The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for December 10, 1999

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           12/09/1999 - 12/10/1999

                              ** EVENT NUMBERS **

35790  36455  36496  36497  

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   35790       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PADUCAH GASEOUS DIFFUSION PLANT      |NOTIFICATION DATE: 06/03/1999|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 14:44[EDT]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        06/02/1999|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        16:30[CDT]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  12/09/1999|
|    CITY:  PADUCAH                  REGION:  3  +-----------------------------+
|  COUNTY:  McCRACKEN                 STATE:  KY |PERSON          ORGANIZATION |
|LICENSE#:  GDP-1                 AGREEMENT:  Y  |DAVID HILLS          R3      |
|  DOCKET:  0707001                              |DON COOL             NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  THOMAS WHITE                 |                             |
|  HQ OPS OFFICER:  FANGIE JONES                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|OCBA 76.120(c)(2)(i)     ACCID MT EQUIP FAILS   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| THREE SPRINKLER SYSTEMS DECLARED INOPERABLE DUE TO CORRODED HEADS (24-hour   |
| report)                                                                      |
|                                                                              |
| The following text is a portion of a facsimile received from Paducah:        |
|                                                                              |
| "On 06/02/99 at 1630 CDT, the Plant Shift Superintendent (PSS) was notified  |
| that numerous sprinkler heads were corroded, affecting 16 sprinkler systems  |
| in C-337 and one system in C-333, such that the ability of the sprinklers to |
| flow sufficient water was called into question.  Subsequently, these         |
| sprinkler systems were declared inoperable, and TSR-required actions         |
| establishing roving fire patrols were initiated.  This deficiency was        |
| detected during scheduled system inspections conducted by Fire Protection    |
| personnel.  Currently, functionality of the sprinkler heads has not been     |
| fully evaluated by Fire Protection personnel, and the remaining cascade      |
| buildings are currently being inspected, and if necessary, this report will  |
| be updated to identify any additional areas.  It has been determined that    |
| this event is reportable under 10CFR76.120(c)(2) as an event in which        |
| equipment is disabled or fails to function as designed."                     |
|                                                                              |
| The NRC resident inspector has been notified of this event by Paducah        |
| personnel.                                                                   |
|                                                                              |
| * * * UPDATE AT 1022 EDT ON 06/04/99 FROM CAGE TO TROCINE * * *              |
|                                                                              |
| The following text is a portion of a facsimile received from Paducah:        |
|                                                                              |
| "Two sprinkler heads on system D-1 in C-337 and two sprinkler heads on       |
| system 27 in C-335 were identified to also be corroded.  These were          |
| identified to the PSS on 06/03/99 at 1600 CDT and 1601 CDT, respectively,    |
| and determined to require an update to this report by the PSS.  It has been  |
| determined that this event is reportable under 10CFR76.120(c)(2) as an event |
| in which equipment is disabled or fails to function as designed."            |
|                                                                              |
| Paducah personnel notified the NRC resident inspector of this update.  The   |
| NRC operations officer notified the R3DO (Hills) and NMSS EO (Combs).        |
|                                                                              |
| * * * UPDATE AT 2152 EDT ON 06/17/99 FROM WALKER TO POERTNER * * *           |
|                                                                              |
| The following text is a portion of a facsimile received from Paducah:        |
|                                                                              |
| "Three sprinkler heads on system C-15 and five sprinkler heads on system B-8 |
| in C-333 were identified to also be corroded.  The PSS was notified of this  |
| condition at 1300 CDT on 06/17/99 and determined that an update to this      |
| report was required.  It has been determined that this event is reportable   |
| under 10CFR76.120(c)(2) as an event in which equipment is disabled or fails  |
| to function as designed."                                                    |
|                                                                              |
| Paducah personnel notified the NRC resident inspector of this update.  The   |
| NRC operations officer notified the R3DO (Madera).                           |
