Event Notification Report for September 1, 2000
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 08/31/2000 - 09/01/2000 ** EVENT NUMBERS ** 37277 37278 37279 37280 37281 +------------------------------------------------------------------------------+ |Fuel Cycle Facility |Event Number: 37277 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: PADUCAH GASEOUS DIFFUSION PLANT |NOTIFICATION DATE: 08/31/2000| | RXTYPE: URANIUM ENRICHMENT FACILITY |NOTIFICATION TIME: 05:30[EDT]| | COMMENTS: 2 DEMOCRACY CENTER |EVENT DATE: 08/30/2000| | 6903 ROCKLEDGE DRIVE |EVENT TIME: 16:10[CDT]| | BETHESDA, MD 20817 (301)564-3200 |LAST UPDATE DATE: 08/31/2000| | CITY: PADUCAH REGION: 3 +-----------------------------+ | COUNTY: McCRACKEN STATE: KY |PERSON ORGANIZATION | |LICENSE#: GDP-1 AGREEMENT: Y |MELVYN LEACH R3 | | DOCKET: 0707001 |BRIAN SMITH NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: - | | | HQ OPS OFFICER: STEVE SANDIN | | +------------------------------------------------+ | |EMERGENCY CLASS: N/A | | |10 CFR SECTION: | | |OCBA 76.120(c)(2)(i) ACCID MT EQUIP FAILS | | |OCBB 76.120(c)(2)(ii) EQUIP DISABLED/FAILS | | |OCBC 76.120(c)(2)(iii) REDUNDANT EQUIP INOP | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | AREA CONTROL ROOM (ACR) ALARM POWER LOST DUE TO A FAILURE IN THE POWER | | TRANSFER SWITCH | | | | "At 1610 on 08-30-00 the PSS was informed of a C-331 CAAS Cluster J Trouble | | alarm. Investigation of trouble alarm revealed that C-331 CAAS Horns | | solenoids had lost DC power. The C-331 ACR DC alarm power was lost due to | | the failures in the power transfer switch. Contacts fused together and a | | solenoid failed which allowed the transfer switch to reposition to the mid | | (no power) position and prevented repositioning to the emergency power | | position. Since the CAAS horns did not have power, they were unable to | | perform the intended safety function, rendering the system inoperable for | | audibility. The system is required to be operable according to TSR 2.4.4.7.b | | for the current mode of operation. The horns were without power (inoperable) | | for approximately 30 minutes until the transfer switch was physically forced | | to the emergency power position. | | | | This event is reportable under 10 CFR 76.120(c)(2) as an event in which | | equipment required by the TSR is disabled or fails to function as designed. | | | | The NRC Resident Inspector has been notified of this event. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Other Nuclear Material |Event Number: 37278 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: U.S. AIR FORCE |NOTIFICATION DATE: 08/31/2000| |LICENSEE: U.S. AIR FORCE |NOTIFICATION TIME: 10:15[EDT]| | CITY: CANNON AFB REGION: 4 |EVENT DATE: 08/30/2000| | COUNTY: STATE: NM |EVENT TIME: 14:00[MDT]| |LICENSE#: 42-23539-01AF AGREEMENT: Y |LAST UPDATE DATE: 08/31/2000| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |CHUCK PAULK R4 | | |BRIAN SMITH | +------------------------------------------------+ | | NRC NOTIFIED BY: MAJOR WROBEL | | | HQ OPS OFFICER: FANGIE JONES | | +------------------------------------------------+ | |EMERGENCY CLASS: N/A | | |10 CFR SECTION: | | |BAB1 20.2201(a)(1)(i) LOST/STOLEN LNM>1000X | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | 4 MISSING EXIT SIGNS CONTAINING TRITIUM | | | | The licensee reported that 4 exit signs, 'Safety Sign' by SRB Technologies | | Inc., each containing 20 curies of tritium, were discovered missing and | | presumed stolen from building 1245. An investigation is underway and a | | report will follow in 30 days. | | | | The licensee notified NRC R4 (Gaines). | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Fuel Cycle Facility |Event Number: 37279 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: GLOBAL NUCLEAR FUEL - AMERICAS |NOTIFICATION DATE: 08/31/2000| | RXTYPE: URANIUM FUEL FABRICATION |NOTIFICATION TIME: 10:55[EDT]| | COMMENTS: LEU CONVERSION (UF6 TO UO2) |EVENT DATE: 08/31/2000| | LEU FABRICATION |EVENT TIME: 10:00[EDT]| | LWR COMMERICAL FUEL |LAST UPDATE DATE: 08/31/2000| | CITY: WILMINGTON REGION: 2 +-----------------------------+ | COUNTY: NEW HANOVER STATE: NC |PERSON ORGANIZATION | |LICENSE#: SNM-1097 AGREEMENT: Y |CAUDLE JULIAN R2 | | DOCKET: 07001113 |BRIAN SMITH NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: ALLEN MABRY | | | HQ OPS OFFICER: FANGIE JONES | | +------------------------------------------------+ | |EMERGENCY CLASS: N/A | | |10 CFR SECTION: | | |BAB2 20.2201(a)(1)(ii) LOST/STOLEN LNM>10X | | |KFIS 70.52(b) LOSS OF SNM/FISSILE | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | 2 SETS OF CALIBRATION SOURCES DISCOVERED MISSING | | | | "At 10 AM on August 31, 2000 Global Nuclear Fuel - Americas determined that | | two sets of instrument calibration sources are missing following a thorough | | search. Each source set contains four metal disks electroplated with Pu-239, | | Total activity contained in both source sets is approximately 1.7 | | microcuries. The sources had been sent to a vendor for calibration | | re-certification. | | | | "The sources were unaccounted for during a routine source inventory at | | GNF-A. The vendor performing the calibration recertification last accounted | | for the sources when shipped on August 2, 2000. Records of the common | | carrier which transported the sources from the vendor to GNF-A indicate the | | material was shipped as an excepted package limited quantity and delivered | | to GNF-A on August 7. 