The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for August 25, 2000

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           08/24/2000 - 08/25/2000

                              ** EVENT NUMBERS **

37252  37253  37254  

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37252       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: FITZPATRICK              REGION:  1  |NOTIFICATION DATE: 08/24/2000|
|    UNIT:  [1] [] []                 STATE:  NY |NOTIFICATION TIME: 02:28[EDT]|
|   RXTYPE: [1] GE-4                             |EVENT DATE:        08/23/2000|
+------------------------------------------------+EVENT TIME:        14:15[EDT]|
| NRC NOTIFIED BY:  B HORNING                    |LAST UPDATE DATE:  08/24/2000|
|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |CHRISTOPHER CAHILL   R1      |
|10 CFR SECTION:                                 |                             |
|AINB 50.72(b)(2)(iii)(B) POT RHR INOP           |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| BOTH DIVISIONS OF CORE SPRAY AND HPCI RENDERED INOPERABLE.                   |
|                                                                              |
| During a walkdown of equipment required to be environmentally qualified,     |
| plant staff identified electrical circuits which do not conform to the       |
| requirements of 10 CFR 50.49.  These circuits control the minimum flow motor |
| operated valves  for both divisions of Core Spray and HPCI (High Pressure    |
| Coolant Injection).  This condition rendered both divisions of Core Spray    |
| and HPCI inoperable. Technical Specification Limiting Condition of Operation |
| for Core Spray and HPCI were entered.  This condition therefore constitutes  |
| a condition that alone could have prevented Core Spray and HPCI from         |
| removing decay heat.                                                         |
|                                                                              |
| The NRC Resident Inspector was notified of this event by the licensee.       |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37253       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: FITZPATRICK              REGION:  1  |NOTIFICATION DATE: 08/24/2000|
|    UNIT:  [1] [] []                 STATE:  NY |NOTIFICATION TIME: 05:27[EDT]|
|   RXTYPE: [1] GE-4                             |EVENT DATE:        08/24/2000|
+------------------------------------------------+EVENT TIME:        04:35[EDT]|
| NRC NOTIFIED BY:  SQUIRES                      |LAST UPDATE DATE:  08/24/2000|
|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |CHRISTOPHER CAHILL   R1      |
|10 CFR SECTION:                                 |CHARLES MILLER       IRO     |
|AINT 50.72(b)(1)(vi)     INTERNAL THREAT        |TAD MARSH            NRR     |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |53       Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| SMOKE AND SMALL FLAMES FROM "B" REACTOR FEED PUMP (RFP) OUTBOARD BEARING.    |
| FIRE LESS THAN 15 MINUTES.                                                   |
|                                                                              |
| Control room plant received a high bearing temperature alarm from the "B"    |
| RFP. Plant personnel were dispatched to investigate.  Smoke and small flames |
| were seen around the outboard bearing of "B" RFP.  Onsite fire brigade was   |
| dispatched to extinguish the fire.  Fire brigade was unsuccessful in         |
| extinguishing the fire using carbon dioxide. Fire was extinguished using a   |
| fire hose.  No other electrical systems were wetted by the fire hose.        |
| Reactor power was reduced from 100% to approximately 53% power at which time |
| the "B" RFP was taken out service.  A reflash fire watch is stationed at the |
| "B" RFP.  Lagging has been removed from the RFP and the lagging where the    |
| smoke and fire issued from is oil soaked. Investigation of fire is in        |
| progress.  Unnecessary personnel were evacuated from the area of the fire.   |
| "B" RFP is located in the Turbine Building lower level (252').  All          |
| Emergency Core Cooling Systems are fully operable except for HPCI (see event |
| # 37252).  Offsite electrical grid is stable.  No offsite site help was      |
| needed.  Fire lasted from 0435 ET until 0449 ET.                             |
|                                                                              |
| The NRC Resident Inspector was notified of this event by the licensee.       |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37254       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SALEM                    REGION:  1  |NOTIFICATION DATE: 08/24/2000|
|    UNIT:  [1] [2] []                STATE:  NJ |NOTIFICATION TIME: 21:22[EDT]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        08/24/2000|
+------------------------------------------------+EVENT TIME:        20:30[EDT]|
| NRC NOTIFIED BY:  VAN FORD                     |LAST UPDATE DATE:  08/25/2000|
|  HQ OPS OFFICER:  FANGIE JONES                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |CHRISTOPHER CAHILL   R1      |
|10 CFR SECTION:                                 |                             |
|AOUT 50.72(b)(1)(ii)(B)  OUTSIDE DESIGN BASIS   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| CONTROL ROOM VENTILATION NOT ALIGNED PROPERLY FOR TOXIC CHEMICAL DELIVERY    |
|                                                                              |
| The licensee reported that they were potentially outside of design license   |
| basis for the receipt of hazardous/toxic chemicals, specifically ammonium    |
| hydroxide 15 % by weight.  A delivery truck arrived at the site and was      |
| admitted to the protected area before the proper alignment was made for      |
| receipt.  The control room was contacted, but the alignment of control room  |
| ventilation was not completed prior to admitting the truck.  The control     |
| room ventilation has been placed in full recirculation for chemical receipt  |
| at this time.  The total time ventilation was not properly aligned is not    |
| available at this time.                                                      |
|                                                                              |
| The licensee intends to notify the NRC Resident Inspector.                   |
|                                                                              |
| * * * UPDATE AT 2345 EDT ON 8/24/00 BY VAN FORD TO FANGIE JONES * * *        |
|                                                                              |
| The licensee reported there were no spills or discharges during the          |
| offloading process and there was no risk to onsite or offsite personnel at   |
| any time.  The chemical unloading procedure contains all requirements for    |
| personal protective equipment and appropriate precautions.  The chemistry    |
| department procedure for chemical delivery may be in conflict with Salem     |
| UFSAR requirements (Section 2.2.3.3), Hazardous Chemicals - Offsite.         |
| Station personnel are evaluating the issue.                                  |
|                                                                              |
| The licensee intends to notify the NRC Resident Inspector.  The NRC          |
| Operations Officer notified the R1DO (Christopher Cahill).                   |
+------------------------------------------------------------------------------+
