The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for February 2, 1999

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           02/01/1999 - 02/02/1999

                              ** EVENT NUMBERS **

35336  35337  35338  

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   35336       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SAN ONOFRE               REGION:  4  |NOTIFICATION DATE: 02/01/1999|
|    UNIT:  [] [2] []                 STATE:  CA |NOTIFICATION TIME: 13:30[EST]|
|   RXTYPE: [1] W-3-LP,[2] CE,[3] CE             |EVENT DATE:        02/01/1999|
+------------------------------------------------+EVENT TIME:        10:09[PST]|
| NRC NOTIFIED BY:  BOB CONOSCENTI               |LAST UPDATE DATE:  02/01/1999|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          UNU                   |JEFF SHACKELFORD     R4      |
|10 CFR SECTION:                                 |ROBERT DENNIG        EO      |
|AAEC 50.72(a)(1)(i)      EMERGENCY DECLARED     |STUART RUBIN         IRO     |
|                                                |GENE CANUPP          FEMA    |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     N          N       0        Refueling        |0        Refueling        |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| UNIT 2 DECLARED AN UNUSUAL EVENT DUE TO A LOSS OF SHUTDOWN COOLING GREATER   |
| THAN 10 MINUTES                                                              |
|                                                                              |
| MAINTENANCE PERSONNEL WERE PREPARING TO RACK OUT ELECTRICAL BREAKER          |
| "2A04-18", WHEN THE BREAKER UNEXPECTEDLY CLOSED.  THIS BREAKER, WHICH WAS    |
| OUT-OF-SERVICE AT THE TIME,  SUPPLIES POWER TO THE 4160 VAC CLASS 1-E BUS    |
| "2A04" FROM THE RESERVE AUXILIARY TRANSFORMER.  AS A RESULT, AT 1009 PST THE |
| "2A04" BUS DEENERGIZED CAUSING A LOSS OF BOTH THE OPERATING TRAIN "A"        |
| SHUTDOWN COOLING PUMP AND THE CROSS-TIED CONTAINMENT SPRAY PUMP "A" WHICH    |
| WAS SUPPLYING SPENT FUEL POOL COOLING.  THE STANDBY EMERGENCY DIESEL         |
| GENERATOR AUTOSTARTED BUT DID NOT CLOSE ONTO THE BUS DUE TO A PROTECTIVE     |
| RELAY LOCKOUT.  CORE ALTERATIONS WERE SUSPENDED.  AT 1014 PST, THE "2A04"    |
| BUS WAS REENERGIZED AND AT 1025 PST SHUTDOWN COOLING FLOW WAS RESTORED.      |
| DURING THE 16 MINUTES THAT SHUTDOWN COOLING WAS LOST, INDICATED TEMPERATURE  |
| AS MEASURED BY TWO (2) SENSORS IN DIFFERENT LOCATIONS INCREASED FROM 72�F TO |
| 74�F AND 77�F TO 80�F, RESPECTIVELY.                                         |
|                                                                              |
| UNIT 3 WAS IN THE PROCESS OF VERIFYING OFFSITE POWER SUPPLIES AS REQUIRED BY |
| SURVEILLANCE SINCE THE "2A04" BUS CAN BE CROSS-TIED TO UNIT 3.               |
|                                                                              |
| THE LICENSEE IS CONDUCTING AN INVESTIGATION TO DETERMINE ROOT CAUSE.  UNIT 2 |
| EXITED THE UNUSUAL EVENT AT 1040 PST. THE LICENSEE INFORMED THE STATE AND    |
| THE  NRC RESIDENT INSPECTOR.                                                 |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   35337       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: HATCH                    REGION:  2  |NOTIFICATION DATE: 02/01/1999|
|    UNIT:  [] [2] []                 STATE:  GA |NOTIFICATION TIME: 17:30[EST]|
|   RXTYPE: [1] GE-4,[2] GE-4                    |EVENT DATE:        02/01/1999|
+------------------------------------------------+EVENT TIME:        16:10[EST]|
