The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for March 12, 1999

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           03/11/1999 - 03/12/1999

                              ** EVENT NUMBERS **

35458  35459  35460  35461  

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   35458       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PORTSMOUTH GASEOUS DIFFUSION PLANT   |NOTIFICATION DATE: 03/11/1999|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 14:31[EST]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        03/11/1999|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        10:30[EST]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  03/11/1999|
|    CITY:  PIKETON                  REGION:  3  +-----------------------------+
|  COUNTY:  PIKE                      STATE:  OH |PERSON          ORGANIZATION |
|LICENSE#:  GDP-2                 AGREEMENT:  N  |RONALD GARDNER       R3      |
|  DOCKET:  0707002                              |DON COOL, EO         NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  ERIC SPAETH                  |                             |
|  HQ OPS OFFICER:  JOHN MacKINNON               |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|NBNL                     RESPONSE-BULLETIN      |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| - NRC BULLETIN 91-01, 4 HOUR  REPORT -                                       |
|                                                                              |
| THE FOLLOWING IS A PORTION OF A FACSIMILE FROM PORTSMOUTH GASEOUS DIFFUSION  |
| PLANT:                                                                       |
|                                                                              |
| ON MARCH 11,1999 AT l030 HOURS, THE NUCLEAR CRITICALITY SAFETY (NCS) STAFF   |
| DETERMINED THAT A NUCLEAR CRITICALITY SAFETY APPROVAL (NCSA) FOR X-705, THAT |
| DEALT WITH DISASSEMBLY OF EQUIPMENT, WAS DEFICIENT.  NCSA-0705_038 WAS       |
| DEFICIENT IN THAT IT FAILED TO IDENTIFY THE CONTROLS NECESSARY TO ENSURE     |
| THAT THE DISASSEMBLY OF EQUIPMENT, PREVIOUSLY CLASSIFIED "UH (UNCOMPLICATED  |
| HANDLING) BASED ON GEOMETRY", DID NOT LEAD TO AN UNSAFE CONFIGURATION FOR    |
| NCS.  BUILDING AND NCS PERSONNEL HAVE ASSESSED THE AREA AND NO UNSAFE        |
| CONDITIONS OR DISASSEMBLY ACTIVITIES WERE FOUND.                             |
|                                                                              |
| THE NCSA DID NOT ADEQUATELY CONSIDER THE EFFECT OF DISASSEMBLY ON EQUIPMENT  |
| CLASSIFIED AS "UH BASED ON GEOMETRY" THAT COULD LEAD TO AN UNSAFE            |
| CONFIGURATION.                                                               |
|                                                                              |
| X-705 BUILDING MANAGEMENT PERSONNEL HAVE DISCONTINUED DISASSEMBLY OPERATIONS |
| OF EQUIPMENT INVOLVING COMPONENTS PREVIOUSLY CLASSIFIED AS "UH BASED ON      |
| GEOMETRY". APPLICABLE NCSAs WILL BE CORRECTED AND IMPLEMENTED.               |
|                                                                              |
| THERE WAS NO LOSS OF HAZARDOUS/RADIOACTIVE MATERIAL OR                       |
| RADIOACTIVE/RADIOLOGICAL CONTAMINATION EXPOSURE AS A RESULT OF THIS EVENT.   |
|                                                                              |
| THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.                            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Other Nuclear Material                           |Event Number:   35459       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  GAI CONSULTANTS, INC                 |NOTIFICATION DATE: 03/11/1999|
|LICENSEE:  GAI CONSULTANTS, INC                 |NOTIFICATION TIME: 13:43[EST]|
|    CITY:  MONROEVILLE              REGION:  1  |EVENT DATE:        03/11/1999|
|  COUNTY:  ALLEGHENY                 STATE:  PA |EVENT TIME:        07:10[EST]|
|LICENSE#:  37-09180-01           AGREEMENT:  N  |LAST UPDATE DATE:  03/11/1999|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |TOM MOSLAK           R1      |
|                                                |DON COOL, EO         NMSS    |
+------------------------------------------------+EDWARD MCALPINE      R2      |
| NRC NOTIFIED BY:  CHUCK FORD, RSO              |                             |
|  HQ OPS OFFICER:  DICK JOLLIFFE                |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|BAB1 20.2201(a)(1)(i)    LOST/STOLEN LNM>1000X  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| - TROXLER MOISTURE DENSITY GAUGE STOLEN FROM A LOCKED COMPANY PICKUP TRUCK   |
| -                                                                            |
|                                                                              |
| AT 0710 ON 03/11/99, CHUCK FORD, RADIATION SAFETY OFFICER, GAI CONSULTANTS,  |
| INC, MONROEVILLE, PA, (LICENSE #37-09180-01) WAS NOTIFIED THAT A TROXLER     |
| MOISTURE DENSITY GAUGE HAD BEEN STOLEN FROM THE BACK OF A COMPANY PICKUP     |
