Event Notification Report for September 15, 1999
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 09/14/1999 - 09/15/1999 ** EVENT NUMBERS ** 36155 36156 36157 36160 36161 36162 36163 +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 36155 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: TURKEY POINT REGION: 2 |NOTIFICATION DATE: 09/13/1999| | UNIT: [3] [4] [] STATE: FL |NOTIFICATION TIME: 17:08[EDT]| | RXTYPE: [3] W-3-LP,[4] W-3-LP |EVENT DATE: 09/13/1999| +------------------------------------------------+EVENT TIME: 16:50[EDT]| | NRC NOTIFIED BY: MATUSZEWSKI |LAST UPDATE DATE: 09/14/1999| | HQ OPS OFFICER: JOHN MacKINNON +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: UNU |ROBERT HAAG R2 | |10 CFR SECTION: |JOSEPH GIITTER IRO | |AAEC 50.72 (a) (1) (I) EMERGENCY DECLARED |KEN CIBOCH FEMA | | |FRANK CONGEL IRO | | |ELINOR ADENSAM NRR | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |3 N Y 100 Power Operation |100 Power Operation | |4 N Y 100 Power Operation |100 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | UNUSUAL EVENT DECLARED DUE TO ENTERING EAL 12A (NATURAL PHENOMENON - | | HURRICANE WARNING CONFIRMED). | | | | The licensee entered an Unusual Event per Emergency Action Level 12A. All | | emergency diesel generators are fully operable and the electrical grid is | | stable. All emergency core cooling systems are fully operable except for | | CCW heat exchanger "3B". Heat Exchanger "3B" will be restored to service | | soon. The state of Florida and surrounding counties have been informed of | | the Unusual Event classification. | | | | The NRC Resident Inspector will be informed by the licensee. | | | | * * * UPDATE 0930 9/14/1999 BY STRANSKY * * * | | | | The NRC entered the Monitoring Phase of Normal Mode at 0930 on 9/14/1999 in | | preparation of potential landfall by Hurricane Floyd. | | | | * * * COMMISSIONER'S ASSISTANTS BRIEF, 1000 EDT ON 9/14/99 * * * | | | | Luis Reyes the R2RA conducted the brief, IRO (Frank Congel), NRR (Tad | | Marsh), NMSS (Josie Piccone), PA (William Beecher), SP (Fred Combs), R2 IRC | | (Pierce Skinner), CA (Betsy Keeling), EDO Staff (Leonard Wert), IP (Karen | | Henderson), SECY (Andrew Bates), Chairman Dicus Off (Thomas Hiltz), Comm. | | McGaffigan Off (James Beall), Comm. Diaz Off (Anthony Hsia), Comm. | | Merrifield Off (Lynne Stauss) | | | | | | ***UPDATE 1744 9/14/99 BY D. MORRIS TAKEN BY MACKINNON*** | | | | Unusual Event was terminated and EAL 12A was exited at 1710 ET when the | | hurricane warning was downgraded to a tropical storm warning by the National | | Hurricane Center. The Licensee notified the state and surrounding counties | | of exiting the unusual event. R2DO (Chris Christensen), NRR EO (Bill | | Beckner) and FEMA (Ken Ciboch) notified. | | | | The NRC Resident Inspector was notified of this event update by the | | licensee. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 36156 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: SAINT LUCIE REGION: 2 |NOTIFICATION DATE: 09/13/1999| | UNIT: [1] [2] [] STATE: FL |NOTIFICATION TIME: 17:30[EDT]| | RXTYPE: [1] CE,[2] CE |EVENT DATE: 09/13/1999| +------------------------------------------------+EVENT TIME: 17:13[EDT]| | NRC NOTIFIED BY: STEVE MERRILL |LAST UPDATE DATE: 09/15/1999| | HQ OPS OFFICER: JOHN MacKINNON +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: UNU |ROBERT HAAG R2 | |10 CFR SECTION: |JOSEPH GIITTER IRO | |AAEC 50.72 (a) (1) (I) EMERGENCY DECLARED |DAN SULLIVAN FEMA | | |FRANK CONGEL IRO | | |ELINOR ADENSAM NRR | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N N 0 Hot Shutdown |0 Hot Shutdown | |2 N Y 