The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for April 4, 2000

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           04/03/2000 - 04/04/2000

                              ** EVENT NUMBERS **

36847  36850  36857  36858  36859  36860  36861  

+------------------------------------------------------------------------------+
|General Information or Other                     |Event Number:   36847       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  LOUISIANA RADIATION PROTECTION DIV   |NOTIFICATION DATE: 03/30/2000|
|LICENSEE:  FORMOSA PLASTICS                     |NOTIFICATION TIME: 16:48[EST]|
|    CITY:  BATON ROUGE              REGION:  4  |EVENT DATE:        03/30/2000|
|  COUNTY:                            STATE:  LA |EVENT TIME:             [CST]|
|LICENSE#:  LA-4042-LO1           AGREEMENT:  Y  |LAST UPDATE DATE:  04/04/2000|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |KRISS KENNEDY        R4      |
|                                                |JOHN GREEVES         NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  COREY MEAUX                  |                             |
|  HQ OPS OFFICER:  DOUG WEAVER                  |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|NAGR                     AGREEMENT STATE        |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| AGREEMENT STATE REPORT                                                       |
|                                                                              |
| A 100 mCi Cs-137 source was found at the Southern Scrap Yard in Baton Rouge, |
| LA.  The source was part of a level gauge used by Formosa Plastics.  The     |
| source had not been opened and there was no spread of contamination.   The   |
| manufacturer of the source, Texas Nuclear Technologies, will recover the     |
| source.  The source is currently in a roped off area at the scrap yard.  The |
| State is still investigating how the source ended up in the scrap yard.      |
|                                                                              |
| * * *UPDATE 0928EDT ON 4/3/00 FROM PAT LARKINS TO S.SANDIN * * *             |
|                                                                              |
| THE FOLLOWING INFORMATION WAS FAXED TO THE NRC OPERATIONS CENTER ON 4/3/00   |
| BY THE NRC OFFICE OF STATE PROGRAMS:                                         |
|                                                                              |
| "APPROXIMATELY 1220 [HOURS] THURSDAY 3/30/00 LDEQ RECEIVED A CALL FROM THE   |
| NATIONAL                                                                     |
| RESPONSE CENTER DIRECTING US TO SOUTHERN SCRAP LOCATED ON SCENIC HWY IN      |
| BATON                                                                        |
| ROUGE, LA, CONCERNING A SOURCE DISCOVERED ON THEIR YARD. THE ATTACHMENT      |
| PLATE ON                                                                     |
| THE Cs-137 LEVEL GAUGE WAS DAMAGED BY A SHREADER AT SOUTHERN SCRAP. THIS     |
| ACTION                                                                       |
| EXPOSED THE SOURCE LEADING TO ITS DISCOVERY. SOUTHERN SCRAP WAS ABLE TO      |
| DETERMINE                                                                    |
| FROM LABELING THAT THE SOURCE WAS A Cs-137 (100 mCi SOURCE MANUFACTURED IN   |
| 1991 BY TN                                                                   |
| TECHNOLOGY AND BELONGED TO FORMOSA PLASTIC. THE SOURCE WAS A MODEL 5200      |
| LEVEL                                                                        |
| GAUGE, S/N B2209. AT 1430 [HOURS] A MEETING WAS HELD WITH FORMOSA PLASTIC TO |
| TRY TO                                                                       |
| DETERMINE HOW THE SOURCE ESCAPED THEIR POSSESSION. AT THIS TIME NO MEANS     |
| COULD BE                                                                     |
| DETERMINED. AT 2000 [HOURS] 3/30/00 A TN TECHNOLOGY REPRESENTATIVE RECOVERED |
| THE                                                                          |
| SOURCE. FOUR WIPE TEST[S] WERE PERFORMED ON THE SOURCE, ALL RESULTING IN THE |
| SOURCE                                                                       |
| NOT LEAKING. THERE WAS NO CONTAMINATION OF THE AREA. ON 3/31/00, JIM         |
| ALDREDGE                                                                     |
| CONTACTED LDEQ STATING THAT THE SHUTTER WAS NOT SHEERED OFF AND THE GAUGE    |