|                                                                              |
| * * * UPDATE AT 1440 EDT ON 06/18/99 FROM UNDERWOOD TAKEN BY STRANSKY * * *  |
|                                                                              |
| The following text is a portion of a facsimile received from Paducah:        |
|                                                                              |
| "Two sprinkler heads on system C-15 and one sprinkler head on system B-8 in  |
| C-333 were identified to have corrosion.  The PSS was notified of this       |
| condition at 1350 CDT on 06/18/99.  The area of the fire patrol for system   |
| C-15 was expanded to include the two heads identified as corroded.  The one  |
| head on system B-8 was in the area already being patrolled.  The PSS         |
| determined that an update to this report was required."                      |
|                                                                              |
| The NRC resident inspector has been informed of this update by Paducah       |
| personnel.  The NRC operations officer notified the R3DO (Madera).           |
|                                                                              |
| * * * UPDATE AT 1315 EDT ON 06/25/1999 FROM WALKER TAKEN BY STRANSKY * * *   |
|                                                                              |
| The following text is a portion of a facsimile received from Paducah:        |
|                                                                              |
| "Two sprinkler heads on system D-8 and three sprinkler heads on system D-7   |
| in C-337 were identified to have corrosion.  The PSS was notified of the     |
| condition on system D-8 at 0125 CDT on 06/25/99 and at 1019 CDT on 06/25/99  |
| for system D-7.  Both systems were immediately declared inoperable and LCO   |
| fire patrol actions were implemented.  It was determined that an update to   |
| this report was required."                                                   |
|                                                                              |
| The NRC resident inspector has been informed of this update by Paducah       |
| personnel.  The NRC operations officer notified the R3DO (Jordan).           |
|                                                                              |
| * * * UPDATE AT 2119 EDT ON 07/30/99 FROM CAGE TAKEN BY STRANSKY * * *       |
|                                                                              |
| The following text is a portion of a facsimile received from Paducah:        |
|                                                                              |
| "Five sprinkler heads and one sprinkler piping tee on C-337 system D-7 were  |
| identified to have corrosion. The PSS was notified of these corroded system  |
| parts and declared the system inoperable at 0931 CDT on 07/30/99.  LCO       |
| required fire patrols of the affected area were initiated.  The PSS          |
| determined that an update to this event report was required."                |
|                                                                              |
| The NRC resident inspector has been informed of this update by Paducah       |
| personnel.  The NRC operations officer notified the R3DO (Wright).           |
|                                                                              |
| * * * UPDATE AT 1655 EDT ON 07/31/99 FROM WHITE TAKEN BY STRANSKY * * *      |
|                                                                              |
| The following text is a portion of a facsimile received from Paducah:        |
|                                                                              |
| "Two sprinkler heads on C-337 System D-1 were identified to have corrosion.  |
| The PSS was notified of these corroded system parts and declared the system  |
| inoperable at 1155 CDT on 7/31/99.  LCO required fire patrols of the         |
| affected area were initiated.  The PSS determined that an update to this     |
| report was required."                                                        |
|                                                                              |
| The NRC resident inspector has been informed of this update by Paducah       |
| personnel.  The NRC operations officer notified the R3DO (Wright).           |
|                                                                              |
| * * * UPDATE AT 1546 EDT ON 08/10/99 FROM WHITE TAKEN BY STRANSKY * * *      |
|                                                                              |
| The following text is a portion of a facsimile received from Paducah:        |
|                                                                              |
| "Two sprinkler heads on C-337 system C-15 were identified to have corrosion. |
| The PSS was notified of these corroded system parts and declared the system  |
| inoperable at 1130 CDT on 8/10/99.  LCO required fire patrols of the         |
| affected area were initiated.  The PSS determined that an update to this     |
| report was required."                                                        |
|                                                                              |