| NRC NOTIFIED BY:  BRUCE BUTLER                 |LAST UPDATE DATE:  02/01/1999|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |BRIAN BONSER         R2      |
|10 CFR SECTION:                                 |                             |
|AESF 50.72(b)(2)(ii)     ESF ACTUATION          |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     N          N       0        Cold Shutdown    |0        Cold Shutdown    |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| UNIT 2 EXPERIENCED A SPURIOUS ESF ACTUATION OF TWO DRYWELL ISOLATION VALVES  |
| DURING BULB REPLACEMENT ON THE DRYWELL WIDE RANGE RADIATION MONITOR.         |
|                                                                              |
| "I&C PERSONNEL WERE REPLACING THE GREEN NORMAL/RESET PUSHBUTTON LIGHT BULB   |
| FOR DRYWELL WIDE RANGE RADIATION MONITOR '2D11-K621B' WHEN THE AMBER HIGH    |
| LIGHT LIT UP ON THE MONITOR RESULTING IN TWO 18 INCH PRIMARY CONTAINMENT     |
| PURGE AND VENT VALVES,  '2T48-F320' AND '2T48-F308',  GOING CLOSED.  THE     |
| NORMAL/RESET PUSHBUTTON WAS BEING DEPRESSED IN THE LIGHT HOLDER WHEN THE     |
| AMBER HIGH LIGHT CAME ON AND IMMEDIATELY RESET.  THIS EVENT WAS CAUSED BY A  |
| SPURIOUS SIGNAL.  [THERE WAS NO ACTUAL] HIGH RADIATION CONDITION IN THE      |
| DRYWELL.  A DEFICIENCY IS BEING INITIATED [AS PART OF THE INVESTIGATION]. "  |
|                                                                              |
| BOTH VALVES WERE SUBSEQUENTLY REOPENED AND THE LICENSEE WILL INFORM THE NRC  |
| RESIDENT INSPECTOR.                                                          |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   35338       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: FT CALHOUN               REGION:  4  |NOTIFICATION DATE: 02/01/1999|
|    UNIT:  [1] [] []                 STATE:  NE |NOTIFICATION TIME: 23:30[EST]|
|   RXTYPE: [1] CE                               |EVENT DATE:        02/01/1999|
+------------------------------------------------+EVENT TIME:        20:15[CST]|
| NRC NOTIFIED BY:  LARRY LEES                   |LAST UPDATE DATE:  02/01/1999|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |JEFF SHACKELFORD     R4      |
|10 CFR SECTION:                                 |                             |
|APRE 50.72(b)(2)(vi)     OFFSITE NOTIFICATION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| OFFSITE ASSISTANCE REQUESTED FROM THE BLAIR VOLUNTEER FIRE DEPARTMENT DUE TO |
| A REPORT OF SMOKE IN THE TRAINING FACILITY.                                  |
|                                                                              |
| WHILE CLEANING THE NORTHEAST END OF TRAINING FACILITY, WHICH IS LOCATED      |
| OUTSIDE THE PROTECTED AREA, SMOKE AND A BURNING SMELL WERE NOTED BY A MEMBER |
| OF THE JANITORIAL STAFF.  THE CONTROL ROOM WAS NOTIFIED AND DISPATCHED AN    |
| OPERATOR WITH A SECURITY GUARD TO INVESTIGATE.  ASSISTANCE WAS REQUESTED     |
| FROM THE BLAIR VOLUNTEER FIRE DEPARTMENT (VFD) WHO RESPONDED TO THE SCENE.   |
| THE SOURCE OF THE SMOKE WAS A FAILED RESISTIVE HEATING ELEMENT IN THE        |
| VENTILATION DUCTING.  POWER WAS REMOVED FROM THE HEATER AT 2115 CDT AND THE  |
| BLAIR VFD WAS RELEASED.                                                      |
|                                                                              |
| THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.                            |
+------------------------------------------------------------------------------+


Page Last Reviewed/Updated Thursday, March 25, 2021