Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Event Notification Report for June 1, 2000

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           05/31/2000 - 06/01/2000

                              ** EVENT NUMBERS **

37045  37046  

+------------------------------------------------------------------------------+
|General Information or Other                     |Event Number:   37045       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  US AIR FORCE                         |NOTIFICATION DATE: 05/31/2000|
|LICENSEE:  US AIR FORCE                         |NOTIFICATION TIME: 13:19[EDT]|
|    CITY:  BROOKS AFB               REGION:  4  |EVENT DATE:        05/30/2000|
|  COUNTY:                            STATE:  TX |EVENT TIME:        09:00[CDT]|
|LICENSE#:  42-23539-01AF         AGREEMENT:  Y  |LAST UPDATE DATE:  05/31/2000|
|  DOCKET:  03028641                             |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |GARY SANBORN         R4      |
|                                                |JOHN HICKEY          NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  MAJ. WROBEL                  |                             |
|  HQ OPS OFFICER:  CHAUNCEY GOULD               |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|IBBF 30.50(b)(2)(ii)     EQUIP DISABLED/FAILS   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| SOURCE COULD NOT BE MOVED TO THE EXPOSURE POSITION WHILE ATTEMPTING TO USE   |
| AN IRRADIATOR AT BROOKS AFB, TEXAS.                                          |
|                                                                              |
| A J L SHEPHERD 81-10 IRRADIATOR CONTAINING 130 CURIE SOURCE OF CS-137 WOULD  |
| NOT OPERATE PROPERLY WHEN THE OPERATOR ATTEMPTED TO USE IT.  THE SOURCE      |
| APPEARS TO BE STUCK IN THE SHIELDED POSITION AND CAN NOT BE MOVED TO THE     |
| EXPOSURE POSITION.  THE AIR FORCE IS CURRENTLY TROUBLESHOOTING WITH THE      |
| VENDOR VIA TELEPHONE TO CORRECT THE PROBLEM.  IF NOTHING CAN BE DONE THEY    |
| WILL CALL IN THE VENDOR.  THE SOURCE IS IN THE SHIELDED POSITION.            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37046       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: LASALLE                  REGION:  3  |NOTIFICATION DATE: 05/31/2000|
|    UNIT:  [] [2] []                 STATE:  IL |NOTIFICATION TIME: 18:04[EDT]|
|   RXTYPE: [1] GE-5,[2] GE-5                    |EVENT DATE:        05/31/2000|
+------------------------------------------------+EVENT TIME:        13:30[CDT]|
| NRC NOTIFIED BY:  COVEYOU                      |LAST UPDATE DATE:  05/31/2000|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |GARY SHEAR           R3      |
|10 CFR SECTION:                                 |                             |
|AIND 50.72(b)(2)(iii)(D) ACCIDENT MITIGATION    |                             |
|NLCO                     TECH SPEC LCO A/S      |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     N          Y       97       Power Operation  |97       Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| PLANT ENTERED A 7 DAY LCO DUE TO HPCS BEING DECLARED INOPERABLE.             |
|                                                                              |
| While performing monthly surveillance start LOS-DG-M3, for the High-Pressure |
| Core Spray (HPCS) systems Emergency Diesel Generator, the Diesel             |
| automatically tripped off on an over-speed signal. The Diesel was being      |
| started from an idle condition while an operator was attempting to maintain  |
| speed between 400 and 500 rpm. The Diesel does not appear to have been       |
| damaged but remains shutdown and unavailable for on-going investigation of   |
| the failure. The High-Pressure Core Spray system is inoperable but available |
| from normal power source only. The failure mechanism is being investigated   |
| and corrective actions will be performed.                                    |
|                                                                              |
| The NRC Resident Inspector was notified.                                     |
+------------------------------------------------------------------------------+


Page Last Reviewed/Updated Wednesday, March 24, 2021

Page Last Reviewed/Updated Wednesday, March 24, 2021