The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for August 25, 1999

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           08/24/1999 - 08/25/1999

                              ** EVENT NUMBERS **

36059  36060  36061  36062  36063  36064  36065  36066  36067  36068  

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36059       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SAINT LUCIE              REGION:  2  |NOTIFICATION DATE: 08/23/1999|
|    UNIT:  [1] [] []                 STATE:  FL |NOTIFICATION TIME: 14:25[EDT]|
|   RXTYPE: [1] CE,[2] CE                        |EVENT DATE:        08/23/1999|
+------------------------------------------------+EVENT TIME:        12:36[EDT]|
| NRC NOTIFIED BY:  JIM HURCHALLA                |LAST UPDATE DATE:  08/24/1999|
|  HQ OPS OFFICER:  FANGIE JONES                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |KENNETH BARR         R2      |
|10 CFR SECTION:                                 |                             |
|ARPS 50.72(b)(2)(ii)     RPS ACTUATION          |                             |
|AESF 50.72(b)(2)(ii)     ESF ACTUATION          |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     M/R        Y       100      Power Operation  |0        Hot Standby      |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| MANUAL REACTOR TRIP DUE TO LOSS OF MAIN CONDENSER VACUUM                     |
|                                                                              |
| The reactor was manually tripped (all rods inserted) due to low main         |
| condenser vacuum at 1236 EDT.  The cause of the low vacuum is under          |
| investigation and is unknown at this time.  When the trip occurred the 'A'   |
| side non-essential 6.9 kV bus failed to transfer from the auxiliary (plant)  |
| power to startup (offsite) source resulting in the loss of two of four       |
| reactor coolant pumps.  The cause of the failure to transfer is also unknown |
| and under investigation.                                                     |
|                                                                              |
| The plant is stable in hot standby with forced circulation via the remaining |
| two reactor coolant pumps.  Feedwater is via the main feedwater system and   |
| steaming is via the steam bypass system.                                     |
|                                                                              |
| The licensee notified the NRC Resident Inspector.                            |
|                                                                              |
|                                                                              |
| *** UPDATE ON 8/24/99 @ 0915 BY HALL TO GOULD ***                            |
|                                                                              |
| THIS UPDATE IS TO INCLUDE THE ACTUATION OF THE AFAS-2 (AUX FEEDWATER         |
| ACTUATION SYSTEM) FOR 4 MINS TO THE #2 STEAM GENERATOR.  THIS RESPONSE IS    |
| EXPECTED AND NORMAL.                                                         |
|                                                                              |
| THE RESIDENT INSPECTOR WAS NOTIFIED.                                         |
|                                                                              |
| THE REG 2 RDO(BARR) WAS NOTIFIED.                                            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36060       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: MILLSTONE                REGION:  1  |NOTIFICATION DATE: 08/24/1999|
|    UNIT:  [1] [2] [3]               STATE:  CT |NOTIFICATION TIME: 06:52[EDT]|
|   RXTYPE: [1] GE-3,[2] CE,[3] W-4-LP           |EVENT DATE:        08/24/1999|
+------------------------------------------------+EVENT TIME:        06:30[EDT]|
| NRC NOTIFIED BY:  ACKERMAN                     |LAST UPDATE DATE:  08/24/1999|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |KATHLEEN MODES       R1      |
|10 CFR SECTION:                                 |                             |
|APRE 50.72(b)(2)(vi)     OFFSITE NOTIFICATION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          N       0        Refueling        |0        Refueling        |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|3     N          Y       100      Power Operation  |100      Power Operation  |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| OFF SITE NOTIFICATION DUE TO FIRE OUTSIDE OF THE PROTECTED AREA.             |
|                                                                              |
