The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for August 7, 2000

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           08/04/2000 - 08/07/2000

                              ** EVENT NUMBERS **

37197  37208  37209  

+------------------------------------------------------------------------------+
|Other Nuclear Material                           |Event Number:   37197       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  NATIONAL INST OF STANDARDS & TECH    |NOTIFICATION DATE: 07/28/2000|
|LICENSEE:  NATIONAL INST OF STANDARDS & TECH    |NOTIFICATION TIME: 14:29[EDT]|
|    CITY:  GAITHERSBURG             REGION:  1  |EVENT DATE:        07/10/2000|
|  COUNTY:                            STATE:  MD |EVENT TIME:             [EDT]|
|LICENSE#:  SNM-362               AGREEMENT:  Y  |LAST UPDATE DATE:  08/04/2000|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |MOHAMED SHANBAKY     R1      |
|                                                |SCOTT MOORE          NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  JIM O'REAR                   |                             |
|  HQ OPS OFFICER:  STEVE SANDIN                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|NINF                     INFORMATION ONLY       |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| POTENTIALLY LEAKING SOURCE                                                   |
|                                                                              |
| A 5mCi Sr-90 source in the form of a brachytherapy seed used for             |
| investigational purposes may be leaking.  There is no known personnel        |
| exposure or spread of contamination involved.   The source was manufactured  |
| by Novoste which is located in GA .  The evaluation will continue to         |
| determine whether the source is actually leaking.                            |
|                                                                              |
| * * * UPDATE ON 08/04/00 AT 1459 ET BY JIM O'REAR TAKEN BY MACKINNON * * *   |
|                                                                              |
| Up on further investigation it was determined that the brachytherapy seed    |
| was damaged by NIST personnel during calibration work.  The seed was         |
| packaged up and returned to AEA Technologies located in Massachusetts.  NRC  |
| Region 1, John McGrath, was informed of this update by NIST.  NRC R1DO (Jack |
| McFadden) and NMSS EO (John Hickey) notified.                                |
|                                                                              |
| Correction To Initial Report:  The brachytherapy seed was manufactured by    |
| AEA Technologies for Novoste.                                                |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37208       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: BRUNSWICK                REGION:  2  |NOTIFICATION DATE: 08/05/2000|
|    UNIT:  [] [2] []                 STATE:  NC |NOTIFICATION TIME: 08:07[EDT]|
|   RXTYPE: [1] GE-4,[2] GE-4                    |EVENT DATE:        08/05/2000|
+------------------------------------------------+EVENT TIME:        04:28[EDT]|
| NRC NOTIFIED BY:  STUART BYRD                  |LAST UPDATE DATE:  08/05/2000|
|  HQ OPS OFFICER:  LEIGH TROCINE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |GEORGE BELISLE       R2      |
|10 CFR SECTION:                                 |                             |
|AIND 50.72(b)(2)(iii)(D) ACCIDENT MITIGATION    |                             |
|NLCO                     TECH SPEC LCO A/S      |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| DISCOVERY OF A MINIMAL AMOUNT OF WATER IN THE REACTOR CORE ISOLATION COOLING |
| OIL SYSTEM                                                                   |
|                                                                              |
| The following text is a portion of a facsimile received from the licensee:   |
|                                                                              |
| "EVENT:  The Unit 2 the Reactor Core Isolation Cooling (RCIC) system was     |
| discovered to have a minimal amount of water in the oil system.  Following   |
| investigation of the event and replacement of the oil, the RCIC turbine was  |
| successfully manually started and operated normally.  During a subsequent    |
| automatic start for post-maintenance test requirements, the turbine tripped  |
| on high exhaust pressure apparently caused by the governor system's slow     |
| response time.  Investigation of the turbine control system is continuing."  |
|                                                                              |
| "CORRECTIVE ACTION(S):  Continue the investigation to determine the root     |
| cause of the water in the oil system and the response of the governor        |
| control system."                                                             |
