Event Notification Report for January 29, 1999
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 01/28/1999 - 01/29/1999 ** EVENT NUMBERS ** 35319 35320 35321 35322 +------------------------------------------------------------------------------+ |Other Nuclear Material |Event Number: 35319 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: CTE NEVADA, INC. |NOTIFICATION DATE: 01/28/1999| |LICENSEE: CTE NEVADA, INC. |NOTIFICATION TIME: 10:59[EST]| | CITY: LAS VEGAS REGION: 4 |EVENT DATE: 01/26/1999| | COUNTY: STATE: NV |EVENT TIME: 18:30[PST]| |LICENSE#: 00-11-0363-01 AGREEMENT: Y |LAST UPDATE DATE: 01/28/1999| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |CHARLES MARSCHALL R4 | | |FRED COMBS, NMSS EO | +------------------------------------------------+ | | NRC NOTIFIED BY: R MICHAEL | | | HQ OPS OFFICER: JOHN MacKINNON | | +------------------------------------------------+ | |EMERGENCY CLASS: N/A | | |10 CFR SECTION: | | |BAB1 20.2201(a)(1)(i) LOST/STOLEN LNM>1000X | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | TROXLER MOISTURE DENSITY GAUGE STOLEN FROM BACK OF A PICKUP TRUCK | | | | ON 01/26/99 AT APPROXIMATELY 1630 PST AN EMPLOYEE OF CTE NEVADA, INC. PARKED | | A PICKUP TRUCK IN THE BACK OF THE COMPANY'S OFFICE AND ENTERED THE OFFICE | | VIA ITS BACK DOOR. APPROXIMATELY ONE HOUR LATER (BETWEEN 1730 - 1830 HOURS) | | THE EMPLOYEE WENT BACK TO THE PICKUP TRUCK AND DISCOVERED THAT THE TROXLER | | MOISTURE DENSITY GAUGE (MODEL 3 3400 SERIES) HOLD DOWN CHAIN HAD BEEN CUT | | WITH CHAIN CUTTERS AND THE GAUGE WAS MISSING. THE TROXLER MOISTURE DENSITY | | GAUGE CONTAINED AN 8 mCi CESIUM-137 SOURCE AND A 40mCi Am-241(Be) SOURCE. | | THE GAUGE WAS DOUBLE LOCKED AND IN ITS CASE WHEN IT WAS STOLEN. THE | | LICENSEE NOTIFIED THE STATE OF NEVADA HEALTH DEPARTMENT OF THE GAUGE BEING | | STOLEN AND THEY NOTIFIED THE LAS VEGAS METRO POLICE THE NEXT DAY (01/27/99) | | THAT THE TROXLER MOISTURE DENSITY GAUGE HAD BEEN STOLEN. THE METRO POLICE | | SAID THAT THEY WOULD COME OUT AND INVESTIGATE THE INCIDENT IN 2 OR 3 DAYS. | | THE LICENSEE WAS GIVEN THE PHONE NUMBER FOR THE STATE OF NEVADA | | RADIOLOGICAL HEALTH SECTION DEPARTMENT AND WAS ASKED TO CALL THEM. THE | | LICENSEE SAID THAT THEIR RADIATION SAFETY OFFICER WAS HANDLING THIS EVENT. | | THE LICENSEE SAID THAT NRC REGION 4 HAD BEEN NOTIFIED OF THE EVENT. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 35320 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: HATCH REGION: 2 |NOTIFICATION DATE: 01/28/1999| | UNIT: [] [2] [] STATE: GA |NOTIFICATION TIME: 14:07[EST]| | RXTYPE: [1] GE-4,[2] GE-4 |EVENT DATE: 01/28/1999| +------------------------------------------------+EVENT TIME: 12:02[EST]| | NRC NOTIFIED BY: BARNES |LAST UPDATE DATE: 01/28/1999| | HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |BRIAN BONSER R2 | |10 CFR SECTION: | | |AESF 50.72(b)(2)(ii) ESF ACTUATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | |2 N N 0 Hot Shutdown |0 Hot Shutdown | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | GROUP 2 ISOLATION DUE TO REACTOR WATER LEVEL LESS THAN 3 INCHES. | | | | A GROUP 2 ISOLATION OCCURRED WHEN THE REACTOR WATER LEVEL DECREASED TO 1 | | INCH FOLLOWING A PREPLANNED MANUAL REACTOR SCRAM DURING A PLANNED PLANT | | SHUTDOWN. THE FOLLOWING VALVES CLOSED AS PART OF THE GROUP 2 ISOLATION | | SIGNAL: FISSION PRODUCT MONITOR VALVES (2D11-F050, F051, F052, F053, F071, | | & F072), PRIMARY CONTAINMENT 18 INCH VENT VALVES (2T48-F319 & F320), PRIMARY | | CONTAINMENT PURGE VALVES (2T48-F309 & F324), H2-O2 ANALYZER VALVES | | (2P33-F002, F004, F005, F007, F012, F013, & F015), AND DRYWELL EQUIPMENT | | DRAIN SUMP ISOLATION VALVES (2611-F003 & F004). THE REACTOR WATER LEVEL WAS | | RESTORED TO GREATER THAN 3 INCHES AND ALL VALVES WERE REOPENED WITHIN 5 | | MINUTES. THE CAUSE OF THE LOW LEVEL WAS DUE TO THE VOIDS COLLAPSING AND | | RECOVERY WAS NOT QUICK ENOUGH TO PREVENT THE ISOLATION. | | | | THE RESIDENT INSPECTOR WAS NOTIFIED. