The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for November 23, 1999

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           11/22/1999 - 11/23/1999

                              ** EVENT NUMBERS **

36456  36457  

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36456       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: COOK                     REGION:  3  |NOTIFICATION DATE: 11/22/1999|
|    UNIT:  [1] [2] []                STATE:  MI |NOTIFICATION TIME: 06:33[EST]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        11/22/1999|
+------------------------------------------------+EVENT TIME:        06:05[EST]|
| NRC NOTIFIED BY:  MARY BETH DEPUYDT            |LAST UPDATE DATE:  11/22/1999|
|  HQ OPS OFFICER:  FANGIE JONES                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |THOMAS KOZAK         R3      |
|10 CFR SECTION:                                 |                             |
|DDDD 73.71               UNSPECIFIED PARAGRAPH  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          N       0        Refueling        |0        Refueling        |
|2     N          N       0        Refueling        |0        Refueling        |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| SECURITY REPORT                                                              |
|                                                                              |
| Safeguards system degradation related to access control, immediate           |
| compensatory measures taken upon discovery.                                  |
|                                                                              |
| The licensee intends to notify the NRC Resident Inspector.                   |
|                                                                              |
| Refer to the HOO Log for additional details.                                 |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36457       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: BROWNS FERRY             REGION:  2  |NOTIFICATION DATE: 11/22/1999|
|    UNIT:  [] [2] []                 STATE:  AL |NOTIFICATION TIME: 23:18[EST]|
|   RXTYPE: [1] GE-4,[2] GE-4,[3] GE-4           |EVENT DATE:        11/18/1999|
+------------------------------------------------+EVENT TIME:        19:00[CST]|
| NRC NOTIFIED BY:  CHRIS VAUGHN                 |LAST UPDATE DATE:  11/22/1999|
|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |EDWARD MCALPINE      R2      |
|10 CFR SECTION:                                 |                             |
|AIND 50.72(b)(2)(iii)(D) ACCIDENT MITIGATION    |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| HIGH PRESSURE COOLANT INJECTION (HPCI) OIL SYSTEM PRESSURE BOUNDARY          |
| BREACHED                                                                     |
|                                                                              |
| At approximately 1636 CST on 11/18/99, during replacement of the Unit 2 HPCI |
| Oil Cooler Discharge Temperature Switch by Instrument Maintenance, the       |
| pressure boundary of the HPCI oil system was inadvertently breached for a    |
| total of approximately five minutes (the work package assumed that the       |
| Temperature Switch had a well, but it when the Temperature Switch was        |
| removed it was discovered that Switch did not have a well).  The breach      |
| occurred because adequate documentation was not included in the work         |
| package.   The switch was successfully replaced and the work document        |
| subsequently completed and closed out at 2005 CST on 11/18/99.  Upon further |
| evaluation of this work activity by Site Engineering and Operations          |
| personnel, it has been determined that the HPCI system would not have been   |
| capable of performing its intended design function during the time frame the |
| oil system was breached.                                                     |
|                                                                              |
| The NRC Resident Inspector was notified of this event by the licensee.       |
+------------------------------------------------------------------------------+


Page Last Reviewed/Updated Wednesday, March 24, 2021