| A FIRE WAS REPORTED AT THE COMPRESSOR OIL SEPARATOR IN THE SWITCHYARD        |
| OUTSIDE THE PROTECTED AREA.  THE FIRE WAS EXTINGUISHED WITHIN 10 MINS WITH   |
| ASSISTANCE FROM OFF SITE FIRE DEPARTMENT.  THE FIRE CONSISTED MOSTLY OF      |
| SMOKE AND SOME FLAMES, BUT THERE WAS NO APPARENT DAMAGE TO THE COMPRESSOR OR |
| SWITCHYARD.  THE STATE DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THE COUNTY |
| WERE NOTIFIED.                                                               |
|                                                                              |
| THE RESIDENT INSPECTOR WILL BE NOTIFIED.                                     |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36061       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SUSQUEHANNA              REGION:  1  |NOTIFICATION DATE: 08/24/1999|
|    UNIT:  [1] [2] []                STATE:  PA |NOTIFICATION TIME: 09:15[EDT]|
|   RXTYPE: [1] GE-4,[2] GE-4                    |EVENT DATE:        08/24/1999|
+------------------------------------------------+EVENT TIME:        08:45[EDT]|
| NRC NOTIFIED BY:  GRANT FERNSLER               |LAST UPDATE DATE:  08/24/1999|
|  HQ OPS OFFICER:  WILLIAM POERTNER             +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |KATHLEEN MODES       R1      |
|10 CFR SECTION:                                 |                             |
|AARC 50.72(b)(1)(v)      OTHER ASMT/COMM INOP   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| UNAVAILABILITY OF NOTIFICATION SYSTEMS FOR PAGER ACTIVATION                  |
|                                                                              |
| On 8/24/99 the station was conducting an Emergency Plan Drill.  During the   |
| activities one of the participants learned that the telenotification system  |
| (including its backup) which is used to page individuals in the event of an  |
| actual emergency had failed.  In accordance with 10CFR50.72(b)(1)(v) this    |
| constitutes a Loss of Emergency Response Capability .                        |
|                                                                              |
| The telenotification system is now operable.  The licensee determined that a |
| power source was disconnected.                                               |
|                                                                              |
| The NRC resident inspector has been notified.                                |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|General Information or Other                     |Event Number:   36062       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  T.A. HOUSTON & ASSOCIATES            |NOTIFICATION DATE: 08/24/1999|
|LICENSEE:  T.A. HOUSTON & ASSOCIATES            |NOTIFICATION TIME: 11:49[EDT]|
|    CITY:  CULPEPER                 REGION:  2  |EVENT DATE:        08/06/1999|
|  COUNTY:                            STATE:  VA |EVENT TIME:        16:00[EDT]|
|LICENSE#:  45-025073-01          AGREEMENT:  N  |LAST UPDATE DATE:  08/24/1999|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |SCOTT SPARKS         R2      |
|                                                |JOHN HICKEY          NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  T.A. HOUSTON                 |                             |
|  HQ OPS OFFICER:  CHAUNCEY GOULD               |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|NINF                     INFORMATION ONLY       |                             |
|BAB1 20.2201(a)(1)(i)    LOST/STOLEN LNM>1000X  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| TROXLER MOISTURE DENSITY GAUGE LOST DURING SHIPMENT                          |
|                                                                              |
| A TROXLER MOISTURE DENSITY GAUGE MODEL 3411B SERIAL #15637 CONTAINING 8      |
| MILLICURIES OF CESIUM-137 AND 40 MILLICURIES OF AMERICIUM WHICH WAS SHIPPED  |
| FROM T.A. HOUSTON & ASSOCIATES IN CULPEPER VA TO THE TROXLER COMPANY IN      |
| RESEARCH TRIANGLE PARK, NC ON 8/6/99 HAS NOT REACHED ITS DESTINATION AS OF   |
| 8/13/99.  FEDERAL EXPRESS, THE CARRIER, AND TROXLER BOTH HAVE BEEN           |
| CONTACTED.  THE TRACKING NUMBER IS 813439593699.  THE GAUGE WAS BEING        |
| SHIPPED TO TROXLER FOR CALIBRATION AND ROUTINE MAINTENANCE.                  |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36063       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: HADDAM NECK              REGION:  1  |NOTIFICATION DATE: 08/24/1999|
|    UNIT:  [1] [] []                 STATE:  CT |NOTIFICATION TIME: 12:18[EDT]|
|   RXTYPE: [1] W-4-LP                           |EVENT DATE:        08/24/1999|