| The NRC resident inspector has been informed of this update by Paducah       |
| personnel.  The NRC operations officer notified the R3DO (Burgess).          |
|                                                                              |
| * * * UPDATE AT 1154 EDT ON 08/22/99 FROM WALKER TO POERTNER * * *           |
|                                                                              |
| Four adjacent sprinkler heads on the C-333 building System B-1 were          |
| identified to have corrosion.  The PSS was notified of the corroded system   |
| parts and declared the system inoperable at 0918 CDT on 08/22/99.  LCO       |
| required fire patrols were initiated.                                        |
|                                                                              |
| The NRC resident inspector will be notified by Paducah personnel.  The NRC   |
| operations officer notified the R3DO (Clayton).                              |
|                                                                              |
| * * * UPDATE AT 2015 EDT ON 08/28/99 FROM W. F. GAGE TO S. SANDIN * * *      |
|                                                                              |
| Two adjacent sprinkler heads on the C-337 building System D-11 were          |
| identified to have corrosion.  The PSS was notified of these corroded system |
| parts and declared the system inoperable at 1420 CDT on 08/28/99.   LCO      |
| required fire patrols of the affected area were initiated.                   |
|                                                                              |
| Paducah personnel informed the NRC resident inspector.  The NRC operations   |
| officer notified the R3DO (Leach) and NMSS EO (Piccone).                     |
|                                                                              |
| * * * UPDATE AT 2037 EDT ON 08/29/99 FROM KEVIN BEASLEY TO S. SANDIN * * *   |
|                                                                              |
| Two adjacent sprinkler heads on the C-337 building System D-15 were          |
| identified to have corrosion and the PSS declared the system inoperable at   |
| 0925 CDT on 08/29/99.  Also two adjacent heads on the C-337 building System  |
| D-10 were identified to have corrosion and the PSS declared the system       |
| inoperable at 1450 CDT.   LCO required fire patrols for both of the affected |
| areas were initiated in the time frame required by TSR.                      |
|                                                                              |
| Paducah personnel informed the NRC resident inspector.  The NRC operations   |
| officer notified the R3DO (Leach) and NMSS EO (Piccone).                     |
|                                                                              |
| * * * UPDATE AT 0930 EDT ON 09/01/99  FROM ERIC WALKER TO FANGIE JONES * *   |
| *                                                                            |
|                                                                              |
| Add two adjacent sprinkler heads on the C-337 building System D-14 were      |
| declared inoperable.                                                         |
|                                                                              |
| Paducah personnel informed the NRC resident inspector.  The NRC operations   |
| officer notified the R3DO (David Hills) and NMSS EO (Robert Pierson).        |
|                                                                              |
| * * * UPDATE AT 1133 EDT ON 09/08/99  FROM TOM WHITE TO FANGIE JONES * * *   |
|                                                                              |
| Add two adjacent sprinkler heads on the C-331 building System 26 were        |
| declared inoperable at 2155 CDT on 09/07/99.  An LCO required fire patrol    |
| for the affected area was initiated in the time frame required by the TSR.   |
|                                                                              |
| Paducah personnel informed the NRC resident inspector.  The NRC operations   |
| officer notified the R3DO (Monte Phillips) and NMSS EO (Josie Piccone).      |
|                                                                              |
| * * * UPDATE AT 0948 ON 09/30/99 FROM ERIC WALKER TO DOUG WEAVER * * *       |
|                                                                              |
| Add two adjacent sprinkler heads on the C-333 building System B-15 were      |
| identified to have corrosion and the PSS declared the system inoperable at   |
| 0815 CDT on 9/30/99.  An LCO required fire patrol for the affected area was  |
| initiated in the time frame required by the TSR.                             |
|                                                                              |
| Paducah personnel informed the NRC resident inspector.   The NRC operations  |
| officer notified the R3DO (Vegel) and NMSS EO (Cool).                        |
|                                                                              |
| * * * UPDATE AT 1600 ON 10/13/99 FROM WALKER TO GOULD * * *                  |
|                                                                              |
