Event Notification Report for January 29, 1999

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           01/28/1999 - 01/29/1999

                              ** EVENT NUMBERS **

35319  35320  35321  35322  

+------------------------------------------------------------------------------+
|Other Nuclear Material                           |Event Number:   35319       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  CTE NEVADA, INC.                     |NOTIFICATION DATE: 01/28/1999|
|LICENSEE:  CTE NEVADA, INC.                     |NOTIFICATION TIME: 10:59[EST]|
|    CITY:  LAS VEGAS                REGION:  4  |EVENT DATE:        01/26/1999|
|  COUNTY:                            STATE:  NV |EVENT TIME:        18:30[PST]|
|LICENSE#:  00-11-0363-01         AGREEMENT:  Y  |LAST UPDATE DATE:  01/28/1999|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |CHARLES MARSCHALL    R4      |
|                                                |FRED COMBS, NMSS     EO      |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  R MICHAEL                    |                             |
|  HQ OPS OFFICER:  JOHN MacKINNON               |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|BAB1 20.2201(a)(1)(i)    LOST/STOLEN LNM>1000X  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| TROXLER MOISTURE DENSITY GAUGE STOLEN FROM BACK OF A PICKUP TRUCK            |
|                                                                              |
| ON 01/26/99 AT APPROXIMATELY 1630 PST AN EMPLOYEE OF CTE NEVADA, INC. PARKED |
| A PICKUP TRUCK IN THE BACK OF THE COMPANY'S OFFICE AND ENTERED THE OFFICE    |
| VIA ITS BACK DOOR.  APPROXIMATELY ONE HOUR LATER (BETWEEN 1730 - 1830 HOURS) |
| THE EMPLOYEE WENT BACK TO THE PICKUP TRUCK AND DISCOVERED THAT THE TROXLER   |
| MOISTURE DENSITY GAUGE (MODEL 3 3400 SERIES) HOLD DOWN CHAIN HAD BEEN CUT    |
| WITH CHAIN CUTTERS AND THE GAUGE WAS MISSING.  THE TROXLER MOISTURE DENSITY  |
| GAUGE CONTAINED AN 8 mCi CESIUM-137 SOURCE AND A 40mCi Am-241(Be) SOURCE.    |
| THE GAUGE WAS DOUBLE LOCKED AND IN ITS CASE WHEN IT WAS STOLEN.  THE         |
| LICENSEE NOTIFIED THE STATE OF NEVADA HEALTH DEPARTMENT OF THE GAUGE BEING   |
| STOLEN AND THEY NOTIFIED THE LAS VEGAS METRO POLICE THE NEXT DAY (01/27/99)  |
| THAT THE TROXLER MOISTURE DENSITY GAUGE HAD BEEN STOLEN.  THE METRO POLICE   |
| SAID THAT THEY WOULD COME OUT AND INVESTIGATE THE INCIDENT IN 2 OR 3 DAYS.   |
| THE LICENSEE WAS GIVEN THE PHONE NUMBER FOR THE  STATE OF NEVADA             |
| RADIOLOGICAL HEALTH SECTION DEPARTMENT AND WAS ASKED TO CALL THEM.  THE      |
| LICENSEE SAID THAT THEIR RADIATION SAFETY OFFICER WAS HANDLING THIS EVENT.   |
| THE LICENSEE SAID THAT NRC REGION 4 HAD BEEN NOTIFIED OF THE EVENT.          |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   35320       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: HATCH                    REGION:  2  |NOTIFICATION DATE: 01/28/1999|
|    UNIT:  [] [2] []                 STATE:  GA |NOTIFICATION TIME: 14:07[EST]|
|   RXTYPE: [1] GE-4,[2] GE-4                    |EVENT DATE:        01/28/1999|
+------------------------------------------------+EVENT TIME:        12:02[EST]|
| NRC NOTIFIED BY:  BARNES                       |LAST UPDATE DATE:  01/28/1999|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |BRIAN BONSER         R2      |
|10 CFR SECTION:                                 |                             |
|AESF 50.72(b)(2)(ii)     ESF ACTUATION          |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     N          N       0        Hot Shutdown     |0        Hot Shutdown     |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| GROUP 2 ISOLATION DUE TO REACTOR WATER LEVEL LESS THAN 3 INCHES.             |
|                                                                              |
| A GROUP 2 ISOLATION OCCURRED WHEN THE REACTOR WATER LEVEL DECREASED TO 1     |
| INCH FOLLOWING A PREPLANNED MANUAL REACTOR SCRAM DURING A PLANNED PLANT      |
| SHUTDOWN.  THE FOLLOWING VALVES CLOSED AS PART OF THE GROUP 2 ISOLATION      |
| SIGNAL:  FISSION PRODUCT MONITOR VALVES (2D11-F050, F051, F052, F053, F071,  |
| & F072), PRIMARY CONTAINMENT 18 INCH VENT VALVES (2T48-F319 & F320), PRIMARY |
| CONTAINMENT PURGE VALVES (2T48-F309 & F324), H2-O2 ANALYZER VALVES           |
| (2P33-F002, F004, F005, F007, F012, F013, & F015), AND DRYWELL EQUIPMENT     |
| DRAIN SUMP ISOLATION VALVES (2611-F003 & F004).  THE REACTOR WATER LEVEL WAS |
| RESTORED TO GREATER THAN 3 INCHES AND ALL VALVES WERE REOPENED  WITHIN 5     |
| MINUTES.  THE CAUSE OF THE LOW LEVEL WAS DUE TO THE VOIDS COLLAPSING AND     |
| RECOVERY WAS NOT QUICK ENOUGH TO PREVENT THE ISOLATION.                      |