+------------------------------------------------+EVENT TIME:        11:10[EDT]|
| NRC NOTIFIED BY:  BRIAN CAMPBELL               |LAST UPDATE DATE:  08/24/1999|
|  HQ OPS OFFICER:  FANGIE JONES                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |KATHLEEN MODES       R1      |
|10 CFR SECTION:                                 |                             |
|HFIT 26.73               FITNESS FOR DUTY       |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          N       0        Decommissioned   |0        Decommissioned   |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| FITNESS FOR DUTY REPORT                                                      |
|                                                                              |
| A contractor was determined to be under the influence of alcohol and it was  |
| confirmed by positive test results.  The contractor's access authorization   |
| to the plant has been terminated.  Refer to the HOO log for additional       |
| details.                                                                     |
|                                                                              |
| The licensee informed the NRC Resident Inspector and the Department of       |
| Environmental Protection for Connecticut .                                   |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   36064       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PORTSMOUTH GASEOUS DIFFUSION PLANT   |NOTIFICATION DATE: 08/24/1999|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 12:54[EDT]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        08/23/1999|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        17:18[EDT]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  08/24/1999|
|    CITY:  PIKETON                  REGION:  3  +-----------------------------+
|  COUNTY:  PIKE                      STATE:  OH |PERSON          ORGANIZATION |
|LICENSE#:  GDP-2                 AGREEMENT:  N  |MELVYN LEACH         R3      |
|  DOCKET:  0707002                              |JOHN HICKEY          NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  RON CRABTREE                 |                             |
|  HQ OPS OFFICER:  FANGIE JONES                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|OCBA 76.120(c)(2)(i)     ACCID MT EQUIP FAILS   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| CRITICALITY ACCIDENT ALARM SYSTEM SLAVE UNITS MAY NOT MEET REQUIRED          |
| STANDARD                                                                     |
|                                                                              |
| "At 1718 HOURS ON 8/23/99 THE PLANT SHIFT SUPERINTENDENT WAS NOTIFIED THAT   |
| THE CRITICALITY ACCIDENT ALARM SYSTEM (CAAS) SLAVE UNITS MAY NOT MEET ANSI   |
| 8.3, SECTION 5.5 STANDARD.  ANSI 8.3 IDENTIFIES THAT THE CAAS SYSTEM SHALL   |
| AUTOMATICALLY INITIATE AN EVACUATION ALARM SIGNAL WITHIN ONE HALF SECOND OF  |
| THE ALARM SETPOINT BEING EXCEEDED.  ENGINEERING COULD NOT PROVIDE ASSURANCE  |
| THAT THE CAAS SLAVE UNITS WOULD MEET THIS REQUIREMENT.  FACILITIES WITH CAAS |
| CLUSTERS (DETECTORS) AND THEIR EVACUATION HORNS ARE COMPLIANT WITH ANSI 8.3. |
| SECTION 55 REQUIREMENT.                                                      |
|                                                                              |
| "THE SAFETY SIGNIFICANCE IS MINIMAL SINCE THE SLAVES WILL STILL PROVIDE      |
| ALARM INDICATION                                                             |
| BEFORE SIMILAR INDICATIONS WOULD BE PROVIDED UNDER THE TSR LCO ACTIONS       |
| IMPLEMENTED."                                                                |
|                                                                              |
| FOR INFORMATION:  THE ALARMS DISCUSSED HERE ARE REMOTE ALARMS IN AREAS       |
| WITHIN SO MANY FEET OF THE AREA OF CONCERN, BUT OUTSIDE THE BUILDING OR      |
| ROOM.                                                                        |
|                                                                              |
| PLANT PERSONNEL HAVE INFORMED THE NRC RESIDENT INSPECTOR AND THE ONSITE DOE  |
| REPRESENTATIVE.                                                              |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36065       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: DIABLO CANYON            REGION:  4  |NOTIFICATION DATE: 08/24/1999|
|    UNIT:  [1] [2] []                STATE:  CA |NOTIFICATION TIME: 15:28[EDT]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        08/24/1999|
