
| the package resulted a dose rate of 6 millirem per hour at a distance of 6   |
| feet.  The bromine-82 is currently under control and in the possession of    |
| the Tru-Tec Services, Inc.                                                   |
|                                                                              |
| The bromine-82 was intended for use in tracer studies at chemical plants,    |
| and it was manufactured at Texas A&M.  It was reported that the half life of |
| bromine-82 is 35 hours, and the estimated activity of the material at noon   |
| on 12/08/00 would have been 140 millicuries.  bromine-82 is a strong gamma   |
| emitter.  The Tru-Tec Services, Inc. main office is located in Delaware.     |
|                                                                              |
| The licensee plans to contact the carriers and plans to attempt to trace its |
| path and discover who came into contact with the container.                  |
|                                                                              |
| (Call the NRC operations officer for licensee contact information.)          |
|                                                                              |
| * * *  UPDATE ON 12/11/00 @ 1140 BY BRIAN SMITH(NMSS) TO GOULD  * * *        |
|                                                                              |
| Correction of the dose rate from 6 millirem per hour to 60 millirem per hour |
| at a distance of 6 ft.                                                       |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37585       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: BEAVER VALLEY            REGION:  1  |NOTIFICATION DATE: 12/11/2000|
|    UNIT:  [] [2] []                 STATE:  PA |NOTIFICATION TIME: 04:42[EST]|
|   RXTYPE: [1] W-3-LP,[2] W-3-LP                |EVENT DATE:        12/11/2000|
+------------------------------------------------+EVENT TIME:        04:05[EST]|
| NRC NOTIFIED BY:  THOMAS                       |LAST UPDATE DATE:  12/11/2000|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          UNU                   |JOHN ROGGE           R1      |
|10 CFR SECTION:                                 |                             |
|ASHU 50.72(b)(1)(i)(A)   PLANT S/D REQD BY TS   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     N          Y       100      Power Operation  |50       Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| PLANT ENTERED TECHNICAL SPECIFICATION REQUIRED SHUTDOWN PRIMARY LEAK         |
| EXCEEDING ALLOWABLE VALUES.                                                  |
|                                                                              |
| At 0320 Unit 2 received indications of a primary leak in containment that    |
| exceeded allowable values in Tech Spec 3.4.6.2. These indications included   |
| containment gas activity alert alarm, Pressurizer level reduction,           |
| Pressurizer spray valve closure and an increase in charging flow. Indicated  |
| charging/letdown mismatch is 7 gpm.  Calculated primary leak rate estimate   |
| based on VCT and Pressurizer level changes was 9.5 gpm at 0400. At 0412 Unit |
| 2 began a plant shutdown at 2% per minute.  This constitutes the initiation  |
| of a plant shutdown required by Tech Specs.  A containment entry is planned  |
| to identify the source of the leak. The entry will be made after the reactor |
| is subcritical.                                                              |
|                                                                              |
| The NRC Resident Inspector will be notified.                                 |
|                                                                              |
|                                                                              |
| * * *  UPDATE ON 12/20/00 @ 0603 BY THOMAS TO GOULD  * * *                   |
|                                                                              |
| Update at 0543: Estimated RCS leak rate based on charging/letdown mismatch   |
| exceeds 10 gpm. An Unusual Event was declared at 0536 due to Unidentified    |
| Leakage exceeding 10 gpm. Current leak rate estimate is between 12 and 20    |
| gpm.  Plant is currently at 22% power.                                       |
|                                                                              |
| The NRC Resident Inspector was notified.   FEMA(Bagwell), RDO(Rogge),        |
| EO(Zwolinski), and IRO(Miller)                                               |
|                                                                              |
| * * * UPDATE ON 12/11/00 @ 0825 * * *                                        |
|                                                                              |
| NRC entered monitoring mode at 0825.                                         |
|                                                                              |
|                                                                              |
| * * * UPDATE ON 12/11/00 @ 1412 PER  RICK HASSELBERG * * *                   |
|                                                                              |
| The plant entered cold shutdown at 1357 and exited the unusual event at      |
| 1405.  The leak rate has been reduced to 5 gpm.  The NRC exited monitoring   |
| mode at 1412.   FEMA (Canupp), R1DO (White) and NRR EO (Tappert) notified.   |
+------------------------------------------------------------------------------+

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37586       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SAN ONOFRE               REGION:  4  |NOTIFICATION DATE: 12/11/2000|
|    UNIT:  [1] [2] []                STATE:  CA |NOTIFICATION TIME: 10:55[EST]|
|   RXTYPE: [1] W-3-LP,[2] CE,[3] CE             |EVENT DATE:        12/11/2000|
+------------------------------------------------+EVENT TIME:        06:55[PST]|
| NRC NOTIFIED BY:  TODD COOK                    |LAST UPDATE DATE:  12/11/2000|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |CHUCK CAIN           R4      |
|10 CFR SECTION:                                 |                             |
