The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for May 19, 2000

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           05/18/2000 - 05/19/2000

                              ** EVENT NUMBERS **

36907  36983  36986  37010  37011  

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36907       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SURRY                    REGION:  2  |NOTIFICATION DATE: 04/19/2000|
|    UNIT:  [1] [2] []                STATE:  VA |NOTIFICATION TIME: 21:36[EDT]|
|   RXTYPE: [1] W-3-LP,[2] W-3-LP                |EVENT DATE:        04/19/2000|
+------------------------------------------------+EVENT TIME:        18:16[EDT]|
| NRC NOTIFIED BY:  ALLEN HARROW                 |LAST UPDATE DATE:  05/18/2000|
|  HQ OPS OFFICER:  BOB STRANSKY                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |ANN BOLAND           R2      |
|10 CFR SECTION:                                 |                             |
|AINC 50.72(b)(2)(iii)(C) POT UNCNTRL RAD REL    |                             |
|AIND 50.72(b)(2)(iii)(D) ACCIDENT MITIGATION    |                             |
|NLCO                     TECH SPEC LCO A/S      |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          N       0        Cold Shutdown    |0        Cold Shutdown    |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| FILTERED EXHAUST FANS CANNOT BE OPERATED IN PARALLEL                         |
|                                                                              |
| "Based on Unit 1H and 1J emergency bus logic testing performed on 4/18/00    |
| and 4/19/00 in accordance with 1-OPT-ZZ-001 and 1-OPT-ZZ-002, it has been    |
| concluded that the Cat 1 Filtered Exhaust Fans, 1-VS-F-58A & B, will not     |
| operate in parallel without tripping one or both fans. As a result, an event |
| or condition that alone could have prevented the fulfillment of a safety     |
| function of structures or systems that are needed to control the release of  |
| radioactive material, or mitigate the consequences of an accident exists for |
| Surry Units 1 and 2. This condition is reportable in accordance with 10 CFR  |
| 50.72(b)(2)(iii).                                                            |
|                                                                              |
| "Both fans have been tested by operating the fans individually. This testing |
| has determined that operation and performance of each fan is entirely        |
| satisfactory when operated independently.                                    |
|                                                                              |
| "The current system alignment is that one of the two fans is in the          |
| pull-to-lock position, and the other fan is in automatic stand-by. In this   |
| configuration, one fan is operable, and fully capable of performing its      |
| required functions. Unit 2 entered a 7 day Technical Specification 3.22.B    |
| action statement on 4/18/00 at 1240 hours as a result of this condition.     |
|                                                                              |
| "The Surry Emergency Operating Procedures provide required directions to     |
| place a Cat 1 Filtered Exhaust Fan in service, if the fans fail to           |
| automatically start upon initiation of a Safety Injection. In the current    |
| configuration, if the operable Cat 1 Filtered Exhaust fan fails to start,    |
| the fan that is currently in PTL can be immediately placed in service."      |
|                                                                              |
| The NRC resident inspector has been informed of this event by the licensee.  |
|                                                                              |
| * * * UPDATE ON 5/18/00 @ 1243 BY HARROW TO GOULD * * *      RETRACTION      |
|                                                                              |
| NUREG 1022, Event Reporting Guidelines for10CFR50.72 and 50.73. states that  |
| "Reasonable operator actions to correct minor problems may be considered;    |
| however, heroic actions and unusually perceptive diagnoses, particularly     |
| during stressful situations should not be assumed."                          |
|                                                                              |
| Both CAT 1 FiItered Exhaust Fans were proven to operate satisfactorily when  |
| tested individually, and only one fan is needed to meet the system design    |
| requirements. If both fans had tripped after automatically starting from a   |
| Safety Injection signal, the Emergency Operating Procedures (EOP's) would    |
| direct that one fan be started.  This is accomplished from the control room, |
| and does not require unusual actions from the operator.  The Surry DBA Dose  |
| Analysis assumes that filtration of ECCS leakage begins 30 minutes           |
| post-accident, which is ample time to perform the EOP action of starting a   |
| Filtered Exhaust Fan if none are running.                                    |
|                                                                              |
| Based on the above review of the event and the information in NUREG 1022, it |
| has been determined that this event was not immediately reportable, as       |
| existing Emergency Operating Procedures would ensure that at least one fan   |
| is running within the required time after a Safety Injection signal is       |
| received.                                                                    |
|                                                                              |
| This notification is being made to retract the report made on 4/19/00 based  |
| on the above discussion.                                                     |
|                                                                              |
| The NRC Resident Inspector was notified.        Notified the Reg 2           |
| RDO(Wert).                                                                   |
+------------------------------------------------------------------------------+