2000. The inner packaging and each source are marked | | with radioactive warning labels. There is no measurable radiation dose rate | | from this type of package. A search of likely locations at GNFA has been | | conducted with negative results. | | | | "This event is reportable pursuant to 10CFR20.2201, 10CFR70.52 and | | 10CFR74.11. Efforts to locate the sources continue." | | | | The licensee intends to notify New Hanover County, North Carolina State | | Department of Radiation Protection, and NRC R2(Ayers). | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 37280 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: SUSQUEHANNA REGION: 1 |NOTIFICATION DATE: 08/31/2000| | UNIT: [1] [2] [] STATE: PA |NOTIFICATION TIME: 19:42[EDT]| | RXTYPE: [1] GE-4,[2] GE-4 |EVENT DATE: 08/24/2000| +------------------------------------------------+EVENT TIME: 08:38[EDT]| | NRC NOTIFIED BY: FITCH |LAST UPDATE DATE: 08/31/2000| | HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |PETE ESELGROTH R1 | |10 CFR SECTION: | | |AIND 50.72(b)(2)(iii)(D) ACCIDENT MITIGATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | |2 N N 0 Startup |0 Startup | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | THE CONTROL ROOM EMERGENCY OUTSIDE AIR SYSTEM(CREOAS) FUNCTION IS DEFEATED | | WHEN THE CONTROL ROOM SMOKE REMOVAL FANS OPERATE. | | | | On August 24, 2000, Susquehanna Unit 1 was Operating at 100% power and Unit | | 2 was in Mode 2 at 0% power. Operations had placed the Control Structure | | (CS) Smoke Removal ventilation system in service aligned to the Control Room | | (CR) and Technical Support Center (TSC) areas to exhaust the foul odor | | created by welding on the CR ventilation duct as part of modification work. | | The CS Smoke Removal System was shutdown after personnel noticed a negative | | differential pressure was created in the CR and TSC areas. This mode of | | operation existed for 2 hours and 18 minutes. Subsequent review of the event | | on August 31, 2000 concluded that when the CR Smoke Removal fans operate, | | they act to defeat the function of the CREOAS fans which are intended to | | maintain the CS pressure positive. Maintaining a positive pressure in the CS | | assures that all air entering the CS has passed through the CREOAS filter | | train (thus assuring no air enters via infiltration). | | | | The NRC Resident Inspector was notified. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 37281 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: CLINTON REGION: 3 |NOTIFICATION DATE: 08/31/2000| | UNIT: [1] [] [] STATE: IL |NOTIFICATION TIME: 21:32[EDT]| | RXTYPE: [1] GE-6 |EVENT DATE: 08/31/2000| +------------------------------------------------+EVENT TIME: 17:47[CDT]| | NRC NOTIFIED BY: TIEDEMANN |LAST UPDATE DATE: 08/31/2000| | HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |MELVYN LEACH R3 | |10 CFR SECTION: | | |AIND 50.72(b)(2)(iii)(D) ACCIDENT MITIGATION | | |NLCO TECH SPEC LCO A/S | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | PLANT ENTERED 72 HOUR LCO ACTION STATEMENT WHEN DIVISION III DIESEL | | GENERATOR WAS DECLARED INOPERABLE | | | | During performance of Fire Protection Surveillance 9337.81 (performs a | | functional check of the Division Ill Diesel Generator (DG) Carbon Dioxide | | (CO2) system operation), the Division Ill DG ventilation system tripped | | during restoration. Electrical Maintenance personnel were performing a | | functional check of the Division Ill DG room thermal detectors when the | | panel reset push button was depressed. The anticipated resets did not occur | | and the decision was made to restore the system to a safe condition. During | | restoration, a sticking relay prevented restoration of the Division Ill DG | | ventilation system. The relay has been reset and the ventilation system | | restored. | | | | Division Ill DG was declared INOPERABLE at 1747 and the plant entered LCO | | 3.8.1. | | Action B.1- Perform 9082.01 within 1 hour and every 8 hours thereafter. | | Action B.2- Declare required features supported by Division Ill DG inop when | | the redundant required features are inop, within 4 hours. | | Action B.3.1- Determine Operable DG are not inop due to common cause failure | | within 24 hours - This action -completed. | | Action B.4- Restore Div 3 DG to Operable within 72 hrs. | | Division Ill DG was declared OPERABLE at 1813 and the LCO was exited. | | | | The NRC Resident Inspector was notified.. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021