Event Notification Report for September 8, 2000
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 09/07/2000 - 09/08/2000 ** EVENT NUMBERS ** 37266 37297 37298 !!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!!!! +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 37266 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: NINE MILE POINT REGION: 1 |NOTIFICATION DATE: 08/28/2000| | UNIT: [] [2] [] STATE: NY |NOTIFICATION TIME: 20:17[EDT]| | RXTYPE: [1] GE-2,[2] GE-5 |EVENT DATE: 08/28/2000| +------------------------------------------------+EVENT TIME: 16:30[EDT]| | NRC NOTIFIED BY: RICHARD LANGE |LAST UPDATE DATE: 09/08/2000| | HQ OPS OFFICER: LEIGH TROCINE +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |PETE ESELGROTH R1 | |10 CFR SECTION: | | |AIND 50.72(b)(2)(iii)(D) ACCIDENT MITIGATION | | |NLCO TECH SPEC LCO A/S | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | |2 N Y 100 Power Operation |100 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | INOPERABILITY OF THE PASS AND BOTH DIVISION I/II H2O2 MONITORING SYSTEMS | | | | The following text is a portion of a facsimile received from the licensee: | | | | "On 8/28/2000, at 1630, [the Division] I and [II] Hydrogen/Oxygen (H2O2) | | Containment Monitoring Systems were declared inoperable. The Division I | | system was declared inoperable on 8/28/2000, at 0818, for planned | | maintenance. Subsequently, the Division II system was declared inoperable | | due to a failed channel check." | | | | "In addition, the Post Accident Sampling System (PASS) was previously | | declared inoperable. With the PASS and both Division I/II H2O2 Monitoring | | Systems inoperable, this event is reportable in accordance with 10 CFR | | 50.72(b)(2)(iii)(D)." | | | | "Also, on 8/28/2000, at 1905, the Division I H2O2 Monitor was restored to | | operable [status] following completion of planned maintenance." | | | | The licensee stated that the unit remained in a 30-day limiting condition | | for operation (LCO) and that a 7-day shutdown LCO was exited when the | | Division I H2O2 Monitor was restored to operable status. | | | | The licensee notified the NRC resident inspector. | | | | ***** UPDATE/RETRACTION AT 0024 ON 09/08/00 FROM ANTHONY PETRELLI TO LEIGH | | TROCINE ***** | | | | The licensee is retracting this event notification. The following text is a | | portion of a facsimile received from the licensee: | | | | "On 08/28/00, 1630 EDT, Nine Mile Point Unit 2 reported that Divisions 1 and | | 2 of the Hydrogen/Oxygen (H2/02) Containment Monitoring Systems were | | declared inoperable under Event Number 37266." | | | | "[The licensee is] retracting that notification based on the fact that the | | Division 1 H2/O2 monitoring system was removed from service as part of | | planned maintenance in accordance with approved procedures and plant | | Technical [Specifications]. During planned maintenance, a discrepancy was | | found in the Division 1 H2/O2 system. Subsequent evaluation indicated that | | the condition discovered would not have prevented the system from performing | | its safety function if called upon. Therefore, this event is not | | reportable." | | | | The licensee notified the NRC resident inspector. The NRC operations | | officer notified the R1DO (Dimitriadis). | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 37297 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: NORTH ANNA REGION: 2 |NOTIFICATION DATE: 09/07/2000| | UNIT: [1] [] [] STATE: VA |NOTIFICATION TIME: 10:01[EDT]| | RXTYPE: [1] W-3-LP,[2] W-3-LP |EVENT DATE: 09/07/2000| +------------------------------------------------+EVENT TIME: 09:58[EDT]| | NRC NOTIFIED BY: KEVIN DeVOR |LAST UPDATE DATE: 09/07/2000| | HQ OPS OFFICER: LEIGH TROCINE +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |MARK LESSER R2 | |10 CFR SECTION: | | |AESS 50.72(b)(1)(v) EMERGENCY SIREN INOP | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | EMERGENCY SIREN OUTAGE DUE TO A PLANNED ACTIVATION ANTENNA UPGRADE | | | | The following text is a portion of a facsimile received from the licensee: | | | | "The sirens covering the North Anna Power Station will be taken out of | | service for a planned upgrade to the siren activation antenna. This will | | occur between the hours of 1000 and 1300. Total outage time is | | approximately 15 minutes." | | | | "Nuclear Emergency Preparedness [personnel have] notified the Virginia | | Department of Emergency Management. Just prior to the outage, the State | | [Emergency Operations Center will notify the [five] local jurisdictions. | | They will also notify these jurisdictions in the [Emergency Planning Zone] | | when the system is returned [to] operable [status]." | | | | The licensee plans to notify the NRC resident inspector. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Other Nuclear Material |Event Number: 37298 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: SOUTHEAST MISSOURI STATE UNIVERSITY |NOTIFICATION DATE: 09/07/2000| |LICENSEE: SOUTHEAST MISSOURI STATE UNIVERSITY |NOTIFICATION TIME: 10:04[EDT]| | CITY: CAPE GIRARDEAU REGION: 3 |EVENT DATE: 06/12/2000| | COUNTY: CAPE GIRARDEAU STATE: MO |EVENT TIME: [CDT]| |LICENSE#: AGREEMENT: N |LAST UPDATE DATE: 09/07/2000| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |GARY SHEAR R3 | | |DON COOL NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: CHRIS McGOWAN | | | HQ OPS OFFICER: LEIGH TROCINE | | +------------------------------------------------+ | |EMERGENCY CLASS: N/A | | |10 CFR SECTION: | | |BAD1 20.2202(a)(1) PERS OVEREXPOSURE | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | POTENTIAL PERSONNEL OVEREXPOSURE OF A CONTRACT EMPLOYEE AT SOUTHEAST | | MISSOURI STATE UNIVERSITY IN CAPE GIRARDEAU | | | | HOO NOTE: Information regarding the same event was reported to the NRC | | Operations Center on 09/01/00 by Engelhardt & Associates. (Refer to event | | #37282.) | | | | The licensee was advised by the NRC Region 3 Office to followup on the | | report made by Engelhardt & Associates because the work was performed on the | | Southeast Missouri State University Campus. The licensee is making this | | notification because they want to document that they are aware of this issue | | and that they agree with the Engelhardt & Associates report. Another reason | | for the report is that there may be an issue of who the responsible party is | | at this point in time. | | | | As a result of an NRC visit in February, Southeast Missouri State University | | discovered that a spill had occurred in the basement of Magill Hall. | | Accordingly, Engelhardt & Associates was contracted to perform several tasks | | including cleanup of the spill. At the time, the spill was thought to be | | minor, and the licensee has since found out that the spill was quite major. | | In addition to cleanup of the spill, Engelhardt & Associates was contracted | | to help the licensee get ready for a waste haul and help prepare a new | | Radiation Plan. An Engelhardt & Associates representative arrived on | | 06/12/00, and he worked in (and out) the basement of Magill Hall for 5 | | days. | | | | On 09/01/00, the NRC Region 3 Office (Kevin Null) notified the licensee that | | the Engelhardt & Associates employee had received a dose of 9 REM CEDE. As | | a result, the licensee is in the process of trying to arrange followup | | testing for the Engelhardt & Associates employee. The licensee has also | | hired another firm (SAIC) to cleanup some areas of Magill Hall because of a | | secondary spill that occurred quite some time ago. SAIC representatives | | have been on campus for a 1-week period already and are expected to return | | to the campus on 09/18/00. SAIC will also be handling the licensee's dose | | assessment. | | | | Call the NRC operations officer for licensee contact information. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021