| Two adjacent sprinkler heads on the C-333 building System A-11 were          |
| identified to have corrosion and the PSS declared the system inoperable at   |
| 1307 CDT on 10/13/99.  An LCO required fire patrol for the affected area was |
| initiated in the time frame required by the TSR.                             |
|                                                                              |
| Paducah personnel informed the NRC resident inspector.   The NRC operations  |
| officer notified the R3DO (Madera) and NMSS EO (Moore).                      |
|                                                                              |
| * * * UPDATE AT 1520 ON 10/19/99 FROM UNDERWOOD TAKEN BY STRANSKY * * *      |
|                                                                              |
| Six sprinkler heads on the C-337 building System D-16 were identified to     |
| have corrosion and the PSS declared the system inoperable at 1052 CDT on     |
| 10/19/99.  An LCO required fire patrol for the affected area was initiated   |
| in the time frame required by the TSR.                                       |
|                                                                              |
| The NRC resident inspector has been informed of this update by Paducah       |
| personnel.  The NRC operations officer notified the R3DO (Jorgensen).        |
|                                                                              |
| * * * UPDATE AT 2140 ON 10/19/99 FROM WALKER TAKEN BY STRANSKY * * *         |
|                                                                              |
| Seven sprinkler heads on the C-337 building System A-7 were identified to    |
| have corrosion, and another four had been painted over.  In addition, three  |
| adjacent sprinkler heads on the C-337 building System A-8 were identified to |
| have corrosion.  The PSS declared the systems inoperable at 1900 CDT on      |
| 10/19/99.  An LCO required fire patrols for the affected areas were          |
| initiated in the time frame required by the TSR.                             |
|                                                                              |
| The NRC resident inspector has been informed of this update by Paducah       |
| personnel.  The NRC operations officer notified the R3DO (Wright).           |
|                                                                              |
| * * * UPDATE AT 1713 ON 10/21/99 FROM CAGE TAKEN BY JOLLIFFE * * *           |
|                                                                              |
| Four sprinkler heads on the C-337 building System A-5, twelve sprinkler      |
| heads on the C-337 building System A-8, three sprinkler heads on the C-337   |
| building System A-9, and six sprinkler heads on the C-337 building System    |
| B-8 were identified to have corrosion.  On 10/21/99, the PSS declared        |
| Systems A-5 and A-9 inoperable at 1028 CDT, System A-8 inoperable at 1227    |
| CDT and System B-8 inoperable at 1406 CDT.   An LCO required fire patrol for |
| the affected areas was initiated in the time frame required by the TSR.      |
|                                                                              |
| The NRC resident inspector has been informed of this update by Paducah       |
| personnel.  The NRC operations officer notified the R3DO (Bruce Jorgensen).  |
|                                                                              |
| * * * UPDATE AT 2128 ON 10/22/99 FROM ERIC WALKER TAKEN BY JOLLIFFE * * *    |
|                                                                              |
| At 1400 CDT on 10/22/99, the PSS was notified that numerous corroded         |
| sprinkler heads were discovered in the C-337 building on sprinkler systems   |
| B-1, B-3, B-5, B-6, B-7, B-11, and D-17.  Due to the number of systems       |
| called into question, the PSS declared all of the sprinkler systems in C-337 |
| on the cell floor (a total of 66 systems) inoperable and TSR required        |
| actions establishing roving fire patrols were initiated within the required  |
| time frame.                                                                  |
|                                                                              |
| The NRC resident inspector has been informed of this update by Paducah       |
| personnel.  The NRC operations officer notified the R3DO (Bruce Jorgensen).  |
|                                                                              |
| * * * UPDATE AT 1239 ON 10/24/99 FROM TOM WHITE TAKEN BY JOLLIFFE * * *      |
|                                                                              |
| At 1200 CDT on 10/23/99, the PSS was notified that numerous corroded         |
| sprinkler heads were discovered in the C-337 building on sprinkler systems   |
| B-13 and B-14 on the ground floor,  The PSS declared these systems           |
| inoperable and TSR required actions establishing roving fire patrols were    |
| initiated within the required time frame.  At 1600 CDT on 10/23/99, the PSS  |
| was notified that numerous corroded sprinkler heads were discovered in the   |
| C-337 building on sprinkler systems A-16, B-12, C-8, C-12, C-15, D-5, and    |
| D-8 on the cell floor,  These systems have already been declared inoperable  |