+------------------------------------------------+EVENT TIME:        10:32[PDT]|
| NRC NOTIFIED BY:  JOHN RAAB                    |LAST UPDATE DATE:  08/24/1999|
|  HQ OPS OFFICER:  FANGIE JONES                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |PHIL HARRELL         R4      |
|10 CFR SECTION:                                 |                             |
|APRE 50.72(b)(2)(vi)     OFFSITE NOTIFICATION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| OFFSITE NOTIFICATION OF THE CAPTURE AND SUBSEQUENT RELEASE OF A GREEN SEA    |
| TURTLE                                                                       |
|                                                                              |
| The licensee notified the National Marine Fisheries Service of the capture   |
| and subsequent planned release of a green sea turtle, which is protected     |
| under the Endangered Species Act.                                            |
|                                                                              |
| The licensee plans to notify the NRC Resident Inspector.                     |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36066       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SOUTH TEXAS              REGION:  4  |NOTIFICATION DATE: 08/24/1999|
|    UNIT:  [] [2] []                 STATE:  TX |NOTIFICATION TIME: 17:53[EDT]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        08/24/1999|
+------------------------------------------------+EVENT TIME:        14:38[CDT]|
| NRC NOTIFIED BY:  WILLIAM VALAGURA             |LAST UPDATE DATE:  08/24/1999|
|  HQ OPS OFFICER:  FANGIE JONES                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:                                |PHIL HARRELL         R4      |
|10 CFR SECTION:                                 |                             |
|AESF 50.72(b)(2)(ii)     ESF ACTUATION          |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| ENGINEERED SAFETY FEATURES ACTUATION DUE TO AN ELECTRICAL FAULT              |
|                                                                              |
| "At 1438 Hrs, August 24, 1999, the Unit 2 Standby Transformer locked out due |
| to an electrical fault on one of the lighting arrestors installed on the     |
| transformer. Due to the loss of power to the Unit 2 Standby Transformer, the |
| Train C Standby Diesel Generator started and loaded all Mode II (LOOP)       |
| Engineered Safety Features equipment as required. The Train 'B' Standby      |
| Diesel Generator was in service for monthly surveillance testing at the time |
| of the event, so the Train 'B' Engineered Safety Features equipment never    |
| lost power.                                                                  |
|                                                                              |
| "The electrical voltage perturbation also resulted in a Reactor Coolant      |
| System letdown isolation. Letdown has subsequently been returned to service  |
| for Reactor Coolant System inventory control. Also, two radiation monitors   |
| used to monitor plant radiological effluents were affected by the voltage    |
| perturbation. The Condenser Air Removal System Radiation Monitor RT-8027     |
| momentarily lost communications with the Radiation Monitoring System         |
| Computer. The condition has cleared and the monitor has been returned to     |
| service. The Unit Vent Radiation Monitor RT-8010A lost communication with    |
| the Radiation Monitoring System Computer during the perturbation as well.    |
| This monitor remains out of service (the Wide Range Unit Vent Accident       |
| Radiation Monitor RT-8010B remained in service through out the event).       |
|                                                                              |
| "Unit 2 is currently stable at 100% power. Preparations are being made to    |
| reenergize the deenergized Unit 2 Standby Buses from the Unit 1 Standby      |
| Transformer.                                                                 |
|                                                                              |
| "In addition to the start of the Train 'C' Standby Diesel Generator, the     |
| Train 'C' Centrifugal Charging Pump and the Train 'C' Auxiliary Feedwater    |
| Pump also started as required. The automatic actuation of these Engineered   |
| Safety Features components is reportable per 10 CFR 50.72(b)(2))."           |
|                                                                              |