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36983       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PILGRIM                  REGION:  1  |NOTIFICATION DATE: 05/08/2000|
|    UNIT:  [1] [] []                 STATE:  MA |NOTIFICATION TIME: 05:25[EDT]|
|   RXTYPE: [1] GE-3                             |EVENT DATE:        05/08/2000|
+------------------------------------------------+EVENT TIME:        03:56[EDT]|
| NRC NOTIFIED BY:  RANDY HAISLET                |LAST UPDATE DATE:  05/18/2000|
|  HQ OPS OFFICER:  BOB STRANSKY                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |NIEL DELLA GRECA     R1      |
|10 CFR SECTION:                                 |                             |
|AESF 50.72(b)(2)(ii)     ESF ACTUATION          |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| POST-ACCIDENT SAMPLING SYSTEM ISOLATION DURING TAGOUT                        |
|                                                                              |
| While performing a tagout on the 'A' train of the post-accident sampling     |
| system (PASS) H2/O2 sampling system, solenoid isolation valve SV-5065-20B,   |
| which is a 'B' train valve, closed unexpectedly. The licensee restored the   |
| 'A' train of PASS H2/O2 monitoring to service and closed the redundant       |
| solenoid isolation valve in the 'B' train. The licensee declared valve       |
| SV-5065-20B inoperable.                                                      |
|                                                                              |
| After review of system electrical diagrams, the licensee determined that the |
| closure of valve SV-5065-20B was appropriate, although its closure was not   |
| anticipated in the tagout procedure. The NRC resident inspector has been     |
| informed of this event by the licensee.                                      |
|                                                                              |
| * * * RETRACTION 1653 5/18/2000 FROM ERIC OLSON TAKEN BY BOB STRANSKY * * *  |
|                                                                              |
| The licensee is retracting this notification in accordance with NUREG-1022,  |
| Section 3.3.2, Paragraph 5. The licensee has determined that this event did  |
| not constitute an ESF actuation because only a portion of the system logic   |
| tripped. The NRC resident inspector has been informed of this retraction by  |
| the licensee. Notified R1DO (Lew).                                           |
+------------------------------------------------------------------------------+