| WAS                                                                          |
| RETURNED TO THE LOCKED POSITION. MR ALDREDGE ALSO STATED THAT THE GAUGE WAS  |
| TO                                                                           |
| RETURNED TO FORMOSA PLASTIC ON 3/31/00."                                     |
|                                                                              |
| NOTIFIED R4DO (JONES) AND NMSS (HICKEY).                                     |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   36850       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PADUCAH GASEOUS DIFFUSION PLANT      |NOTIFICATION DATE: 03/31/2000|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 15:10[EST]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        03/30/2000|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        15:58[CST]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  04/03/2000|
|    CITY:  PADUCAH                  REGION:  3  +-----------------------------+
|  COUNTY:  McCRACKEN                 STATE:  KY |PERSON          ORGANIZATION |
|LICENSE#:  GDP-1                 AGREEMENT:  Y  |RONALD GARDNER       R3      |
|  DOCKET:  0707001                              |BRIAN SMITH          NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  ERIC WALKER                  |                             |
|  HQ OPS OFFICER:  DOUG WEAVER                  |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|OCBB 76.120(c)(2)(ii)    EQUIP DISABLED/FAILS   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| CRITICALITY ACCIDENT ALARM SYSTEM FAILURE DURING A TEST                      |
|                                                                              |
| At 1845 on 03-30-2000, during functional testing of C-746Q Criticality       |
| Accident Alarm System (CAAS), it was discovered that temperature control     |
| system on cluster "AD"  was unable to perform the ability to maintain the    |
| system above the manufacturer's fourteen degree Fahrenheit recommendation    |
| due to failure of a temperature switch.  The system was last tested on       |
| 12-30-99 and was determined to be functional at that time. In January of     |
| this year there were several days were outside ambient temperature dropped   |
| below fourteen degrees Fahrenheit and operability of system at those times   |
| cannot be reasonably determined.  Even though the failure was discovered     |
| during testing, it is possible that the system would not have performed its  |
| intended safety function if it had been required to since the last           |
| surveillance on 12-30-99.                                                    |
|                                                                              |
| This event is reportable under 10 CFR 76.120(c)(2) as an event in which      |
| equipment required by the TSR is disabled or fails to function as designed.  |
|                                                                              |
| The NRC Senior Resident Inspector has been notified of this event.           |
|                                                                              |
| * * * Update 1155EDT on 4/3/00 from Underwood to S.Sandin * * *              |
|                                                                              |
| Corrected event date and time.  Operations informed the NRC Resident         |
| Inspector.  Notified R3DO (Kozak).                                           |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36857       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: NORTH ANNA               REGION:  2  |NOTIFICATION DATE: 04/03/2000|
|    UNIT:  [] [2] []                 STATE:  VA |NOTIFICATION TIME: 10:02[EDT]|
|   RXTYPE: [1] W-3-LP,[2] W-3-LP                |EVENT DATE:        04/03/2000|
+------------------------------------------------+EVENT TIME:        08:57[EDT]|
| NRC NOTIFIED BY:  MILTON MUNDEN                |LAST UPDATE DATE:  04/03/2000|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |CAUDLE JULIAN        R2      |
|10 CFR SECTION:                                 |                             |
|ARPS 50.72(b)(2)(ii)     RPS ACTUATION          |                             |
|AESF 50.72(b)(2)(ii)     ESF ACTUATION          |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     A/R        Y       100      Power Operation  |0        Hot Standby      |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| AUTOMATIC REACTOR TRIP ON TURBINE TRIP DUE TO STATION SERVICE TRANSFORMER    |