| and fire patrols are already being performed.                                |
|                                                                              |
| The NRC resident inspector has been notified of this update by Paducah       |
| personnel.  The NRC operations officer notified the R3DO (Bruce Jorgensen).  |
|                                                                              |
| * * * UPDATE AT 1117 ON 10/25/99 FROM W. F. CAGE TAKEN BY SANDIN * * *       |
|                                                                              |
| At 1940 CDT on 10/24/99, the PSS was notified that numerous corroded         |
| sprinkler heads had been discovered on High Pressure Fire Water Systems C-4, |
| C-5, C-6 and C-8, located in the C-337 building.  These systems had          |
| previously been declared inoperable and fire patrols were already being      |
| performed at the time of discovery.                                          |
|                                                                              |
| The NRC resident inspector has been notified of this update by Paducah       |
| personnel.  The NRC operations officer notified the R3DO (Lanksbury) and     |
| NMSS EO (Brain Smith).                                                       |
|                                                                              |
| * * * UPDATE AT 2235 ON 10/27/99 FROM WHITE TAKEN BY MACKINNON * * *         |
|                                                                              |
| At 1517 CDT on 10/27/99, the PSS was notified that nine corroded sprinkler   |
| heads had been discovered on High Pressure Fire Water System A-12 located in |
| the C-333 building.  This system has been declared inoperable and fire       |
| patrols have been initiated.                                                 |
|                                                                              |
| The NRC resident inspector has been notified of this update by Paducah       |
| personnel.  The NRC operations officer notified the R3DO (Jordan) and NMSS   |
| EO (Hickey).                                                                 |
|                                                                              |
| * * * UPDATE AT 2150 ON 10/30/99 FROM UNDERWOOD TAKEN BY WEAVER * * *        |
|                                                                              |
| At 1950 CDT on 10/30/99, the PSS was notified that numerous corroded         |
| sprinkler heads had been discovered on High Pressure Fire Water Systems A-5, |
| A-9, A-11, C-5, and C-7 in the C-333 building.  Reference ATR-1 1999-6699    |
| and 6702.  These systems have been declared inoperable and fire patrols have |
| been initiated.  Also, due to the number of inoperable sprinkler heads, the  |
| remaining systems on the cell floor of C-333 were called into question and   |
| declared inoperable.  Fire patrols for the entire cell floor have been       |
| initialed.  The PSS determined that an update to this report was required.   |
|                                                                              |
| The NRC resident inspector has been notified of this update by Paducah       |
| personnel.  The NRC operations officer notified the R3DO (Jordan) and NMSS   |
| EO (Hickey).                                                                 |
|                                                                              |
| * * * UPDATE AT 2111 ON 10/31/99 FROM UNDERWOOD TAKEN BY WEAVER * * *        |
|                                                                              |
| At 1412 CDT on 10/31/99, the PSS was notified that five corroded sprinkler   |
| heads had been discovered on High Pressure Fire Water System 9 in the C-335  |
| building.  There were two adjacent corroded heads discovered in two separate |
| locations and a third individual head at a different location.  The system   |
| was declared inoperable and fire patrols were initiated.  The corroded heads |
| have since been replaced and the system returned to operable status.         |
|                                                                              |
| The NRC resident inspector was notified of this update by Paducah personnel. |
| The NRC operations officer notified the R3DO (Jordan) and NMSS EO (Hickey).  |
|                                                                              |
| * * * UPDATE AT 2121 ON 11/01/99 FROM KEVIN BEASLEY TAKEN BY JOLLIFFE * * *  |
|                                                                              |
|                                                                              |
| At 0930 CST on 11/01/99, the PSS was notified that three corroded sprinkler  |
| heads had been discovered on the High Pressure Fire Water System B-4 in the  |
| C-337 building.  Two of these sprinkler heads are adjacent.  Two adjacent    |
| corroded sprinkler heads were also discovered on the High Pressure Fire      |
| Water System B-5 in the C-337 building.  These systems were declared         |
| inoperable and fire patrols were initiated.  Work has been initiated to      |
| replace the corroded heads.                                                  |
