Event Notification Report for March 24, 1999
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 03/23/1999 - 03/24/1999 ** EVENT NUMBERS ** 35500 35501 35502 +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 35500 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: GRAND GULF REGION: 4 |NOTIFICATION DATE: 03/22/1999| | UNIT: [1] [] [] STATE: MS |NOTIFICATION TIME: 19:16[EST]| | RXTYPE: [1] GE-6 |EVENT DATE: 03/22/1999| +------------------------------------------------+EVENT TIME: 18:00[CST]| | NRC NOTIFIED BY: MARTY McADORY |LAST UPDATE DATE: 03/23/1999| | HQ OPS OFFICER: DICK JOLLIFFE +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |CHARLES CAIN R4 | |10 CFR SECTION: | | |AARC 50.72(b)(1)(v) OTHER ASMT/COMM INOP | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | - EMERGENCY OPERATIONS FACILITY INOPERABLE DUE TO TWO INOPERABLE AIR | | COMPRESSORS - | | | | THE LICENSEE DECLARED BOTH AIR COMPRESSORS AT THE ENTERGY SERVICES CENTER | | INOPERABLE WHEN THEY FAILED TO START DURING A TEST. THESE COMPRESSORS | | SUPPLY AIR NECESSARY TO ISOLATE THE EMERGENCY OPERATIONS FACILITY (EOF), | | OPERATE THE HVAC SYSTEMS, AND START THE BACKUP GENERATOR. ONE UNIT HAS A | | FAULTY COMPRESSOR AND THE OTHER HAS A FAULTY CIRCUIT BREAKER. | | | | THE LICENSEE PLANS TO SWAP CIRCUIT BREAKERS AND RESTORE ONE UNIT TO OPERABLE | | STATUS. THE LICENSEE DECLARED THE EOF INOPERABLE. | | | | THE LICENSEE HAS NOTIFIED STATE AND LOCAL OFFICIALS, LICENSEE EMERGENCY | | RESPONSE PERSONNEL, AND THE NRC RESIDENT INSPECTOR THAT THE EOF IS | | INOPERABLE AND TO RESPOND TO THE BACKUP EOF LOCATED AT THE BAXTER WILSON | | POWER STATION IN VICKSBURG, MS, APPROXIMATELY 30 MILES FROM THE SITE, IF THE | | EOF IS REQUIRED TO BE STAFFED. | | | | * * * UPDATE AT 1721 ON 03/23/99 BY ERNEST MATHES TO JOLLIFFE * * * | | | | AT 1620 CDT ON 03/23/99, THE LICENSEE REPAIRED BOTH EOF AIR COMPRESSORS, | | DECLARED THEM OPERABLE, AND DECLARED THE EOF OPERABLE. | | | | THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR. | | | | THE NRC OPERATIONS OFFICER NOTIFIED THE R4DO CHUCK CAIN. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |General Information or Other |Event Number: 35501 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: FLORIDA BUREAU OF RADIATION CONTROL |NOTIFICATION DATE: 03/23/1999| |LICENSEE: J & M TESTING, INC |NOTIFICATION TIME: 13:01[EST]| | CITY: CHIPLEY REGION: 2 |EVENT DATE: 03/10/1999| | COUNTY: STATE: FL |EVENT TIME: 14:15[EST]| |LICENSE#: 1763-1 AGREEMENT: Y |LAST UPDATE DATE: 03/23/1999| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |MARK LESSER R2 | | | | +------------------------------------------------+ | | NRC NOTIFIED BY: CHARLES ADAMS | | | HQ OPS OFFICER: DICK JOLLIFFE | | +------------------------------------------------+ | |EMERGENCY CLASS: N/A | | |10 CFR SECTION: | | |NAGR AGREEMENT STATE | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | - AGREEMENT STATE REPORT - TWO LOST PORTABLE NUCLEAR SOIL MOISTURE DENSITY | | GAUGES - | | | | At 1415 on 03/10/99, during a Florida state inspection of J & M Testing, | | Inc., two portable nuclear soil moisture density gauges were determined to | | be missing. These are old gauges that were not being used and were last | | seen during an inventory taken on 12/28/98. The Chipley, FL police | | department has been notified. | | | | Specifications of the gauges are as follows: | | 1. Manufacturer: CPN, Model: BRC (1977); Serial No C7304NE147; Isotopes: 8 | | mCi Cs-137; 50 mCi Am-241/Be | | 2. Manufacturer: CPN, Model: BRC (1974); Serial No C7404NE50; Isotopes: 8 | | mCi Cs-137; 50 mCi Am-241/Be | | | | Charles Adams, FL Bureau of Radiation Control, notified NRC Region 2 (FL | | Radiological Incident No FL99-07). | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 35502 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: POINT BEACH REGION: 3 |NOTIFICATION DATE: 03/23/1999| | UNIT: [] [2] [] STATE: WI |NOTIFICATION TIME: 16:48[EST]| | RXTYPE: [1] W-2-LP,[2] W-2-LP |EVENT DATE: 03/23/1999| +------------------------------------------------+EVENT TIME: 15:07[CST]| | NRC NOTIFIED BY: RICK ROBBINS |LAST UPDATE DATE: 03/23/1999| | HQ OPS OFFICER: DICK JOLLIFFE +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |PATRICK HILAND R3 | |10 CFR SECTION: | | |AOUT 50.72(b)(1)(ii)(B) OUTSIDE DESIGN BASIS | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | |2 N Y 100 Power Operation |100 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | - S/G PRESSURE TRANSMITTER CABLE NOT WRAPPED WITH FIRE WRAP IN A FIRE ZONE | | - | | | | AT 1507 CDT ON 03/23/99, DURING A 10CFR50, APPENDIX R REBASELINE REVIEW, THE | | LICENSEE DISCOVERED THAT CABLE #ZP2I483F FOR RED CHANNEL STEAM GENERATOR 'B' | | PRESSURE TRANSMITTER #2PT-00483 ROUTED THROUGH A FIRE ZONE IS NOT PROPERLY | | WRAPPED WITH FIRE WRAP. THUS, THE RED CHANNEL STEAM GENERATOR 'B' PRESSURE | | TRANSMITTER WOULD NOT BE AVAILABLE, AS EXPECTED, DURING A FIRE IN THIS | | ZONE. | | | | A FOUR HOUR ROVING FIRE WATCH ALREADY EXISTS FOR THIS FIRE ZONE FOR OTHER | | REASONS AND WILL REMAIN IN EFFECT UNTIL THIS PROBLEM IS CORRECTED. | | | | THIS PROBLEM IS APPLICABLE TO UNIT 2 ONLY AND HAS NO EFFECT ON UNIT 1. | | | | THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021