| FAULT                                                                        |
|                                                                              |
| "REACTOR TRIP CAUSED BY LOSS OF 'C' STATION SERVICE TRANSFORMER DUE TO A     |
| FAULT.  THE AUXILIARY FEEDWATER SYSTEM ACTUATED AS DESIGNED."                |
|                                                                              |
| THE LICENSEE'S PRELIMINARY EVAULATION OF THE TRANSFORMER FAULT INDICATES     |
| INSULATION FAILURE.  FOLLOWING THE TRIP, NO PRIMARY/SECONDARY SAFETIES OR    |
| RELIEFS LIFTED.  ALL CONTROL RODS FULLY INSERTED.  ALL (3) AFW PUMPS STARTED |
| AS DESIGNED SUPPLYING MAKEUP TO THE STEAM GENERATORS.  THE MAIN CONDENSER IS |
| IN SERVICE ACTING AS A HEAT SINK FOR DECAY HEAT REMOVAL.  ALL ELECTRICAL     |
| LOADS REMAINED ENERGIZED WITH OFFSITE POWER SUPPLIED THROUGH THE RESERVE     |
| STATION TRANSFORMER.  THE EMERGENCY DIESEL GENERATORS ARE AVAILABLE, IF      |
| NEEDED.  UNIT 2 WILL REMAIN IN MODE 3 PENDING THE RESULTS OF THE             |
| INVESTIGATION INTO THE TRANSFORMER FAULT.                                    |
|                                                                              |
| THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.                            |
|                                                                              |
| * * * UPDATE 1052EDT ON 4/3/00 FROM MUNDEN TO S.SANDIN * * *                 |
|                                                                              |
| "AUXILIARY FEEDWATER SYSTEM AUTOMATIC ACTUATION [1014EDT] FOLLOWING SECURING |
| DUE TO LOW-LOW LEVEL IN 'C' STEAM GENERATOR."                                |
|                                                                              |
| THE AFW SYSTEM HAS BEEN SECURED WITH MAIN FEED IN SERVICE USING THE BYPASS   |
| VALVES.                                                                      |
|                                                                              |
| THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.  NOTIFIED R2DO (JULIAN).   |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36858       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PRAIRIE ISLAND           REGION:  3  |NOTIFICATION DATE: 04/03/2000|
|    UNIT:  [1] [2] []                STATE:  MN |NOTIFICATION TIME: 10:43[EDT]|
|   RXTYPE: [1] W-2-LP,[2] W-2-LP                |EVENT DATE:        04/03/2000|
+------------------------------------------------+EVENT TIME:        08:45[CDT]|
| NRC NOTIFIED BY:  STEVE GHEEN                  |LAST UPDATE DATE:  04/03/2000|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |THOMAS KOZAK         R3      |
|10 CFR SECTION:                                 |                             |
|AOUT 50.72(b)(1)(ii)(B)  OUTSIDE DESIGN BASIS   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| HIGH ENERGY LINE BREAK ANALYSES (HELB) REQUIRE DOORS IN AREAS CONTAINING     |
| MAIN STEAM LINES NOT BE BLOCKED OR OBSTRUCTED                                |
|                                                                              |
| "DOORS 155/177 OBSTRUCTED BY SCAFFOLDING CAUSING DOORS TO BE PARTIALLY       |
| BLOCKED.  DUE TO HELB CONSIDERATIONS, DOORS NEED TO BE ABLE TO SWING OPEN    |
| FULLY.  SCAFFOLDING WAS MOVED AT 0925CDT."                                   |
|                                                                              |
| THE LICENSEE WILL INFORM THE NRC RESIDENT INSPECTOR.                         |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Research Reactor                                 |Event Number:   36859       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: GEORGIA INSTITUTE OF TECHNOLOGY      |NOTIFICATION DATE: 04/03/2000|
|   RXTYPE: 5000 KW RESEARCH HW                  |NOTIFICATION TIME: 10:49[EDT]|
| COMMENTS:                                      |EVENT DATE:        04/03/2000|
|                                                |EVENT TIME:        09:49[EDT]|
|                                                |LAST UPDATE DATE:  04/03/2000|
|    CITY:  ATLANTA                  REGION:  2  +-----------------------------+
|  COUNTY:  FULTON                    STATE:  GA |PERSON          ORGANIZATION |
|LICENSE#:  R-97                  AGREEMENT:  Y  |CAUDLE JULIAN        R2      |