|                                                                              |
| The NRC resident inspector has been notified of this update by Paducah       |
| personnel.  The NRC operations officer notified the R3DO (Jim Creed).        |
|                                                                              |
| * * * UPDATE AT 2143 ON 11/02/99 FROM KEVIN BEASLEY TAKEN BY JOLLIFFE * * *  |
|                                                                              |
|                                                                              |
| At 1400 CST on 11/02/99, the PSS was notified that numerous corroded         |
| sprinkler heads had been discovered on High Pressure Fire Water Systems C-8  |
| and D-7 in the C-333 building.  These systems had been previously declared   |
| inoperable and fire patrols were being performed at the time of discovery.   |
| Work has been initiated to replace the corroded heads.                       |
|                                                                              |
| The NRC resident inspector has been notified of this update by Paducah       |
| personnel.  The NRC operations officer notified the R3DO (Jim Creed).        |
|                                                                              |
| * * * UPDATE AT 2110 EST ON 11/04/99 FROM ERIC WALKER TO S. SANDIN * * *     |
|                                                                              |
| The following text is a portion of a facsimile received from Paducah:        |
|                                                                              |
| "At 1700 [CST] on 11/04/99, the [PSS] was notified that numerous corroded    |
| sprinkler heads had been discovered on High Pressure Fire Water systems      |
| A-16, C-17, D-12, and D-16 in the C-333 building.  These systems had been    |
| previously declared inoperable, and fire patrols were being performed at the |
| time of discovery.  Work his been initiated to replace the corroded heads.   |
| The PSS determined that an update to this report was required."              |
|                                                                              |
| "It has been determined that this event is reportable under                  |
| 10CFR76.120(c)(2) as an event in which equipment is disabled or fails to     |
| function as designed."                                                       |
|                                                                              |
| The NRC senior resident inspector has been notified of this event by Paducah |
| personnel.  The NRC operations officer notified the R3DO (Creed) and NMSS EO |
| (Hodges).                                                                    |
|                                                                              |
| * * * UPDATE AT 2328 EST ON 11/23/99 FROM WHITE TAKEN BY MACKINNON * * *     |
|                                                                              |
| At 2240 CST on 11/22/99, the PSS was notified that numerous corroded         |
| sprinkler heads had been discovered on High Pressure Fire Water System B-7   |
| and B-8 in the C-337 building.  These systems were declared inoperable, and  |
| fire patrols were initiated at the time of discovery.  The PSS determined    |
| that an update to this report was required.                                  |
|                                                                              |
| The NRC resident inspector was notified of this update by the certificate    |
| holder.  The R3DO (Ron Gardner) and NMSS EO (Joe Holonich) were notified by  |
| the NRC operations officer.                                                  |
|                                                                              |
| ******************** UPDATE AT 1017 ON 11/24/99 FROM ERIC WALKER TO LEIGH    |
| TROCINE ********************                                                 |
|                                                                              |
| The following text is a portion of a facsimile received from Paducah:        |
|                                                                              |
| "At 1045 [CST] on 11/23/99, the [PSS] was notified that more than five       |
| corroded sprinkler heads per system had been discovered on both High         |
| Pressure Fire Water systems B-3 and 8-4 in the C-337 building.  Per the      |
| Authority Having Jurisdiction (AHJ), the discovery of five or more heads on  |
| one system renders the system inoperable.  These systems were declared       |
| inoperable, and actions were taken as required by the TSR.  The PSS          |
| determined that an update to this report was required."                      |
|                                                                              |
| "It has been determined that this event is reportable under                  |
| 10CFR76.120(c)(2) as an event in which equipment is disabled or fails to     |
| function as designed."                                                       |
|                                                                              |
| Paducah personnel notified the NRC resident inspector.  The R3DO (Gardner)   |