|                                                                              |
| THE RESIDENT INSPECTOR WAS NOTIFIED.                                         |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Other Nuclear Material                           |Event Number:   35321       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  US ARMY TNG & DOCTRINE COMD          |NOTIFICATION DATE: 01/28/1999|
|LICENSEE:  US ARMY TNG & DOCTRINE COMD          |NOTIFICATION TIME: 16:03[EST]|
|    CITY:  FORT KNOX                REGION:  2  |EVENT DATE:        01/19/1999|
|  COUNTY:                            STATE:  KY |EVENT TIME:             [CST]|
|LICENSE#:                        AGREEMENT:  Y  |LAST UPDATE DATE:  01/28/1999|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |BRIAN BONSER         R2      |
|                                                |                             |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  POTTER                       |                             |
|  HQ OPS OFFICER:  CHAUNCEY GOULD               |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|BAB1 20.2201(a)(1)(i)    LOST/STOLEN LNM>1000X  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| THE US ARMY TRAINING AND DOCTRINE COMMAND SUSPECTS THEY HAVE BURIED TWO      |
| TRITIUM EXIT LIGHT SIGNS IN A LANDFILL ON POST.                              |
|                                                                              |
| THESE SIGNS WERE REMOVED FROM TWO BUILDINGS ON POST AND ON 11/10/99  AND     |
| 12/15/98, THE RADIATION SAFETY OFFICER ASKED WHAT HAPPENED TO THE SIGNS, BUT |
| RECEIVED NO RESPONSE.   ON 01/19/99 IT WAS VERIFIED THAT THE TWO SIGNS       |
| CONTAINING 9.5 CURIES EACH OF TRITIUM WERE BURIED ON A POST LANDFILL.  THEY  |
| WILL MAKE NO ATTEMPT TO RECOVER THE SIGNS.                                   |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   35322       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: HATCH                    REGION:  2  |NOTIFICATION DATE: 01/28/1999|
|    UNIT:  [] [2] []                 STATE:  GA |NOTIFICATION TIME: 17:20[EST]|
|   RXTYPE: [1] GE-4,[2] GE-4                    |EVENT DATE:        01/28/1999|
+------------------------------------------------+EVENT TIME:        16:30[EST]|
| NRC NOTIFIED BY:  BARNES                       |LAST UPDATE DATE:  01/28/1999|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |BRIAN BONSER         R2      |
|10 CFR SECTION:                                 |                             |
|ASHU 50.72(b)(1)(i)(A)   PLANT S/D REQD BY TS   |                             |
|NLCO                     TECH SPEC LCO A/S      |                             |
|AESF 50.72(b)(2)(ii)     ESF ACTUATION          |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     N          N       0        Hot Shutdown     |0        Hot Shutdown     |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| THE PLANT ENTERED LCO ACTION STATEMENT DUE TO TWO ADS VALVES BEING           |
| INOPERABLE.                                                                  |
|                                                                              |
| THIS CONDITION OCCURRED WHEN  2B21-F013K SAFETY RELIEF VALVE OPENED AND THE  |
| PROCEDURE (34AB-OPS-007-1) DIRECTS OPERATORS TO REMOVE FUSES, WHICH WAS      |
| DONE, TO CLOSE THE VALVE.  POWER REMOVED FROM THIS VALVE AND POWER           |
| PREVIOUSLY REMOVED FROM THE 2B21-F013C VALVE DUE TO A DC GROUND, PUT THE     |
| PLANT IN A TS LCO ACTION STATEMENT TO BE IN MODE 3 (WHICH THEY ARE CURRENTLY |
| IN) WITHIN 12 HOURS AND BE BELOW 150 PSIG WITHIN 36 HOURS.  THE PLANT IS     |
| CURRENTLY AT 300 PSIG AND PROCEEDING TO COLD SHUTDOWN.                       |
|                                                                              |
| THE RESIDENT INSPECTOR WAS NOTIFIED.                                         |
|                                                                              |
| *** UPDATE ON 1/28/99 @ 1846 BY COLEMAN TO GOULD ***                         |
|                                                                              |
| THE LICENSEE DETERMINED THAT THE OPENING OF THE ADS VALVE WAS ALSO AN ESF    |
| ACTUATION.                                                                   |
|                                                                              |
| THE LICENSEE PLANS TO INFORM THE RESIDENT INSPECTOR.                         |
|                                                                              |
| THE NRC OPERATIONS OFFICER NOTIFIED THE R2DO (BRIAN BONSER).                 |
+------------------------------------------------------------------------------+


Page Last Reviewed/Updated Thursday, March 25, 2021