The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for January 5, 1999

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           01/04/1999 - 01/05/1999

                              ** EVENT NUMBERS **

35200  35212  35214  

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   35200       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SURRY                    REGION:  2  |NOTIFICATION DATE: 12/28/1998|
|    UNIT:  [1] [2] []                STATE:  VA |NOTIFICATION TIME: 11:16[EST]|
|   RXTYPE: [1] W-3-LP,[2] W-3-LP                |EVENT DATE:        12/28/1998|
+------------------------------------------------+EVENT TIME:        11:00[EST]|
| NRC NOTIFIED BY:  JAMES HELM                   |LAST UPDATE DATE:  01/04/1999|
|  HQ OPS OFFICER:  DOUG WEAVER                  +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |PIERCE SKINNER       R2      |
|10 CFR SECTION:                                 |                             |
|AESS 50.72(b)(1)(v)      EMERGENCY SIREN INOP   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| EMERGENCY SIRENS INOPERABLE DUE TO WINTER WEATHER                            |
|                                                                              |
| Virginia Power polled the 61 emergency sirens around Surry and found 17 that |
| did not respond.  Troubleshooting is in progress on the sirens in question.  |
| The cause of the failures is believed to be freezing rain which passed       |
| through the area on 12/24/98.  The polling was completed at 1100 EST this    |
| morning.                                                                     |
|                                                                              |
| The licensee informed the NRC resident inspector and the State of Virginia   |
| Department of Emergency Services.                                            |
|                                                                              |
| ***UPDATE AT 1012 EST ON 01/04/99 FROM WEBSTER TAKEN BY MACKINNON***         |
|                                                                              |
| The licensee reported that the emergency sirens were returned to service at  |
| 0930 EST on 01/04/99.                                                        |
|                                                                              |
| NRC resident inspector was notified of this event update by the licensee.    |
| The NRC operations officer notified the R2DO (Pierce Skinner).               |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   35212       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: CLINTON                  REGION:  3  |NOTIFICATION DATE: 01/02/1999|
|    UNIT:  [1] [] []                 STATE:  IL |NOTIFICATION TIME: 08:51[EST]|
|   RXTYPE: [1] GE-6                             |EVENT DATE:        01/02/1999|
+------------------------------------------------+EVENT TIME:        07:45[CST]|
| NRC NOTIFIED BY:  MARSHALL FUNKHOUSER          |LAST UPDATE DATE:  01/04/1999|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |MONTE PHILLIPS       R3      |
|10 CFR SECTION:                                 |JOHN HANNON          NRR     |
|AARC 50.72(b)(1)(v)      OTHER ASMT/COMM INOP   |ROSEMARY HOGAN       IRD     |
|                                                |JOSEPH HIMES         RCT     |
|                                                |CHARLES MILLER       NRR     |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          N       0        Cold Shutdown    |0        Cold Shutdown    |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| LICENSEE CONCLUDED THAT THE EMERGENCY RESPONSE ORGANIZATION COULD NOT MEET   |
| THE STAFFING TIME REQUIREMENT DUE TO ADVERSE WEATHER CONDITIONS.             |
|                                                                              |
| THE FOLLOWING TEXT IS A PORTION OF A FACSIMILE RECEIVED FROM THE LICENSEE:   |
|                                                                              |
| "10CFR50.72(b)(v) REQUIRES THE FACILITY TO NOTIFY THE NRC OPERATIONS CENTER  |
| DURING ANY EVENT THAT RESULTS IN THE MAJOR LOSS OF EMERGENCY OFFSITE         |
| RESPONSE CAPABILITY."                                                        |
|                                                                              |
| "WEATHER CONDITIONS HAVE DETERIORATED DRIVING CONDITIONS PREVENTING MULTIPLE |
| PERSONNEL FROM REACHING THE PLANT.  BASED ON THESE RESULTS AND PRESENT       |
| WEATHER CONDITIONS, IT IS DOUBTFUL THAT THE EMERGENCY RESPONSE ORGANIZATION  |
| WOULD BE FILLED WITHIN THE REQUIRED TIME.  THUS, THIS NOTIFICATION [IS]      |