| The licensee notified the NRC Resident Inspector.                            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Other Nuclear Material                           |Event Number:   36067       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  EASTERN ISOTOPES                     |NOTIFICATION DATE: 08/24/1999|
|LICENSEE:  EASTERN ISOTOPES                     |NOTIFICATION TIME: 19:08[EDT]|
|    CITY:  STERLING                 REGION:  2  |EVENT DATE:        08/24/1999|
|  COUNTY:                            STATE:  VA |EVENT TIME:        09:00[EDT]|
|LICENSE#:  45-25221-01           AGREEMENT:  N  |LAST UPDATE DATE:  08/24/1999|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |SCOTT SPARKS         R2      |
|                                                |JOE HOLONICH         NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  ALAN JONES                   |                             |
|  HQ OPS OFFICER:  FANGIE JONES                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|BAE1 20.2202(b)(1)       PERS OVEREXPOSURE      |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| POSSIBLE OVEREXPOSURE TO EMPLOYEES' EXTREMITIES                              |
|                                                                              |
| Eastern Isotopes received their June 1999 exposure report from their vendor, |
| Proxtronics (Burke, VA), which indicated one individual received 50 rem to   |
| the extremities as indicated by finger rings.  The report also indicated     |
| that two other individuals received higher than expected doses to their      |
| extremities, 25 rem and 36 rem.  Initial investigation indicated that the    |
| highest dosage occurred to an individual who had the least number of duties  |
| involving possible exposure.  The individuals involved have been removed     |
| from duties involving further exposures while further investigations are     |
| carried out.  The vendor has been contacted and suspects their standards and |
| controls, which they are investigating.  A preliminary report from the       |
| vendor is expected tomorrow.                                                 |
|                                                                              |
| Eastern Isotopes handles Technetium and F18 (FDG).                           |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36068       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: VERMONT YANKEE           REGION:  1  |NOTIFICATION DATE: 08/25/1999|
|    UNIT:  [1] [] []                 STATE:  VT |NOTIFICATION TIME: 04:29[EDT]|
|   RXTYPE: [1] GE-4                             |EVENT DATE:        08/25/1999|
+------------------------------------------------+EVENT TIME:        01:48[EDT]|
| NRC NOTIFIED BY:  DENNIS MAY                   |LAST UPDATE DATE:  08/25/1999|
|  HQ OPS OFFICER:  LEIGH TROCINE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |KATHLEEN MODES       R1      |
|10 CFR SECTION:                                 |                             |
|AESF 50.72(b)(2)(ii)     ESF ACTUATION          |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| UNEXPECTED HIGH PRESSURE COOLANT INJECTION SYSTEM SUCTION SWAPOVER DURING    |
| ROUTINE EMERGENCY DIESEL GENERATOR TESTING                                   |
|                                                                              |
| While using the "Diesel Generator Undervoltage Test Auto Start Switch" to    |
| start the 'B' emergency diesel generator as part of a routine surveillance   |
| test, an unexpected high pressure coolant injection system suction swapover  |
| occurred, and three valves actuated to swap the suction from the condensate  |
| storage tank (normal) to the torus.  Apparently, a low spike was received on |
| both the DC1 system and condensate storage tank level when the "Diesel       |
| Generator Undervoltage Test Auto Start Switch" was operated.  After the      |
| condensate storage tank and torus levels were verified to be normal, the     |
| licensee swapped the high pressure coolant injection suction back to its     |
| normal lineup.  The licensee is currently investigating the cause of this    |
| transient.                                                                   |
|                                                                              |
| The 'B' emergency diesel generator started as expected.                      |
|                                                                              |
| The licensee plans to notify the NRC resident inspector and the State of     |
| Vermont.                                                                     |
+------------------------------------------------------------------------------+