|DDDD 73.71               UNSPECIFIED PARAGRAPH  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| SAFEGUARDS SYSTEM DEGRADATION RELATED TO MONITORING PROTECTED AREA BOUNDARY. |
| IMMEDIATE COMPENSATORY MEASURES TAKEN UPON DISCOVERY.  THE LICENSEE WILL     |
| INFORM THE NRC RESIDENT INSPECTOR.  CONTACT THE HEADQUARTERS OPERATIONS      |
| OFFICER FOR ADDITIONAL DETAILS.                                              |
|                                                                              |
| * * * UPDATE AT 1543 ON 12/11/00 AT 1543 BY PLUMLEE, RECEIVED BY WEAVER * *  |
| *                                                                            |
|                                                                              |
| The licensee requested this event be retracted.  The event is an example     |
| listed in Generic Letter 91-03 as a loggable event and hence should not have |
| been reported.  The licensee will notify the NRC resident inspector.  The    |
| Operations Officer notified the R4DO (Cain).                                 |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|General Information or Other                     |Event Number:   37587       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  WA DIVISION OF RADIATION PROTECTION  |NOTIFICATION DATE: 12/11/2000|
|LICENSEE:  TRANSALTA CENTRALIA MINING LLC       |NOTIFICATION TIME: 19:00[EST]|
|    CITY:  CENTRALIA                REGION:  4  |EVENT DATE:        11/21/2000|
|  COUNTY:                            STATE:  WA |EVENT TIME:        12:00[PST]|
|LICENSE#:  WN-I0241-1            AGREEMENT:  Y  |LAST UPDATE DATE:  12/11/2000|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |CHUCK CAIN           R4      |
|                                                |THOMAS ESSIG         NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  TERRY FRAZEE                 |                             |
|  HQ OPS OFFICER:  DOUG WEAVER                  |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|NAGR                     AGREEMENT STATE        |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| AGREEMENT STATE REPORT                                                       |
|                                                                              |
| This is notification of an event in Washington state as reported to the WA   |
| Department of                                                                |
|                                                                              |
| Health Division of Radiation Protection.                                     |
|                                                                              |
| STATUS: new (related to events #WA-00-054 and #WA-00-046)                    |
|                                                                              |
| Licensee: Transalta Centralia Mining LLC                                     |
| City and state: Centralia, WA                                                |
| License number: WN-I0241-1                                                   |
| Type of license: Fixed Gauge                                                 |
|                                                                              |
| Date of event: November 21 & 23, 2000 Location of Event; Centralia, WA       |
| ABSTRACT: (where, when, how, why; cause. contributing factors, corrective    |
| actions, consequences, DOH on-site investigation; media attention) The       |
| licensee notified the WA Department of Health, Division of Radiation         |
| Protection, that replacement rods (installed after source rod failures       |
| documented in Washington event reports #WA-00-046 and WA-00-054) had failed  |
| on November 21 and November 22.                                              |
|                                                                              |
| As reported previously, the Ronan Engineering Company Model SA-4 gauging     |
| device (containing up to 74 gigabecquerels of cesium-137 in an Amersham      |
| Model CDC.711M source) is operated by lowering the source at the end of an   |
| approximately six foot source rod into a dry well. The gauge is removed from |
| service by pulling up on the source rod until the source enters the shielded |
| body of the gauge. The source rod was originally constructed in several      |
| screw-together  sections. Failure number 1 (September 13) was the apparent   |
| result of mechanical vibration loosening the upper screw joint until it came |
| apart as the source rod was being lifted. Failure number 2 (October 5) was   |
| presumed to be metal fatigue in that the male threaded portion of the lower  |
| screw joint snapped off from the rod as it was being lifted. Since an exact  |
| replacement rod was no longer available from Ronan, the actual replacement   |
| consisted of two rod sections connected at each joint by a spring-loaded     |
| brass pin and a short manufactured adapter that was tooled for the pin       |
| connector at one end and a threaded male connector at the other.             |
|                                                                              |
| Failure number 3 (November 21) and failure number 4 (November 23) also       |
| occurred while lifting the source rod. In both instances, the lower          |
| pin-connected joint failed apparently as a result of the increased tension   |
| as the source enters the shield overcoming the spring tension on the brass   |
| pin, thus  'popping' the connector loose. After the second failure of this   |
| type, the gauge was taken out of service and the manufacturer requested to   |
| provide an exact replacement rod. The  'old style'  screw-together sections  |
| were installed December 7. The  'new'  pin-connected rods provided for the   |
| other three gauges had not been installed because no problems had occurred.  |
| The licensee plans to replace all four gauges by the end of 2001 when new    |
| process equipment is installed.                                              |
+------------------------------------------------------------------------------+


Page Last Reviewed/Updated Thursday, March 25, 2021