The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for July 14, 2000

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           07/13/2000 - 07/14/2000

                              ** EVENT NUMBERS **

37138  37165  

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37138       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: VERMONT YANKEE           REGION:  1  |NOTIFICATION DATE: 06/30/2000|
|    UNIT:  [1] [] []                 STATE:  VT |NOTIFICATION TIME: 15:43[EDT]|
|   RXTYPE: [1] GE-4                             |EVENT DATE:        06/13/2000|
+------------------------------------------------+EVENT TIME:        14:00[EDT]|
| NRC NOTIFIED BY:  MARK MAGNUSON                |LAST UPDATE DATE:  07/13/2000|
|  HQ OPS OFFICER:  BOB STRANSKY                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |SCOTT MORRIS         R1      |
|10 CFR SECTION:                                 |                             |
|AOUT 50.72(b)(1)(ii)(B)  OUTSIDE DESIGN BASIS   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| UNIT OUTSIDE OF DESIGN BASIS                                                 |
|                                                                              |
| "On 6/13/00, Vermont Yankee (VY) discovered that a turbine building to       |
| radwaste hallway door had been breached open for maintenance activities      |
| without proper engineering review. The condition has been corrected.         |
|                                                                              |
| "The door serves as a high energy line break (HELB) barrier such that a HELB |
| in the turbine building would not propagate into the radwaste hallway and    |
| cause subsequent failure of masonry block wall between the hallway and the   |
| main plant switchgear rooms. Redundant equipment in the switchgear rooms is  |
| not qualified for operation in the environment postulated by the TB HELB.    |
|                                                                              |
| "VY review has determined that a compensatory measure to close the door in   |
| the event of a HELB that had been established at the time of the maintenance |
| activities would not have provided adequate protection against the           |
| postulated HELB.                                                             |
|                                                                              |
| "Based on the above, this condition is reportable in accordance with 10 CFR  |
| 50.72(b)(1)(ii)(B) as a condition found during operation that results in a   |
| condition that is outside the design basis of the plant."                    |
|                                                                              |
| The NRC resident inspector has been informed of this event by the licensee.  |
|                                                                              |
| * * * RETRACTED AT 1831 EDT ON 7/13/00 BY MARK MAGNUSON TO FANGIE JONES * *  |
| *                                                                            |
|                                                                              |
| "On June 30, 2000 Vermont Yankee reported that a planned compensatory        |
| measure associated with a breached door would not have been adequate to      |
| protect plant equipment in the unlikely event of a high energy line break in |
| the turbine building. The condition was reported under 10 CFR                |
| 50.72(b)(1)(ii)(B) as a condition that was outside the design basis. The     |
| associated NRC event number is 37138.                                        |
|                                                                              |
| "Vermont Yankee has since determined that the door had not been tied open    |
| for a period of time greater than the 24 hours allowed by VY technical       |
| specifications for equipment that may have been affected by the high energy  |
| line break. In addition, VY assessment has concluded that redundant          |
| equipment would not have been challenged and that the overall risk of the    |
| short term event was minimal.                                                |
|                                                                              |
| "Based on this information, the 50.72 ENS notification is retracted."        |
|                                                                              |
| The licensee notified the NRC Resident Inspector.  The NRC Operations        |
| Officer notified the R1DO (Richard Conte).                                   |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37165       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: CALVERT CLIFFS           REGION:  1  |NOTIFICATION DATE: 07/13/2000|
|    UNIT:  [1] [2] []                STATE:  MD |NOTIFICATION TIME: 16:43[EDT]|
|   RXTYPE: [1] CE,[2] CE                        |EVENT DATE:        07/13/2000|
+------------------------------------------------+EVENT TIME:        16:00[EDT]|
| NRC NOTIFIED BY:  TIM RITI                     |LAST UPDATE DATE:  07/13/2000|
|  HQ OPS OFFICER:  FANGIE JONES                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |RICHARD CONTE        R1      |
|10 CFR SECTION:                                 |                             |
|AIND 50.72(b)(2)(iii)(D) ACCIDENT MITIGATION    |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| CONTROL ROOM RADIATION SIGNAL DISCOVERED NOT TO FUNCTION AS DESIGNED DURING  |
| LOSS OF OFFSITE POWER                                                        |
|                                                                              |
| The licensee discovered that the control room radiation signal would not     |
| function as designed during the loss of offsite power.  They have taken      |
| manual action per technical specifications to insure proper action during    |
| the loss of offsite power.  A written LER will be submitted within 30 days.  |
|                                                                              |
| The licensee notified the NRC Resident Inspector.                            |
+------------------------------------------------------------------------------+