| and NMSS EO (Hickey) were notified by the NRC operations officer.            |
|                                                                              |
| ***************** UPDATE AT 2147 ON 12/08/99 FROM MIKE UNDERWOOD TO LEIGH    |
| TROCINE ****************                                                     |
|                                                                              |
| The following text is a portion of a facsimile received from Paducah:        |
|                                                                              |
| "At 1000 [CST] on 12/08/99, the [PSS] was notified that five corroded        |
| sprinkler heads had been discovered on High Pressure Fire Water system B-1   |
| in the C-337 building.  Two heads are at column Y-X/4, two heads at column   |
| Wb-4, and one head at column Wa-4 on the ground floor.  Per the Authority    |
| Having Jurisdiction (AHJ), the discovery of five or more heads on the system |
| renders the system inoperable.  The system was declared inoperable, and      |
| actions were taken by the TSR.  The PSS determined that an update to this    |
| required."                                                                   |
|                                                                              |
| "It has been determined that this event is reportable under                  |
| 10CFR76.120(c)(2) as an event in which equipment is disabled or fails to     |
| function as designed."                                                       |
|                                                                              |
| Paducah personnel notified the NRC resident inspector.  The R3DO (Hiland)    |
| and NMSS EO (Sherr) were notified by the NRC operations officer.             |
|                                                                              |
| * * * UPDATE AT 2315 ON 12/09/99 FROM TOM WHITE TAKEN BY JOLLIFFE * * *      |
|                                                                              |
| At 1405 CST on 12/09/99, the PSS was notified that twelve (12) corroded      |
| sprinkler heads had been discovered on High Pressure Fire Water System #B-1  |
| in the C-337 building. Two heads are at column X-6, three heads at column    |
| Wb-3, four heads at column Wa-5, one head at column Wb-8, one head at column |
| X-6, and one head at column W4, all on the ground floor.  Per the Authority  |
| Having Jurisdiction, the discovery of five or more heads on one system       |
| renders the system inoperable and three locations have two adjacent heads    |
| corroded and this renders the system inoperable as well.  The system was     |
| declared inoperable and actions were taken as required by the technical      |
| safety requirement. The PSS determined that an update to this report was     |
| required.                                                                    |
|                                                                              |
| The NRC Resident lnspector has been notified of this event.                  |
|                                                                              |
| The NRC Operations Officer notified the R3DO Pat Hiland.                     |
+------------------------------------------------------------------------------+

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   36455       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PORTSMOUTH GASEOUS DIFFUSION PLANT   |NOTIFICATION DATE: 11/20/1999|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 09:47[EST]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        11/19/1999|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        16:00[EST]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  12/09/1999|
|    CITY:  PIKETON                  REGION:  3  +-----------------------------+
|  COUNTY:  PIKE                      STATE:  OH |PERSON          ORGANIZATION |
|LICENSE#:  GDP-2                 AGREEMENT:  N  |THOMAS KOZAK         R3      |
|  DOCKET:  0707002                              |JOSEPHINE PICCONE    NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  JIM MCCLEERY                 |                             |
|  HQ OPS OFFICER:  FANGIE JONES                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|NONR                     OTHER UNSPEC REQMNT    |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| 24 HOUR REPORT - VALID SAFETY SYSTEM ALARM                                   |
|                                                                              |
| "ON 11/19/99 AT 1600,  X-326 CASCADE BUILDING OPERATIONS RECEIVED A SMOKE    |
| HEAD ALARM ACTUATION AT THE ERP 1A WITHDRAWAL STATION DURING A CYLINDER      |
| CONNECTION EVOLUTION.  WHILE CONNECTING THE PIGTAIL TO THE CYLINDER, A       |
| SLIGHT WISP OF UF6 SMOKE APPEARED BETWEEN THE PIGTAIL AND THE MANIFOLD       |
| SAFETY VALVE.  EMERGENCY RESPONSE PERSONNEL RESPONDED AND MONITORED THE      |
| AREA.  ALL AIR SAMPLE RESULTS FOR HYDROGEN FLUORIDE AND UF6 WERE BELOW       |
| DETECTABLE LEVELS.  THIS EVENT IS REPORTABLE DUE TO THE VALID ACTUATION OF A |
| "Q" SAFETY SYSTEM.  THERE WAS NO LOSS OF HAZARDOUS/RADIOACTIVE MATERIAL OR   |
| RADIOACTIVE/RADIOLOGICAL CONTAMINATION EXPOSURE AS A RESULT OF THIS EVENT."  |