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36986       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PILGRIM                  REGION:  1  |NOTIFICATION DATE: 05/08/2000|
|    UNIT:  [1] [] []                 STATE:  MA |NOTIFICATION TIME: 20:56[EDT]|
|   RXTYPE: [1] GE-3                             |EVENT DATE:        05/08/2000|
+------------------------------------------------+EVENT TIME:        20:25[EDT]|
| NRC NOTIFIED BY:  JOSEPH GIAR                  |LAST UPDATE DATE:  05/18/2000|
|  HQ OPS OFFICER:  DOUG WEAVER                  +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |JOHN ROGGE           R1      |
|10 CFR SECTION:                                 |                             |
|AOUT 50.72(b)(1)(ii)(B)  OUTSIDE DESIGN BASIS   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| OUTSIDE DESIGN BASIS - FOULING OF THE REACTOR BUILDING CLOSED COOLING WATER  |
| HEAT EXCHANGER (RBCCW HX).                                                   |
|                                                                              |
| Surveillance testing has identified fouling of the Salt Service Water (SSW)  |
| side of the RBCCW HX.  The extent of the fouling on one of the two heat      |
| exchangers would prevent design basis containment heat removal post-accident |
| at maximum design basis ultimate heat sink (UHS) temperature (75�F).         |
| Engineering evaluation has determined that design basis heat removal can be  |
| achieved with UHS temperature less than 70�F.  Periodic evaluation will be   |
| performed to ensure that additional fouling has not further degraded the     |
| heat exchangers heat transfer capability.                                    |
|                                                                              |
| The licensee will inform the NRC resident inspector.                         |
|                                                                              |
| * * * RETRACTION 1653 5/18/2000 FROM ERIC OLSON TAKEN BY BOB STRANSKY * * *  |
|                                                                              |
| The licensee has determined that the unit was not operated outside of the    |
| design basis. At the time of the report, the seawater temperature was 50�F.  |
| Therefore, the licensee is retracting this notification in accordance with   |
| NUREG-1022, Section 3.2.4. The NRC resident inspector has been informed of   |
| this retraction by the licensee. Notified R1DO (Lew).                        |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37010       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: NORTH ANNA               REGION:  2  |NOTIFICATION DATE: 05/18/2000|
|    UNIT:  [1] [2] []                STATE:  VA |NOTIFICATION TIME: 09:43[EDT]|
|   RXTYPE: [1] W-3-LP,[2] W-3-LP                |EVENT DATE:        05/18/2000|
+------------------------------------------------+EVENT TIME:        07:30[EDT]|
| NRC NOTIFIED BY:  R. WESLEY                    |LAST UPDATE DATE:  05/18/2000|
|  HQ OPS OFFICER:  LEIGH TROCINE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |LEN WERT             R2      |
|10 CFR SECTION:                                 |                             |
|APRE 50.72(b)(2)(vi)     OFFSITE NOTIFICATION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| OFFSITE NOTIFICATION REGARDING THE FAILURE OF A MAIN DAM SKIMMER GATE TO     |
| CLOSE                                                                        |
|                                                                              |
| The following text is a portion of a facsimile received from the licensee:   |
|                                                                              |
| "[The] Federal Energy Regulatory Commission (FERC) was notified at 0730 on   |
| 05/18/00 in accordance with 18CFR12.10(a)(1) for a condition affecting the   |
| safety of the project."                                                      |
|                                                                              |
| "Skimmer gate 1B at the main dam failed to close under normal operating      |
| conditions.  The gate is currently open, providing minimum flow.  Corrective |
| action is in progress."                                                      |
|                                                                              |
| The licensee stated that the skimmer gate is used to provide minimum flow    |
| downstream to the river and to provide adequate level control of the main    |
| reservoir for the lake (which supplies cooling water to the plant).  The     |
| required downstream flow of 40 scfm is currently being maintained.           |
|                                                                              |
| The licensee notified the NRC resident inspector.                            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Other Nuclear Material                           |Event Number:   37011       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  OKLAHOMA GAS & ELECTRIC              |NOTIFICATION DATE: 05/18/2000|
|LICENSEE:  OKLAHOMA GAS & ELECTRIC              |NOTIFICATION TIME: 17:16[EDT]|
|    CITY:                           REGION:  4  |EVENT DATE:        05/17/2000|
|  COUNTY:  MUSKOGEE                  STATE:  OK |EVENT TIME:             [CDT]|
|LICENSE#:  35-19819-03           AGREEMENT:  N  |LAST UPDATE DATE:  05/18/2000|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |BILL JONES           R4      |
|                                                |BILL REAMER          NMSS    |
+------------------------------------------------+FRANK CONGEL         IRO     |
| NRC NOTIFIED BY:  B. W. HALL                   |                             |
|  HQ OPS OFFICER:  BOB STRANSKY                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|BAB1 20.2201(a)(1)(i)    LOST/STOLEN LNM>1000X  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| MISSING RADIOACTIVE SOURCE                                                   |
|                                                                              |
| The licensee reported that a 200 mCi Cs-137 source was discovered to be      |
| missing from a group of sources removed from the Muskogee Power Plant for    |
| disposal. Several Omart model SHDP source holders (with sources) were        |
| transferred to Radiation Technology, Inc., a contractor, for disposal. These |
| source holders had been stored in a warehouse at the power plant for some    |
| time before being transferred to the contractor. The licensee was notified   |
| on 5/17/2000 by the contractor that one of the source holders was empty. The |
| licensee has searched their facility for the source but has been unable to   |
| locate it.                                                                   |
|                                                                              |
| The licensee has already contacted NRC Region 4 (L. Howell).                 |
+------------------------------------------------------------------------------+


Page Last Reviewed/Updated Thursday, March 25, 2021