100 Power Operation |100 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | UNUSUAL EVENT DECLARED DUE TO ENTERING EAL 5B ITEM 1 (CONFIRMED HURRICANE | | WARNING IN EFFECT) | | | | The licensee entered an Unusual Event per Emergency Action Level 5B item 1. | | All emergency diesel generators are fully operable and the electrical grid | | is stable. All emergency core cooling systems are fully operable. The state | | was notified of the Unusual Event classification. Local counties will be | | notified of the Unusual Event classification by the state of Florida. | | | | The NRC Resident Inspector will be notified of this event by the licensee. | | | | * * * UPDATE 0930 9/14/1999 BY STRANSKY * * * | | | | The NRC entered the Monitoring Phase of Normal Mode at 0930 on 9/14/1999 in | | preparation of potential landfall by Hurricane Floyd. | | | | * * * COMMISSIONER'S ASSISTANTS BRIEF, 1000 EDT ON 9/14/99 * * * | | | | Luis Reyes the R2RA conducted the brief, IRO (Frank Congel), NRR (Tad | | Marsh), NMSS (Josie Piccone), PA (William Beecher), SP (Fred Combs), R2 IRC | | (Pierce Skinner), CA (Betsy Keeling), EDO Staff (Leonard Wert), IP (Karen | | Henderson), SECY (Andrew Bates), Chairman Dicus Off (Thomas Hiltz), Comm. | | McGaffigan Off (James Beall), Comm. Diaz Off (Anthony Hsia), Comm. | | Merrifield Off (Lynne Stauss) | | | | *** COMMISSIONER'S ASSISTANCE BRIEF, 2000 EDT ON 9/14/99 *** | | | | Luis Reyes the R2RA conducted the brief, EDO (Jim Dyer), IRO ( Joe Giitter), | | NRR EO (Bill Beckner), NMSS (Josie Piccone), CA (Betsy Keeling), Chairman | | Dicus Off (Tom Hiltz), Comm McGaffigan (James Beall), Comm Merrifield | | (Lynne Stauss & John Thoma), NRC R2 (Bruce Mallett & Anne Boland) . | | | | * * * UPDATE AT 0059 EDT ON 9/15/99 BY JACK BREEN TO FANGIE JONES * * * | | | | Unusual Event was terminated at 0040 EDT when the hurricane warning was | | lifted by the National Hurricane Center. The licensee notified the NRC | | Resident Inspector and intends notifying the state and surrounding counties | | of exiting the Unusual Event. R2DO (Chris Christensen), NRR EO (William | | Beckner), and FEMA (Wayne Storer) notified. | +------------------------------------------------------------------------------+ !!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!!!! +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 36157 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: HATCH REGION: 2 |NOTIFICATION DATE: 09/13/1999| | UNIT: [1] [2] [] STATE: GA |NOTIFICATION TIME: 18:20[EDT]| | RXTYPE: [1] GE-4,[2] GE-4 |EVENT DATE: 09/13/1999| +------------------------------------------------+EVENT TIME: 16:30[EDT]| | NRC NOTIFIED BY: BARNES |LAST UPDATE DATE: 09/14/1999| | HQ OPS OFFICER: JOHN MacKINNON +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |ROBERT HAAG R2 | |10 CFR SECTION: | | |APRE 50.72(b)(2)(vi) OFFSITE NOTIFICATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | |2 N Y 98 Power Operation |98 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | OFFSITE NOTIFICATION MADE TO THE STATE OF GEORGIA ENVIRONMENTAL PROTECTION | | DIVISION | | | | At approximately 1630 hours a notification was made to the State of Georgia | | Environmental Protection Division regarding the exceedance of the | | instantaneous and two hour release rate for residual chlorine from the site | | during plant service water chlorination. An investigation is in progress to | | determine the cause. | | | | The NRC Resident Inspector was notified of this event by the licensee. | | | | | | ***Retraction on 09/14/99 at 1535 EDT by Barnes taken by MacKinnon*** | | | | On review of NUREG-1022 section 3.7 the licensee is retracting this event | | because the amount of chlorine released was small. R2DO (Chris Christensen) | | notified. | | | | The NRC Resident Inspector will be notified of this retraction. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |General Information or Other |Event Number: 36160 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: BNFL FUEL |NOTIFICATION DATE: 09/14/1999| |LICENSEE: BNFL FUEL |NOTIFICATION TIME: 05:16[EDT]| | CITY: SPRINGFIELDS REGION: |EVENT DATE: 08/12/1999| | COUNTY: ENGLAND STATE: |EVENT TIME: [EST]| |LICENSE#: AGREEMENT: N |LAST UPDATE DATE: 09/14/1999| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |GARY SHEAR R3 | | |KEVIN RAMSEY (FAX) NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: HOWARD WHITTAKER | | | HQ OPS OFFICER: FANGIE JONES | | +------------------------------------------------+ | |EMERGENCY CLASS: N/A | | |10 CFR SECTION: | | |CDEG 21.21(c)(3)(i) DEFECTS/NONCOMPLIANCE | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | 10 CFR PART 21 REPORT - CYLINDER NOT IN COMPLIANCE WITH ANSI 14.1 SENT TO | | PADUCAH | | | | "A full 48Y cylinder containing natural UF6 was sent to USEC at Paducah from | | BNFL Springfields in May 1997. On August 12, 1999, whilst preparing the | | cylinder for feeding, USEC personnel discovered that the cylinder was not in | | compliance with ANSI 14.1. The cylinder nameplate was stamped with a water | | capacity of 4019 Kgs equivalent to 142.1 cubic feet. The current standard | | of ANSI 14.1 requires a minimum volume of a 48Y cylinder to be 4037 Kgs | | water equivalent to 142.7 cubic feet. Since this cylinder does not comply | | with the ANSI standard it cannot be fed to the Paducah Gaseous Diffusion | | Plant. | | | | "It is our understanding that the USA Code of Federal Regulations 10 CFR | | Part 21 requires the receiver of a basic component that has a defect or | | deviates from a specification, to notify the supplier of the component of | | the defect or deviation. We have received a formal notification from the | | Paducah Plant of a deviation from the technical specification for UF6 | | cylinders. | | | | "10 CFR Part 21 requires the supplier of the basic component to complete an | | evaluation / failure to comply associated with safety hazards as soon as | | practical, and in all cases within 60 days of discovery to identify any | | defect etc that could create a substantial safety hazard if it remained | | uncorrected. | | | | "We therefore have accepted our responsibility for reporting the deviation | | to the NRC and to conduct the evaluation as per the requirements of 10 CFR | | Part 21." | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 36161 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: BRUNSWICK REGION: 2 |NOTIFICATION DATE: 09/14/1999| | UNIT: [1] [2] [] STATE: NC |NOTIFICATION TIME: 07:21[EDT]| | RXTYPE: [1] GE-4,[2] GE-4 |EVENT DATE: 09/14/1999| +------------------------------------------------+EVENT TIME: 06:32[EDT]| | NRC NOTIFIED BY: JAMES REINSBURROW |LAST UPDATE DATE: 09/14/1999| | HQ OPS OFFICER: FANGIE JONES +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |ROBERT HAAG R2 | |10 CFR SECTION: | | |AARC 50.72(b)(1)(v) OTHER ASMT/COMM INOP | | |APRE 50.72(b)(2)(vi) OFFSITE NOTIFICATION | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | |2 N Y 100 Power Operation |100 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | EMERGENCY WARNING OFFSITE SIRENS INOPERABLE | | | | The licensee determined that the emergency warning offsite sirens cannot be | | activated. Backup alert measures are in place while an investigation into | | the