Event Notification Report for May 19, 2000
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 05/18/2000 - 05/19/2000 ** EVENT NUMBERS ** 36907 36983 36986 37010 37011 !!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!!!! +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 36907 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: SURRY REGION: 2 |NOTIFICATION DATE: 04/19/2000| | UNIT: [1] [2] [] STATE: VA |NOTIFICATION TIME: 21:36[EDT]| | RXTYPE: [1] W-3-LP,[2] W-3-LP |EVENT DATE: 04/19/2000| +------------------------------------------------+EVENT TIME: 18:16[EDT]| | NRC NOTIFIED BY: ALLEN HARROW |LAST UPDATE DATE: 05/18/2000| | HQ OPS OFFICER: BOB STRANSKY +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |ANN BOLAND R2 | |10 CFR SECTION: | | |AINC 50.72(b)(2)(iii)(C) POT UNCNTRL RAD REL | | |AIND 50.72(b)(2)(iii)(D) ACCIDENT MITIGATION | | |NLCO TECH SPEC LCO A/S | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N N 0 Cold Shutdown |0 Cold Shutdown | |2 N Y 100 Power Operation |100 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | FILTERED EXHAUST FANS CANNOT BE OPERATED IN PARALLEL | | | | "Based on Unit 1H and 1J emergency bus logic testing performed on 4/18/00 | | and 4/19/00 in accordance with 1-OPT-ZZ-001 and 1-OPT-ZZ-002, it has been | | concluded that the Cat 1 Filtered Exhaust Fans, 1-VS-F-58A & B, will not | | operate in parallel without tripping one or both fans. As a result, an event | | or condition that alone could have prevented the fulfillment of a safety | | function of structures or systems that are needed to control the release of | | radioactive material, or mitigate the consequences of an accident exists for | | Surry Units 1 and 2. This condition is reportable in accordance with 10 CFR | | 50.72(b)(2)(iii). | | | | "Both fans have been tested by operating the fans individually. This testing | | has determined that operation and performance of each fan is entirely | | satisfactory when operated independently. | | | | "The current system alignment is that one of the two fans is in the | | pull-to-lock position, and the other fan is in automatic stand-by. In this | | configuration, one fan is operable, and fully capable of performing its | | required functions. Unit 2 entered a 7 day Technical Specification 3.22.B | | action statement on 4/18/00 at 1240 hours as a result of this condition. | | | | "The Surry Emergency Operating Procedures provide required directions to | | place a Cat 1 Filtered Exhaust Fan in service, if the fans fail to | | automatically start upon initiation of a Safety Injection. In the current | | configuration, if the operable Cat 1 Filtered Exhaust fan fails to start, | | the fan that is currently in PTL can be immediately placed in service." | | | | The NRC resident inspector has been informed of this event by the licensee. | | | | * * * UPDATE ON 5/18/00 @ 1243 BY HARROW TO GOULD * * * RETRACTION | | | | NUREG 1022, Event Reporting Guidelines for10CFR50.72 and 50.73. states that | | "Reasonable operator actions to correct minor problems may be considered; | | however, heroic actions and unusually perceptive diagnoses, particularly | | during stressful situations should not be assumed." | | | | Both CAT 1 FiItered Exhaust Fans were proven to operate satisfactorily when | | tested individually, and only one fan is needed to meet the system design | | requirements. If both fans had tripped after automatically starting from a | | Safety Injection signal, the Emergency Operating Procedures (EOP's) would | | direct that one fan be started. This is accomplished from the control room, | | and does not require unusual actions from the operator. The Surry DBA Dose | | Analysis assumes that filtration of ECCS leakage begins 30 minutes | | post-accident, which is ample time to perform the EOP action of starting a | | Filtered Exhaust Fan if none are running. | | | | Based on the above review of the event and the information in NUREG 1022, it | | has been determined that this event was not immediately reportable, as | | existing Emergency Operating Procedures would ensure that at least one fan | | is running within the required time after a Safety Injection signal is | | received. | | | | This notification is being made to retract the report made on 4/19/00 based | | on the above discussion. | | | | The NRC Resident Inspector was notified. Notified the Reg 2 | | RDO(Wert). | +------------------------------------------------------------------------------+ !!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!!!! +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 36983 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: PILGRIM REGION: 1 |NOTIFICATION DATE: 05/08/2000| | UNIT: [1] [] [] STATE: MA |NOTIFICATION TIME: 05:25[EDT]| | RXTYPE: [1] GE-3 |EVENT DATE: 05/08/2000| +------------------------------------------------+EVENT TIME: 03:56[EDT]| | NRC NOTIFIED BY: RANDY HAISLET |LAST UPDATE DATE: 05/18/2000| | HQ OPS OFFICER: BOB STRANSKY +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |NIEL DELLA GRECA R1 | |10 CFR SECTION: | | |AESF 50.72(b)(2)(ii) ESF ACTUATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | POST-ACCIDENT SAMPLING SYSTEM ISOLATION DURING TAGOUT | | | | While performing a tagout on the 'A' train of the post-accident sampling | | system (PASS) H2/O2 sampling system, solenoid isolation valve SV-5065-20B, | | which is a 'B' train valve, closed unexpectedly. The licensee restored the | | 'A' train of PASS H2/O2 monitoring to service and closed the redundant | | solenoid isolation valve in the 'B' train. The licensee declared valve | | SV-5065-20B inoperable. | | | | After review of system electrical diagrams, the licensee determined that the | | closure of valve SV-5065-20B was appropriate, although its closure was not | | anticipated in the tagout procedure. The NRC resident inspector has been | | informed of this event by the licensee. | | | | * * * RETRACTION 1653 5/18/2000 FROM ERIC OLSON TAKEN BY BOB STRANSKY * * * | | | | The licensee is retracting this notification in accordance with NUREG-1022, | | Section 3.3.2, Paragraph 5. The licensee has determined that this event did | | not constitute an ESF actuation because only a portion of the system logic | | tripped. The NRC resident inspector has been informed of this retraction by | | the licensee. Notified R1DO (Lew). | +------------------------------------------------------------------------------+ !!