|  DOCKET:  05000160                             |MARVIN MENDONCA  NRR PM      |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  ROD ICE                      |                             |
|  HQ OPS OFFICER:  CHAUNCEY GOULD               |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|DDDD 73.71               UNSPECIFIED PARAGRAPH  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| SAFEGUARDS SYSTEM DEGRADATION RELATED TO DETECTION/MONITORING/ALARM          |
| FUNCTIONS..  COMPENSATORY MEASURES TAKEN IMMEDIATELY UPON DISCOVERY.         |
|                                                                              |
| CONTACT THE OPERATIONS CENTER FOR ADDITIONAL INFORMATION.                    |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Other Nuclear Material                           |Event Number:   36860       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  GE PLASTICS                          |NOTIFICATION DATE: 04/03/2000|
|LICENSEE:  GE PLASTICS                          |NOTIFICATION TIME: 13:28[EDT]|
|    CITY:  MT. VERNON               REGION:  3  |EVENT DATE:        03/29/2000|
|  COUNTY:                            STATE:  IN |EVENT TIME:             [CST]|
|LICENSE#:  13-10455-03           AGREEMENT:  N  |LAST UPDATE DATE:  04/03/2000|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |THOMAS KOZAK         R3      |
|                                                |BRIAN SMITH          NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  LAURA CULLEN                 |                             |
|  HQ OPS OFFICER:  FANGIE JONES                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|BAB2 20.2201(a)(1)(ii)   LOST/STOLEN LNM>10X    |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| MISSING 15 mCi NICKEL-63 SOURCE                                              |
|                                                                              |
| The licensee discovered that a HP model 5890 Gas Chromatograph (serial #     |
| 2541A06448), containing a 15 mCi Ni-63 source, was missing from the excess   |
| equipment storage on site.  The source is contained within an electron       |
| capture detector.  A search of the entire site was completed on 3/29/00      |
| without finding the device.                                                  |
|                                                                              |
| A written report will be made within thirty days.                            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|General Information or Other                     |Event Number:   36861       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  PPG ARCHITECTURAL FINISHES           |NOTIFICATION DATE: 04/03/2000|
|LICENSEE:  PPG ARCHITECTURAL FINISHES           |NOTIFICATION TIME: 13:20[EDT]|
|    CITY:  PITTSBURG                REGION:  1  |EVENT DATE:        04/03/2000|
|  COUNTY:                            STATE:  PA |EVENT TIME:             [EDT]|
|LICENSE#:                        AGREEMENT:  N  |LAST UPDATE DATE:  04/03/2000|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |VERN HODGE (FAX)     NRR     |
|                                                |                             |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  JOSEPH KARAS                 |                             |
|  HQ OPS OFFICER:  FANGIE JONES                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|CCCC 21.21               UNSPECIFIED PARAGRAPH  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| 10 CFR PART 21 REPORT                                                        |
|                                                                              |
| "This notification is being made by PPG Architectural Finishes (PPG)         |
| concerning relatively small quantities of a silicon stainless steel enamel   |
| coating used inside primary containment supplied to a single utility which   |
| is a NRC nuclear power plant licensee. The coating was not appropriately     |
| controlled such that its formulation changed from that which was originally  |
| supplied. The utility has been informed and is working with PPG. Further     |
| investigation is being conducted which may result in the withdrawal or       |
| modification of this notification. Written notification in accordance with   |
| 10 C.F.R. � 21.2 1(d)(3)(ii) will follow."                                   |
+------------------------------------------------------------------------------+


Page Last Reviewed/Updated Thursday, March 25, 2021