cause of the failure and completion of repairs are made. | | | | The licensee notified the NRC Resident Inspector, the local agencies of | | Brunswick and New Hanover Counties and North Carolina. | | | | * * * UPDATE AT 0802 EDT ON 9/14/99 BY LENNY BELLER TO FANGIE JONES * * * | | | | The licensee has determined and repaired the problem, a bad modem, and has | | restored the sirens to operable. The licensee notified the NRC Resident | | Inspector and the local government agencies. | | | | The NRC operations officer notified the R2DO (Robert Haag). | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 36162 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: SALEM REGION: 1 |NOTIFICATION DATE: 09/14/1999| | UNIT: [1] [] [] STATE: NJ |NOTIFICATION TIME: 13:07[EDT]| | RXTYPE: [1] W-4-LP,[2] W-4-LP |EVENT DATE: 09/14/1999| +------------------------------------------------+EVENT TIME: 10:26[EDT]| | NRC NOTIFIED BY: FRANK SOENS |LAST UPDATE DATE: 09/14/1999| | HQ OPS OFFICER: JOHN MacKINNON +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |NIEL DELLA GRECA R1 | |10 CFR SECTION: | | |AMED 50.72(b)(2)(v) OFFSITE MEDICAL | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 76 Power Operation |76 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | POTENTIALLY CONTAMINATED INDIVIDUAL TRANSPORTED TO HOSPITAL. | | | | A PSEG employee was transported to Salem Hospital after exhibiting heat | | stress symptoms after a containment entry. A complete frisk was not able to | | be completed prior to loading him in the ambulance. A radiation technician | | was able to complete the frisk prior to the arrival at the hospital but | | after the hospital was mobilized to accept a contaminated, injured | | individual. The frisk revealed that the individual was not contaminated. | | The individual is expected to fully recover. This report is made IAW | | CFR50.72(b)(2)(v) for transport of a potentially contaminated, injured | | individual offsite. | | | | The NRC resident has been notified. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 36163 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: BRUNSWICK REGION: 2 |NOTIFICATION DATE: 09/14/1999| | UNIT: [1] [2] [] STATE: NC |NOTIFICATION TIME: 23:30[EDT]| | RXTYPE: [1] GE-4,[2] GE-4 |EVENT DATE: 09/14/1999| +------------------------------------------------+EVENT TIME: 23:10[EDT]| | NRC NOTIFIED BY: THOMAS WOODALL |LAST UPDATE DATE: 09/14/1999| | HQ OPS OFFICER: JOHN MacKINNON +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: UNU |CHRIS CHRISTENSEN R2 | |10 CFR SECTION: |WILLIAM BECKNER NRR | |AAEC 50.72 (a) (1) (I) EMERGENCY DECLARED |FRANK CONGEL IRO | | |WAYNE STORER | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | |2 N Y 100 Power Operation |100 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | UNUSUAL EVENT DECLARED DUE TO ENTERING EAL 2.1 SECTION 14.1.2 (NATURAL EVENT | | - HURRICANE WARNING). | | | | The licensee entered an Unusual Event per Emergency Action Level 2.1 Section | | 14.1.2. All emergency diesel generators and their emergency core cooling | | systems are fully operable. The electrical grid is stable. The licensee said | | that they would have to enter Abnormal Operating Procedure 13 two hours | | before wind speed increased to 75 mph. The licensee projects that they have | | 27 hours until hurricane force winds reach their site. | | The licensee has notified the state of North Carolina and surrounding | | counties of entering an unusual event classification. | | | | The NRC Resident Inspector will be informed of this event by the licensee. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021