|                                                                              |
| "INITIAL SAFETY SIGNIFICANCE EVALUATION:  Minimal.  The High Pressure        |
| Coolant Injection System, Automatic [Depressurization] System, Low Pressure  |
| Core Spray, and the Low Pressure Coolant Injection System were operable      |
| throughout the event."                                                       |
|                                                                              |
| The licensee stated that, as a result of this issue, the unit is currently   |
| in a 14-day limiting condition for operation in accordance with Technical    |
| Specification 3.5.2.  The licensee also stated that all other systems        |
| functioned as required.                                                      |
|                                                                              |
| The licensee notified the NRC resident inspector.                            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37209       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: THREE MILE ISLAND        REGION:  1  |NOTIFICATION DATE: 08/05/2000|
|    UNIT:  [1] [] []                 STATE:  PA |NOTIFICATION TIME: 21:45[EDT]|
|   RXTYPE: [1] B&W-L-LP,[2] B&W-L-LP            |EVENT DATE:        08/05/2000|
+------------------------------------------------+EVENT TIME:        20:54[EDT]|
| NRC NOTIFIED BY:  J SCHORK                     |LAST UPDATE DATE:  08/05/2000|
|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |JACK MCFADDEN        R1      |
|10 CFR SECTION:                                 |                             |
|AOUT 50.72(b)(1)(ii)(B)  OUTSIDE DESIGN BASIS   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| DURING TESTING ONE CUBICLE OF THE CONTROL BUILDING ENVELOPE, THE 1D 4160     |
| VOLT SWITCHGEAR ROOM WAS FOUND TO BE SLIGHTLY NEGATIVE IN PRESSURE.          |
|                                                                              |
| "At 2054 hours on Saturday, August 5, 2000-AmerGen identified a condition    |
| that is outside the design basis at TMI Unit 1. Functional testing of the    |
| TMI-1 Control Building Envelope {CBE} was in process to verify that the      |
| design basis of the Control Building Emergency Ventilation System had been   |
| maintained following plant                                                   |
| modifications to improve the reliability of the system. Results of the       |
| Functional testing found that one cubicle of the Control Building Envelope,  |
| the 1D 4160 Volt Switchgear room, located on the 338' elevation of the       |
| Control Tower, 1 floor below the Control Room, was slightly negative in      |
| regards to internal atmospheric pressure as compared to outside air          |
| pressure. The TMI-1 UFSAR, Update 15 states in section 7.4.5.2.1 in part:    |
|                                                                              |
| " ....A positive pressure of > or equal to 0.10 inches w.g. {water gauge} is |
| not a criterion for the entire CBE. The pressure requirement in the cubicles |
| of the CBE, other than the Main Control Room, is that they are maintained at |
| a positive pressure with respect to the areas outside the CBE.               |
|                                                                              |
| "The functional testing found that the ID 4160 Switchgear room was           |
| approximately 0.04 inches w.g. negative in regards to areas outside the CBE. |
| Subsequent adjustments to the Control Building Emergency Ventilation System  |
| restored the area to a positive pressure in regards to areas outside the     |
| CBE. Additional evaluation and testing is in progress to determine the root  |
| cause of the event.                                                          |
|                                                                              |
| "The potential consequences of the condition found are believed to be        |
| minimal. No actual in-leakage pathway was identified and if the Control      |
| Building Emergency Ventilation System been called upon to operate in the     |
| re-circulation mode and had in-leakage occurred, the air in-leakage would    |
| have been filtered by the CBEVS                                              |
| charcoal filters prior to supply to the Control Room. Thus, the dose         |
| consequences to the operators would have been very minimal due to the low    |
| amount of in-leakage and filtration prior to supply to the control room."    |
|                                                                              |
| A follow up 30 day LER will be submitted.                                    |
|                                                                              |
| The NRC Resident Inspector was notified of this event by the licensee.       |
+------------------------------------------------------------------------------+