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Other Nuclear Material |Event Number: 35321 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: US ARMY TNG & DOCTRINE COMD |NOTIFICATION DATE: 01/28/1999| |LICENSEE: US ARMY TNG & DOCTRINE COMD |NOTIFICATION TIME: 16:03[EST]| | CITY: FORT KNOX REGION: 2 |EVENT DATE: 01/19/1999| | COUNTY: STATE: KY |EVENT TIME: [CST]| |LICENSE#: AGREEMENT: Y |LAST UPDATE DATE: 01/28/1999| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |BRIAN BONSER R2 | | | | +------------------------------------------------+ | | NRC NOTIFIED BY: POTTER | | | HQ OPS OFFICER: CHAUNCEY GOULD | | +------------------------------------------------+ | |EMERGENCY CLASS: N/A | | |10 CFR SECTION: | | |BAB1 20.2201(a)(1)(i) LOST/STOLEN LNM>1000X | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | THE US ARMY TRAINING AND DOCTRINE COMMAND SUSPECTS THEY HAVE BURIED TWO | | TRITIUM EXIT LIGHT SIGNS IN A LANDFILL ON POST. | | | | THESE SIGNS WERE REMOVED FROM TWO BUILDINGS ON POST AND ON 11/10/99 AND | | 12/15/98, THE RADIATION SAFETY OFFICER ASKED WHAT HAPPENED TO THE SIGNS, BUT | | RECEIVED NO RESPONSE. ON 01/19/99 IT WAS VERIFIED THAT THE TWO SIGNS | | CONTAINING 9.5 CURIES EACH OF TRITIUM WERE BURIED ON A POST LANDFILL. THEY | | WILL MAKE NO ATTEMPT TO RECOVER THE SIGNS. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 35322 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: HATCH REGION: 2 |NOTIFICATION DATE: 01/28/1999| | UNIT: [] [2] [] STATE: GA |NOTIFICATION TIME: 17:20[EST]| | RXTYPE: [1] GE-4,[2] GE-4 |EVENT DATE: 01/28/1999| +------------------------------------------------+EVENT TIME: 16:30[EST]| | NRC NOTIFIED BY: BARNES |LAST UPDATE DATE: 01/28/1999| | HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |BRIAN BONSER R2 | |10 CFR SECTION: | | |ASHU 50.72(b)(1)(i)(A) PLANT S/D REQD BY TS | | |NLCO TECH SPEC LCO A/S | | |AESF 50.72(b)(2)(ii) ESF ACTUATION | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | |2 N N 0 Hot Shutdown |0 Hot Shutdown | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | THE PLANT ENTERED LCO ACTION STATEMENT DUE TO TWO ADS VALVES BEING | | INOPERABLE. | | | | THIS CONDITION OCCURRED WHEN 2B21-F013K SAFETY RELIEF VALVE OPENED AND THE | | PROCEDURE (34AB-OPS-007-1) DIRECTS OPERATORS TO REMOVE FUSES, WHICH WAS | | DONE, TO CLOSE THE VALVE. POWER REMOVED FROM THIS VALVE AND POWER | | PREVIOUSLY REMOVED FROM THE 2B21-F013C VALVE DUE TO A DC GROUND, PUT THE | | PLANT IN A TS LCO ACTION STATEMENT TO BE IN MODE 3 (WHICH THEY ARE CURRENTLY | | IN) WITHIN 12 HOURS AND BE BELOW 150 PSIG WITHIN 36 HOURS. THE PLANT IS | | CURRENTLY AT 300 PSIG AND PROCEEDING TO COLD SHUTDOWN. | | | | THE RESIDENT INSPECTOR WAS NOTIFIED. | | | | *** UPDATE ON 1/28/99 @ 1846 BY COLEMAN TO GOULD *** | | | | THE LICENSEE DETERMINED THAT THE OPENING OF THE ADS VALVE WAS ALSO AN ESF | | ACTUATION. | | | | THE LICENSEE PLANS TO INFORM THE RESIDENT INSPECTOR. | | | | THE NRC OPERATIONS OFFICER NOTIFIED THE R2DO (BRIAN BONSER). | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021