| BEING MADE."                                                                 |
|                                                                              |
| THE LICENSEE PLANS TO INFORM THE NRC RESIDENT INSPECTOR.                     |
|                                                                              |
| ***UPDATE ON 01/04/99 AT 1240 EST FROM R. POWERS TAKEN BY MACKINNON***       |
|                                                                              |
| WEATHER AND DRIVING CONDITIONS ARE NO LONGER HAZARDOUS, AND THE LICENSEE CAN |
| FILL THE  EMERGENCY RESPONSE ORGANIZATION POSITIONS AS OF 1135 CST ON        |
| 01/04/99.                                                                    |
|                                                                              |
| THE NRC RESIDENT INSPECTOR WAS NOTIFIED OF THIS UPDATE BY THE LICENSEE.  THE |
| NRC OPERATIONS OFFICER NOTIFIED THE R3DO (BRENT CLAYTON).                    |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   35214       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SAN ONOFRE               REGION:  4  |NOTIFICATION DATE: 01/05/1999|
|    UNIT:  [] [2] []                 STATE:  CA |NOTIFICATION TIME: 03:19[EST]|
|   RXTYPE: [1] W-3-LP,[2] CE,[3] CE             |EVENT DATE:        01/04/1999|
+------------------------------------------------+EVENT TIME:        20:51[PST]|
| NRC NOTIFIED BY:  HOWARD SMITH                 |LAST UPDATE DATE:  01/05/1999|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |JOSEPH TAPIA         R4      |
|10 CFR SECTION:                                 |                             |
|AINB 50.72(b)(2)(iii)(B) POT RHR INOP           |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     N          N       0        Cold Shutdown    |0        Cold Shutdown    |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| LICENSEE DETERMINED THAT THE CCW SYSTEM MAY NOT  MEET ITS REQUIREMENT TO     |
| OPERATE FOR 7-DAYS WITHOUT MAKE-UP FOLLOWING A SEISMIC EVENT                 |
|                                                                              |
| "AT SAN ONOFRE, THE COMPONENT COOLING WATER (CCW) SYSTEM IS REQUIRED TO      |
| PROVIDE COOLING FOR 7 DAYS WITHOUT MAKE-UP.  CCW TRAINS A AND B ARE          |
| SEISMICALLY QUALIFIED; THE NON-CRITICAL LOOP IS NOT SEISMICALLY QUALIFIED.   |
|                                                                              |
| "UNIT 2 ENTERED MODE 5 AT APPROXIMATELY 0544 PST ON JANUARY 3, 1999, FOR A   |
| PLANNED REFUELING/MAINTENANCE OUTAGE.  AT 2051 ON JANUARY 4, 1999, WHILE     |
| UNIT 2 WAS IN MODE 5, SCE DETERMINED THAT ISOLATION VALVE LEAKAGE BETWEEN    |
| CCW TRAIN B AND THE CCW NON-CRITICAL LOOP OBSERVED DURING A TS SURVEILLANCE  |
| EXCEEDED IT ACCEPTABLE LIMIT FOR OPERATION IN MODES 1 THROUGH 4 AND TRAIN B  |
| CCW COULD HAVE BEEN INOPERABLE PRIOR TO SHUT DOWN.  TESTS WERE PERFORMED TO  |
| ATTEMPT TO DETERMINE WHETHER THIS LEAKAGE EXISTED DURING OPERATION IN MODES  |
| 1 THROUGH 4 PRIOR TO PLANT SHUT DOWN.  HOWEVER, THE TESTS WERE UNABLE TO     |
| DETERMINE THAT THE LEAKAGE DID NOT EXIST PRIOR TO SHUT DOWN.  DURING THE     |
| PAST CYCLE OF PLANT OPERATION, IF A SEISMIC EVENT WERE TO HAVE OCCURRED      |
| WHILE TRAIN A WAS OUT OF SERVICE, THERE WAS A POTENTIAL FOR THE CCW TO FAIL  |
| TO MEET ITS REQUIRED 7-DAYS OF OPERATION WITHOUT MAKEUP.  THEREFORE, SCE IS  |
| CONSERVATIVELY MAKING THIS REPORT AS A NON-EMERGENCY 4-HOUR REPORT IN        |
| ACCORDANCE WITH 10CFR50.72(b)(2)(iii) - A CONDITION THAT ALONE COULD HAVE    |
| PREVENTED THE FULFILLMENT OF THE SAFETY FUNCTION OF THE CCW.                 |
|                                                                              |
| "CCW IS PRESENTLY CAPABLE OF PERFORMING ITS SUPPORT FUNCTION FOR SHUT DOWN   |
| COOLING IN MODES 5 AND 6.  THE ISOLATION VALVES' ACTUATORS WERE              |
| DISCONNECTED, THE VALVES WERE MANUALLY SEATED.  THE MEASURED LEAKAGE WAS     |
| WELL BELOW THE ACCEPTABLE LEVEL FOR OPERATION IN MODES 1 THROUGH 4.  THE     |
| ACTUATORS WERE RE-CONNECTED TO PROVIDE FOR REMOTE OPERATION.  THE            |
| INVESTIGATION OF THE CAUSE AND CORRECTIVE ACTIONS IS ON-GOING..              |
|                                                                              |
| "UNIT 3 IS IN MODE 1 AND UNAFFECTED BY THIS CONDITION."                      |
|                                                                              |
| THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.                            |
+------------------------------------------------------------------------------+