| TRUCK WITH A LOCKED CAMPER TOP.  THE TRUCK WAS PARKED IN THE PARKING LOT OF  |
| THE COMFORT INN IN MARTINSBURG, WV.  THE CAMPER TOP LOCK WAS DAMAGED AND THE |
| GAUGE HAD BEEN STOLEN BETWEEN 1900 ON 03/10/99 TO 0630 ON 03/11/99.  THE     |
| UNDAMAGED LOCKED GAUGE (MODEL #3440, SERIAL #29575) CONTAINED SEALED 8       |
| MILLICURIES OF Cs-137 AND 40 MILLICURIES OF Am-241-Be SOURCES.               |
|                                                                              |
| MR. FORD REPORTED THE THEFT TO THE WV STATE POLICE AND NRC REGION 1 (JUDY    |
| JOUSTRA) AND PLANS TO SUBMIT A WRITTEN REPORT TO THE NRC WITHIN 30 DAYS.     |
| THE WV STATE POLICE ISSUED A PRESS RELEASE REGARDING THIS THEFT.             |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   35460       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SEABROOK                 REGION:  1  |NOTIFICATION DATE: 03/11/1999|
|    UNIT:  [1] [] []                 STATE:  NH |NOTIFICATION TIME: 16:08[EST]|
|   RXTYPE: [1] W-4-LP                           |EVENT DATE:        03/11/1999|
+------------------------------------------------+EVENT TIME:        14:30[EST]|
| NRC NOTIFIED BY:  DENNIS BEMIS                 |LAST UPDATE DATE:  03/11/1999|
|  HQ OPS OFFICER:  DICK JOLLIFFE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |TOM MOSLAK           R1      |
|10 CFR SECTION:                                 |                             |
|APRE 50.72(b)(2)(vi)     OFFSITE NOTIFICATION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| - LICENSEE NOTIFIED EPA & NH OF SANITARY WASTE WATER DISCHARGE INTO ATLANTIC |
| OCEAN -                                                                      |
|                                                                              |
| AT 1430 ON 03/11/99, THE LICENSEE NOTIFIED THE ENVIRONMENTAL PROTECTION      |
| AGENCY AND THE NEW HAMPSHIRE DEPARTMENT OF ENVIRONMENTAL SERVICES THAT       |
| APPROXIMATELY 60 GALLONS OF SANITARY WASTE WATER HAD INADVERTENTLY BEEN      |
| DISCHARGED INTO A PLANT STORM DRAIN WHICH DISCHARGES INTO THE ATLANTIC OCEAN |
| IN VIOLATION OF THEIR NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM        |
| PERMIT.                                                                      |
|                                                                              |
| THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.                            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   35461       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SOUTH TEXAS              REGION:  4  |NOTIFICATION DATE: 03/12/1999|
|    UNIT:  [1] [2] []                STATE:  TX |NOTIFICATION TIME: 00:07[EST]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        03/11/1999|
+------------------------------------------------+EVENT TIME:        11:30[CST]|
| NRC NOTIFIED BY:  KLIMPLE                      |LAST UPDATE DATE:  03/12/1999|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |GARY SANBORN         R4      |
|10 CFR SECTION:                                 |                             |
|NINF                     INFORMATION ONLY       |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| THE PLANT DOES NOT MEET THE DESIGN BASIS REQUIREMENT FOR RHR HEAT EXCHANGER  |
| CONTROL VALVES TO BE SECURED IN A SAFE POSITION.                             |
|                                                                              |
| DURING A REVIEW OF THE OPERATING PROCEDURES FOR THE RESIDUAL HEAT            |
| REMOVAL(RHR) HEAT EXCHANGER SYSTEM, NO STEPS OR LINEUPS WERE FOUND TO        |
| IMPLEMENT THE DESIGN BASIS REQUIREMENT FOR THE RHR HEAT EXCHANGER FLOW AND   |
| BYPASS CONTROL VALVES TO BE SECURED IN THEIR SAFE POSITION.                  |
|                                                                              |
| THE RHR HEAT EXCHANGER FLOW AND BYPASS CONTROL VALVES WERE FOUND TO BE       |
| CONFIGURED WITH THE SOLENOID VENT VALVES IN AN ENERGIZED CONDITION,          |
| THEREFORE POTENTIALLY ALLOWING THE NON-SAFETY RELATED POSITIONER TO CONTROL  |
| THE VALVE.                                                                   |
| FAILURE OF ONE OF THE NON-SAFETY POSITIONERS (DUE TO ADVERSE CONDITIONS)     |
| COULD HAVE DRIVEN THE VALVES TO THEIR NON-SAFETY  POSITION  AT THE ONSET OF  |
| A POSTULATED ACCIDENT, THEREBY PREVENTING THE IMMEDIATE AVAILABILITY OF THE  |
| LOW HEAD SAFETY INJECTION FLOW.                                              |
|                                                                              |
| THIS CONDITION WAS RESOLVED AS SOON AS IT WAS IDENTIFIED BY DE-ENERGIZING    |
| AND REMOVING THE FUSES FOR THE VALVES.                                       |
|                                                                              |
| THE RESIDENT INSPECTOR WAS NOTIFIED.                                         |
+------------------------------------------------------------------------------+


Page Last Reviewed/Updated Thursday, March 25, 2021