|                                                                              |
| THE LICENSEE NOTIFIED THE NRC RESIDENT INSPECTOR AND THE DOE SITE            |
| REPRESENTATIVE.                                                              |
|                                                                              |
| * * * UPDATE AT 1600 ON 12/09/99 BY ERIC SPATH TO JOLLIFFE * * *             |
|                                                                              |
| PORTSMOUTH PERSONNEL DESIRE TO RETRACT THIS EVENT BASED ON THE DETERMINATION |
| THAT THE ACTUAL PLANT CONDITIONS WHICH THE SAFETY SYSTEM IS DESIGNED TO      |
| PROTECT AGAINST DID NOT EXIST.  THE 1A WITHDRAWAL POSITION PIGTAIL WAS       |
| ISOLATED FROM THE LIQUID UF6 SYSTEM BY A CLOSED MANIFOLD VALVE AND NO LIQUID |
| UF6 WAS INVOLVED IN THE OUT GASSING.  A WITHDRAWAL WAS TAKING PLACE AT THE   |
| ADJACENT 1B POSITION, WHICH SHARES THE SAME COMPRESSORS, PIPING, AND         |
| ACCUMULATOR, BUT THE LEAK WAS NOT ASSOCIATED WITH THIS POSITION.  THE TECH   |
| SPEC REQUIREMENT BASIS STATEMENT INDICATES THAT THE PURPOSE OF THE PIGTAIL   |
| LINE ISOLATION SYSTEM IS TO MINIMIZE A RELEASE OF LIQUID UF6 DUE TO A        |
| PIGTAIL FAILURE DURING A WITHDRAWAL.  SINCE THE PIGTAIL WAS ISOLATED FROM    |
| THE LIQUID UF6 SYSTEM WHILE THE CYLINDER WAS BEING CONNECTED, THE PIGTAIL    |
| LINE ISOLATION SYSTEM SAFETY FUNCTION WAS NOT REQUIRED.                      |
|                                                                              |
| PORTSMOUTH PERSONNEL NOTIFIED THE NRC RESIDENT INSPECTOR.  THE NRC           |
| OPERATIONS OFFICER NOTIFIED THE R3DO PAT HILAND AND THE NMSS EO TED SHERR.   |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36496       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SOUTH TEXAS              REGION:  4  |NOTIFICATION DATE: 12/09/1999|
|    UNIT:  [1] [] []                 STATE:  TX |NOTIFICATION TIME: 12:46[EST]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        12/09/1999|
+------------------------------------------------+EVENT TIME:        11:25[CST]|
| NRC NOTIFIED BY:  HOWARD ALLGEYER              |LAST UPDATE DATE:  12/09/1999|
|  HQ OPS OFFICER:  DICK JOLLIFFE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |BILL JOHNSON         R4      |
|10 CFR SECTION:                                 |                             |
|DDDD 73.71               UNSPECIFIED PARAGRAPH  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| - SECURITY REPORT -                                                          |
|                                                                              |
| UNESCORTED ACCESS GRANTED TO A CONTRACTOR INAPPROPRIATELY.  COMPENSATORY     |
| MEASURES IMMEDIATELY TAKEN UPON DISCOVERY.  CORRECTIVE ACTIONS BEING         |
| DETERMINED.  THE LICENSEE PLANS TO NOTIFY THE NRC RESIDENT INSPECTOR.        |
| CONTACT THE NRC OPERATIONS OFFICER FOR ADDITIONAL DETAILS.                   |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36497       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: FITZPATRICK              REGION:  1  |NOTIFICATION DATE: 12/09/1999|
|    UNIT:  [1] [] []                 STATE:  NY |NOTIFICATION TIME: 22:54[EST]|
|   RXTYPE: [1] GE-4                             |EVENT DATE:        12/09/1999|
+------------------------------------------------+EVENT TIME:        22:30[EST]|
| NRC NOTIFIED BY:  MARK ABRANSKI                |LAST UPDATE DATE:  12/09/1999|
|  HQ OPS OFFICER:  DICK JOLLIFFE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |CLIFFORD ANDERSON    R1      |
|10 CFR SECTION:                                 |                             |
|ASHU 50.72(b)(1)(i)(A)   PLANT S/D REQD BY TS   |                             |
|AOUT 50.72(b)(1)(ii)(B)  OUTSIDE DESIGN BASIS   |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| -TECH SPEC REQD PLANT SHUTDOWN DUE TO INCORRECT FLOW BIASED APRM SCRAM       |
| SETPOINTS-                                                                   |
|                                                                              |
| Engineering analysis based on in-situ plant data identified a discrepancy in |
| the 100% drive flow value used to develop the flow biased APRM scram         |
| setpoints specified in the core operating limits report.  The discrepancy is |
| such that the flow biased scram line on the power-to-flow map has a greater  |
| slope than specified in the core operating limits report. This condition     |
| results in a non-conservative APRM scram setpoint at lower core flows. The   |
| APRM scram function (Tech Spec Table 3.1-1) is considered inoperable until   |
| this condition can be corrected.  Tech Specs require that all operable       |
| control rods be inserted within 4 hours or reduce power to IRM range and     |
| place the mode switch in startup within 8 hours.  New APRM gain values are   |
| being established which will correct this discrepancy.                       |
|                                                                              |
| The licensee notified the NRC Resident Inspector.                            |
+------------------------------------------------------------------------------+


Page Last Reviewed/Updated Wednesday, March 24, 2021