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!!!! +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 36986 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: PILGRIM REGION: 1 |NOTIFICATION DATE: 05/08/2000| | UNIT: [1] [] [] STATE: MA |NOTIFICATION TIME: 20:56[EDT]| | RXTYPE: [1] GE-3 |EVENT DATE: 05/08/2000| +------------------------------------------------+EVENT TIME: 20:25[EDT]| | NRC NOTIFIED BY: JOSEPH GIAR |LAST UPDATE DATE: 05/18/2000| | HQ OPS OFFICER: DOUG WEAVER +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |JOHN ROGGE R1 | |10 CFR SECTION: | | |AOUT 50.72(b)(1)(ii)(B) OUTSIDE DESIGN BASIS | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | OUTSIDE DESIGN BASIS - FOULING OF THE REACTOR BUILDING CLOSED COOLING WATER | | HEAT EXCHANGER (RBCCW HX). | | | | Surveillance testing has identified fouling of the Salt Service Water (SSW) | | side of the RBCCW HX. The extent of the fouling on one of the two heat | | exchangers would prevent design basis containment heat removal post-accident | | at maximum design basis ultimate heat sink (UHS) temperature (75�F). | | Engineering evaluation has determined that design basis heat removal can be | | achieved with UHS temperature less than 70�F. Periodic evaluation will be | | performed to ensure that additional fouling has not further degraded the | | heat exchangers heat transfer capability. | | | | The licensee will inform the NRC resident inspector. | | | | * * * RETRACTION 1653 5/18/2000 FROM ERIC OLSON TAKEN BY BOB STRANSKY * * * | | | | The licensee has determined that the unit was not operated outside of the | | design basis. At the time of the report, the seawater temperature was 50�F. | | Therefore, the licensee is retracting this notification in accordance with | | NUREG-1022, Section 3.2.4. The NRC resident inspector has been informed of | | this retraction by the licensee. Notified R1DO (Lew). | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 37010 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: NORTH ANNA REGION: 2 |NOTIFICATION DATE: 05/18/2000| | UNIT: [1] [2] [] STATE: VA |NOTIFICATION TIME: 09:43[EDT]| | RXTYPE: [1] W-3-LP,[2] W-3-LP |EVENT DATE: 05/18/2000| +------------------------------------------------+EVENT TIME: 07:30[EDT]| | NRC NOTIFIED BY: R. WESLEY |LAST UPDATE DATE: 05/18/2000| | HQ OPS OFFICER: LEIGH TROCINE +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |LEN WERT R2 | |10 CFR SECTION: | | |APRE 50.72(b)(2)(vi) OFFSITE NOTIFICATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | |2 N Y 100 Power Operation |100 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | OFFSITE NOTIFICATION REGARDING THE FAILURE OF A MAIN DAM SKIMMER GATE TO | | CLOSE | | | | The following text is a portion of a facsimile received from the licensee: | | | | "[The] Federal Energy Regulatory Commission (FERC) was notified at 0730 on | | 05/18/00 in accordance with 18CFR12.10(a)(1) for a condition affecting the | | safety of the project." | | | | "Skimmer gate 1B at the main dam failed to close under normal operating | | conditions. The gate is currently open, providing minimum flow. Corrective | | action is in progress." | | | | The licensee stated that the skimmer gate is used to provide minimum flow | | downstream to the river and to provide adequate level control of the main | | reservoir for the lake (which supplies cooling water to the plant). The | | required downstream flow of 40 scfm is currently being maintained. | | | | The licensee notified the NRC resident inspector. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Other Nuclear Material |Event Number: 37011 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: OKLAHOMA GAS & ELECTRIC |NOTIFICATION DATE: 05/18/2000| |LICENSEE: OKLAHOMA GAS & ELECTRIC |NOTIFICATION TIME: 17:16[EDT]| | CITY: REGION: 4 |EVENT DATE: 05/17/2000| | COUNTY: MUSKOGEE STATE: OK |EVENT TIME: [CDT]| |LICENSE#: 35-19819-03 AGREEMENT: N |LAST UPDATE DATE: 05/18/2000| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |BILL JONES R4 | | |BILL REAMER NMSS | +------------------------------------------------+FRANK CONGEL IRO | | NRC NOTIFIED BY: B. W. HALL | | | HQ OPS OFFICER: BOB STRANSKY | | +------------------------------------------------+ | |EMERGENCY CLASS: N/A | | |10 CFR SECTION: | | |BAB1 20.2201(a)(1)(i) LOST/STOLEN LNM>1000X | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | MISSING RADIOACTIVE SOURCE | | | | The licensee reported that a 200 mCi Cs-137 source was discovered to be | | missing from a group of sources removed from the Muskogee Power Plant for | | disposal. Several Omart model SHDP source holders (with sources) were | | transferred to Radiation Technology, Inc., a contractor, for disposal. These | | source holders had been stored in a warehouse at the power plant for some | | time before being transferred to the contractor. The licensee was notified | | on 5/17/2000 by the contractor that one of the source holders was empty. The | | licensee has searched their facility for the source but has been unable to | | locate it. | | | | The licensee has already contacted NRC Region 4 (L. Howell). | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021